World Bank Document

World Bank Document

China: Wenchuan Earthquake Recovery Project –Gansu Part Loan No. 46354-CN / (P114107) Procurement Plan as of 30 July 2009 - Final Approved Public Disclosure Authorized I. General 1. Project information: Country: China Borrower: People’s Republic of China Project Name: Wenchuan Earthquake Recovery and Reconstruction Project- Gansu part Project ID: P 114107 Project Implementing Agency (PIA): Gansu Longnan Municipal PMO (LPMO) will coordinate and supervise all procurement activities. The PIAs for each project component are described as follows: Public Disclosure Authorized No. SP Project Sub-component PIA No. Infrastructure 1 1.1 Cheng County: Reconstruction of East River Bridge, Width Chen County 30m Construction Bureau 2 1.6 Kang County: New construction of No.1 Road -West Section Kan County (Length:1,510 m, Width: 12m) Construction New construction of Sujiayuan Bridge (Length 2x18 m, Bureau Width 12m) and a pedestrian bridge (Length 20 m, Width 6m) Public Disclosure Authorized Rehabilitation and upgrading of Renmin Bridge (Length 2x18m, Width 16 m) 3 1.3 Cheng County: Restoration of an existing WWTP (of capacity Cheng County 12,500m3/day), and repair/construction of 49.8 km sewage Water and pipelines (19 km for restoration of combined sewer to storm Wastewater water pipe, and 30.8 km for newly construction of separated Company sewer) 4 1.5 Newly construction of a raw water intake (infiltration gallery), Kan County a new WTP (6,000 m3/day), and 3km of drinking water Construction transmission pipe from new WTP to existing distribution Bureau network 5 1.7 Liangdang County: New construction of four roads (total Liangdang length: 2.67km) and rehabilitation of five roads (total length: County Public Disclosure Authorized 1.68km) including related traffic and Construction Bureau Health P No. SP Project Sub-component PIA No. 1 2.2 Reconstruction of Cheng County People’s Hospital with the Chen County capacity of 300 beds People’s Hospital 2 2.3 Reconstruction of Cheng County Traditional Chinese Hospital Chen County with the capacity of 100 beds Traditional Chinese Hospital 3 2.4 Reconstruction of inpatient Building of Hui County People’s Hui County Hospital with the capacity of 200 beds People’s Hospital 4 2.5 Reconstruction of Hui County Traditional Chinese Hospital Hui County with the capacity of 60 beds Traditional Chinese Hospital 5 2.6 Reconstruction of inpatient Building of Xihe County People’s Xihe County Hospital with the capacity of 300 beds People’s Hospital 6 2.7 Reconstruction of Xihe County Traditional Chinese Hospital Xihe County with the capacity of 100 beds Traditional Chinese Hospital 7 2.8 Reconstruction of Liangdang County People’s Hospital with Liangdan the capacity of 120 beds County People’s Hospital Education 1 3.1 Cheng County Chengzhou High School including new Cheng County construction—30000M , sport ground—1800 M, 6 items of Education other auxiliary facilities Bureau 2 3.3 No. 3 Secondary School of Hui County including School Hui County building 3000 M including new construction—2000 M, Education rehabilitation—1000 M, 5 items—other auxiliary facilities Bureau 3 3.4 Vocational School of Hui County including school building— Hui County 12000 M, 4 items—other auxiliary facilities Education Bureau 4 3.5 No. 3 Secondary School of Wen County including School Wen County building 17172 M including new construction—11272 M, Education sport ground—5900 M, 6 items—other auxiliary facilities Bureau 5 3.6 Vocational School of Kang County School building 21700 M Kang County P No. SP Project Sub-component PIA No. including new construction—21700 M, sport ground—1000 Education M Bureau 6 3.7 No. 2 Secondary School of Kang County including School Kang County building 7460 M including new construction—6860M, sport Education ground—600 M, 3 items-other auxiliary facilities Bureau 7 3.8 No. 1 Secondary School of Xihe County including School Xihe County building 17300 M, sport ground—9000 M, other auxiliary No. 1 Middle facilities School 2. Bank’s approval Date of the procurement Plan: July 30, 2009 3. Date of General Procurement Notice: March 10, 2009 4. Period covered by this procurement plan: July 2009-December 2010 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Thresholds Proposed (USD) Goods 0.5 million Works 10 million Plus first contract in each sector 2. Prequalification: Not applied. 