(PRS of River Amlakhadi) National Mission for Clean Ganga Monthly Progress Report of Gujarat State for March -20 (Hon’ble NGT in the matter of OA No.673/2018 dated 06/12/2019) Sl.No. Activity to be monitored Timeline Submission of Progress by States/UT- Compliance Status 1 Ensure 100% treatment of sewage at 31.03.2020 Presently there is no any proposal for in-situ least in-situ remediation remediation. However, as per the suggestion given by Assessment team during meeting held on 04/02/2020, NEERI, UP Govt., Punjab Gov. etc may be approached by UDD/GUDM/Concerned for technical support in the matter Commencement of setting up of STPs 31.03.2020 Ankleshwar STP (14 MLD):- may be and connecting all the drains and other completed by March-2021 sources of generation of sewage to the STPs must be ensured PRH & RDD was informed to submit the action plan for the sewage generated from the villages (2.75 MLD) 2 Timeline for completing all steps of 31.03.2021 14 MLD STP (Ankleshwar Nagar Palika):- action plans including completion of March -2021 setting up of STPs and their PRH & RDD was informed to submit the commissioning action plan for the sewage generated from the villages 3 Chief Secretaries may set up 22.01.2020 Quarterly RRC meeting held at GPCB, appropriate monitoring mechanism at Gandhinagar to review the progress & State level minutes of the same (having progress Specifying accountability of status) is regularly submitted to CPCB nodal authorities not below the Secretary Level Reviews of all NGT matters are taken Chief Secretaries may have an 22.01.2020 frequently under chairmanship of Hon’ble accountable person attached in CS (Last meeting was conducted on their office for this purpose. 24/12/2019) in matter of O.A. No.:- Monitoring at State level must 606/2018 take place Fortnightly commenci ng 21.12.2019 4 Progress report may be furnished by Monthly Noted & Complied the States/UTs to (preferably Secretary, Ministry of Jal Shakti before 20th Member Secretary, CPCB of every month) 5 Progress Report may be comprised of details along with completion timelines on: (i) Identification of polluting Identification of polluting sources including sources including drains drains contributing to river pollution is contributing to river already completed and submitted in the PRS pollution and action as per action plan which is already approved by NGT order on in-situ CPCB w.r.t Priority I and II. treatment In-situ treatment:- Pl. refer point no:-1 (PRS of River Amlakhadi) (ii) Status of STPs, I&D and Existing infrastructure: 22.5 MLD (only 7.5 sewerage networks MLD capacity is utilized for the sewage Details of existing generated from Notified area) infrastructure, gap analysis, Gap: 10.75 MLD (due to sewage generated proposed along with from Nagarpalika and nearby villages) completion timeline Proposed : 14 MLD Completion Timeline : March-2021 Proposed plan with present status:- Ankleshwar STP (14 MLD):- may be completed by March-2021 PRH & RDD was informed to submit the action plan for the sewage generated from the villages (2.75 MLD) (iii) Status of CETPs There is no any direct waste water discharge Details of existing CETP and from any CETP in to Amlakhadi ETP infrastructure, gap analysis, proposed along with completion timeline, no. of industries and complying status (iv) Status of Solid Waste 5 (iv) Status is attached as Annexure – I Management & Details of Processing Facilities Details of existing infrastructure, gap analysis, proposed along with completion timeline (v) Latest water quality of 5 (v) Status is attached as Annexure –II polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river (vi) Preventing dumping of Bio-Medical Waste:- waste and scientific waste There are total 321 # of HCUs (Health Care management including bio- Units) located in the Ankleshwar taluka, medical wastes, plastic treatment wastes and decentralizing & disposal of Bio Medical Waste of which is waste processing, including being taken care of by a common facility waste generated from M/s, Globe Bio Care located in GIDC hotels, ashrams etc. Ankleshwar Industrial Waste:- In the State, all hazardous waste generating units are consented with the authorization under Haz. Waste Management Rules, amended time to time & they are disposing their waste to TSDF/CHWIF/registered recycler under Rule-9/Co-processing and as per consented conditions (PRS of River Amlakhadi) (vii) Ground water regulation GWRDC has given details about the recently framed draft bill titled “Conservation, Protection, Regulation and Management of Ground Water in Gujarat State” in the meeting held on 04/02/2020 at GPCB with PRS Assessment Team nominated by Ministry of Jal Shakti which is in process and within 3 months to be submitted to the