Bobble Beret

Bobble Beret

Bobble Beret by Beth Lutz LEVEL OF EXPERIENCE: Intermediate FINISHED MEASUREMENTS: One Size – Adult YARN: ASTRAL by The Alpaca Yarn Company, 50% Tencel, 30% Alpaca, 20% Wool, (100g = 197 yds) 1 Hank NEEDLES: US # 5 (3.75 mm) & #6 (4 mm) DP and or 16” circular NOTIONS: Tapestry needle & stitch markers. GAUGE : 5 st = 1” in st st on larger needles. TAKE TIME TO CHECK YOUR GAUGE. Bobble Beret B 43 41 39 B B 37 35 ABBREVIATIONS 33 31 dpn double point needle 29 k knit 27 k2tog knit 2 together 25 lh left hand 23 p purl 21 pm place marker 19 rh right hand B 17 rs right side 15 sl slip 13 ssk slip 2 sts individually, insert LH needle 11 into RH needle from L to R and k the sts 9 together 7 st(s) stitch(es) 5 ws wrong side 3 yo yarn over 1 Beret Legend Cast on 96 sts with smaller needles using a provisional cast on. Join work and place a marker. Work k1, p1 rib Knit for 8 rounds. Next round, k2tog, yo around. Work 8 Yarn Over more rounds in k1, p1 rib. Remove the provisional cast on, placing sts on spare needles. Hold the cast on sts Knit 2 tog behind the stitches just worked and k 1 from front needle SSK and 1 from back needle together. This will invisibly join No Stitch the cast on edge to the top of the ribbed band. K one B Bobble more round. Sl 2 tog as if to K, k1 Begin working chart, knitting all sts on even rows. sl 2 sl st over Note: In round 25, sl the 1st st of the round to the 4th needle to be worked at the end of the round. If working on dpn’s, you will need the first st from the next needle to complete Techniques & Special Stitch Instructions: the pattern repeat. If working on circ needles, change to dpn’s when work becomes too tight to fit on needles. Provisional Cast On – see our website for instructions on both knit & crochet provisional FINISHING cast ons. www.thealpacayarnco.com/ Weave in all tails. Beret can be blocked over a dinner patterninstructions plate or similarly shaped item. Bobble – k in the front, then back, then front, then back, then front of the same stitch. Turn work and p5. Turn work and pass the 2nd, 3rd, 4th & 5th st over the first st on the LH needle. K the stitch again and continue in pattern. A Product of The Alpaca Yarn Company PT-127 Copyright 2009 The Alpaca Yarn Company.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us