3. Any Other Special Procurement Arrangements: N/A. P 4. Procurement Packages with Methods and Time Schedule Note: Exchange rate US$=6.85 RMB 1 2 3 4 5 6 7 8 9 Ref. Contract (Description) Est. Cost Est. Cost Procure- Prequali- Review by Expecte Est. No. (RMB (US$ ment fication Bank (Prior Bid- Construct- million) million) Method (yes/no) / Post) Opening ion Period Date (days) INFRASTRUCTURE CIR- Cheng County: Reconstruction of East River Bridge, 20.28 2.982 NCB Works No Prior 10/10/09 300 W1 Width 30m KIR- Kang County: New construction of No.1 Road -West 9.14 1.344 NCB Works No Post 09/22/09 240 W1 Section (Length:1,510 m, Width: 12m). New construction of Sujiayuan Bridge (Length 2x18 m, Width 12m) and a pedestrian bridge (Length 20 m, Width 6m). Rehabilitation and upgrading of Renmin Bridge (Length 2x18m, Width 16 m) CIU- Cheng County: Restoration of an existing WWTP (of 36.92 5.429 NCB Works No Prior 09/29/09 360 W2 capacity 12,500m3/day), and repair/construction of 49.8 km sewage pipelines (19 km for restoration of combined sewer to storm water pipe, and 30.8 km for newly construction of separated sewer) KIU- Kang County: Newly construction of a raw water intake 10.41 1.531 NCB Works No Post 10/08/09 360 W1 (infiltration gallery), a new WTP (5,000 m3/day), and 3km of drinking water transmission pipe from new WTP to existing distribution network LIR-W1 Liangdang County: New construction of four roads (total 24.21 3.560 NCB Works No Post 11/12/09 330 length: 2.67km) and rehabilitation of five roads (total length: 1.68km) including related traffic and drainage facilities HEALTH CH-W1 Reconstruction of Chen County People’s Hospital with 44.33 6.52 NCB Works No Prior 10/20/09 390 the capacity of 300 beds CH-W2 Reconstruction of Chen County Traditional Chinese 12.92 1.90 NCB Works No Post 10/28/09 300 Hospital with the capacity of 150 beds HH-W1 Reconstruction of inpatient Building of Hui County 29.72 4.37 NCB Works No Post 11/08/09 360 People’s Hospital with the capacity of 200 beds HH-W2 Reconstruction of Hui County Traditional Chinese 13.64 2.01 NCB Works No Post 11/14/09 300 Hospital with the capacity of 120 beds XH-W1 Reconstruction of inpatient Building of Xihe County 21.15 3.11 NCB Works No Prior 09/23/09 330 People’s Hospital with the capacity of 300 beds XH-W2 Reconstruction of Xihe County Traditional Chinese 12.67 1.86 NCB Works No Post 10/21/09 300 P 1 2 3 4 5 6 7 8 9 Ref. Contract (Description) Est. Cost Est. Cost Procure- Prequali- Review by Expecte Est. No. (RMB (US$ ment fication Bank (Prior Bid- Construct- million) million) Method (yes/no) / Post) Opening ion Period Date (days) Hospital with the capacity of 150 beds LH-W1 Reconstruction of Liangdan County People’s Hospital 13.9 2.04 NCB Works No Post 11/29/09 300 with the capacity of 150 beds EDUCATION CE-W1 Cheng County Chengzhou High school including new 58.96 8.67 NCB Works No Prior 10/17/09 360 construction—30000M , sport ground—1800 M, 6 items of other auxiliary facilities HE-W2 No. 3 Secondary School of Hui County including 5.63 0.83 NCB Works No Post 10/30/09 270 School building 3000 M including new construction— 2000 M, rehabilitation—1000 M, 5 items—other auxiliary facilities HE-W3 Vocational School of Hui County including school 18.58 2.73 NCB Works No Post 11/19/09 300 building—12000 M, 4 items—other auxiliary facilities WE-W1 No. 3 Secondary School of Wen County including 21.54 3.17 NCB Works No Post 10/24/09 300 School building 17172 M including new construction— 11272 M, sport ground—5900 M, 6 items—other auxiliary facilities KE-W1 Vocational School of Kang CountySchool building 33.38 4.91 NCB Works No Post 11/11/09 330 21700 M including new construction—21700 M, sport ground—1000 M KE-W2 No. 2 Secondary School of Kang County including 9.13 1.34 NCB Works No Post 10/21/09 270 School building 7460 M including new construction— 6860M, sport ground—600 M, 3 items-other auxiliary facilities XH-W1 No. 1 Secondary School of Xihe County including 29.14 4.29 NCB Works No Prior 10/08/09 360 School building 17300 M, sport ground—9000 M, other auxiliary facilities P III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Prior Review Thresholds Proposed (USD) Consulting All QCBS, 0.05 million for individuals, all SSS Service 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 300,000 or equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us