Assembly. (viii) Adopting good irrigation Details w.r.t point no. 5 (viii), (ix), (x), (xi) practices given by Irrigation Dept. as on date is (ix) Protection and attached as Annexure – III. management of Flood Plain Zones (FPZ) (x) Rain water harvesting (xi) Maintaining minimum environmental flow of river (xii) Plantation on both sides of Details w.r.t point no. 5 (xii) given by Forest the river Dept. /PCCF/ACCF/Concerned as on date is attached as Annexure – IV (xiii) Setting up biodiversity parks GBB informed during the meeting held on on flood plains by removing 04/02/2020 at GPCB with PRS Assessment encroachment Team nominated by Ministry of Jal Shakti about proposal sent by them to CAMPA for funding of around Rs. 5 crore for the development of Biodiversity Park. Team suggested tying up with AMC as they already have some plan to develop Biodiversity park at Khari under NRCP. (PRS of River Amlakhadi) Annexure- I 5 (iv) Status of Solid Waste Management & Details of Processing Facilities: Types of Generat Collection/Sto Disposal/Trea Total Gap Proposed Time Remarks Present Status Waste/ ed rage facility tment facility with action plan limit Characte Quantit with capacity with capacity generation /facility to ristic of y (MT/Day) along with & existing cover gap waste (MT/Da location treatment y) facilities if any Anklesh 23 10 MT/Day dry 13 MT/day 10 MT/day Installing Dec Earlier it was decided by Ankleshwar Notified war waste and 13 kitchen waste MSW 2019 Board of Management of area: For MSW plot no Notified MT/Day disposed to processing Notified Area, GIDC. 9207 admeasuring 14000 Area Kitchen Waste Bio gas plant plant Ankleshwar to give O & SQMT is allotted by MSW of BEIL Of 10 MTD WASTE Capacity M for MSW plot for five GIDC. Kitchen waste of years and for the same housing area is dumped estimate was prepared to BEIL, Ankleshwar. and DPR is almost ready Estimate work for for inviting tender. But development of MSW there is problem with site as per MSW Rules the disposal of existing 2016 is under process dumped solid waste. And and same may approved broadly discussed about and tender of the same this problem and Now will be done in 5 to 6 Board has decided to months. Door to door prepare estimate MSW collected from considering disposal of GIDC area is dumped to existing dumped waste plot no 9207. GIDC, in the plot allotted for Ankleshwar. MSW purpose. So, (PRS of River Amlakhadi) Earlier the time for tendering work was given up to Dec-2019 but now the same is to be revised and it will be published up to May- 2020. Anklesh 23.54 23.54 14.64 TPD 0 - - Ankleshwar Nagar - war (Wet Waste Palika- MSW collected Nagar being from household of Palika processed at Ankleshwar town is MSW Compost WASTE plant-25 TPD segregated for Amboli road, converting 15 MT of Ankleshwar) inorganic fertilizer and 08.50 TPD plastic waste is used for (Dry Waste making molds. being segregated & sold out to recyclers) 00.40 TPD (Mix Waste to be disposed at dump site) Total 46.54 36.54 -- 10 MT -- -- -- (PRS of River Amlakhadi) Annexure-II (Amlakhadi) 5 (v) Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river Progress/Status Report of the River/PRS water quality monitoring for the Month March -20: Sr.no. Location ID Name of Parameter Location DO (mg/l) pH BOD COD Total coliform Fecal coliform (mg/l) (mg/l) (MPN/ 100ml) (MPN/100 ml) 1434 33440 Low Level bridge BDL 7.70 14 76 1700 230 1980 32618 Pungam 1.74 7.85 6 38 330 170 Progress /Status Report for Ground water quality monitoring pertaining to PRS River (March -2020): Location Name of Location Parameter ID pH BOD COD Cu mg/l T.Cr. H.Cr. Fe Pb Mn Ni Zn (mg/l) (mg/l) mg/l mg/l mg/l mg/l mg/l mg/l mg/l 50634 Gujarat Gas Office, 7.30 0.29 5 0.011 BDL BDL 1.726 0.023 -- 0.020 NA Umervada 50635 Vill. Juna Pungam 8.12 0.42 5 0.003 BDL BDL 0.170 BDL -- BDL NA Vill. Bhadkodra -- -- -- -- -- -- -- -- -- -- -- Vill. Kosmadi -- -- -- -- -- -- -- -- -- -- -- Piraman Gram Panchayat -- -- -- -- -- -- -- -- -- -- -- Vill. Sakarporbhatha -- -- -- -- -- -- -- -- -- -- -- (PRS of River Amlakhadi) Drains details with Flow: Sr. Location Name of Inletting River/Drain Discharge MLD No. Max Min 1 GIDC Ankleshwar Valia Chokdi Ankleshwar 7.5 3 GIDC STP w/w stream/Ankleshwar GIDC drain* 2 Ankleshwar Station side Ankleshwar Station side drain nr Low level 0.5 0.2 drain bridge 3 Piraman village Domestic w/w stream of Piraman village 0.25 0.1 4 Ankleshwar Nagar Palika Ankleshwar Town drain 6.45 2.01 Oxidation pond overflow 5 Ankleshwar Nagar Palika Juna Diva Drain 0.5 0 Juna Diva 6 Ankleshwar Nagar Palika Surti Bhagor drain 0.05 0 Surti Bhagor drain (PRS of River Amlakhadi) Annexure-III Details w.r.t point no.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages185 Page
-
File Size-