Environment Impact Assessment Report Proposed Lakhpat Cement Works (Integrated Project)

Environment Impact Assessment Report Proposed Lakhpat Cement Works (Integrated Project)

ENVIRONMENT IMPACT ASSESSMENT REPORT PROPOSED LAKHPAT CEMENT WORKS (INTEGRATED PROJECT) CEMENT PLANT OF PRODUCTION CAPACITY 10MTPA CLINKER, 10MTPA CEMENT & 99MW CPP (INCLUDING 24MW WHRS); LIMESTONE MINE FOR 12MTPA FROM 251.9HA AREA AND BERTHING JETTY OF 19MTPA CAPACITY Village: Maldo, Mudhvay, Koriyani & Kapurasi, Taluka: Lakhpat, District: Kutch, Gujarat PROJECT PROPONENT: ADANI CEMENTATION LIMITED (ACL), GUJARAT ENVIRONMENT CONSULTANT: GREENCINDIA CONSULTING PRIVATE LIMITED, GHAZIABAD, UTTAR PRADESH NABET/EIA/1619/RA0058 OCTOBER 2019 NABET Disclosure FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project} A Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District Kutch (Gujarat} NABET DISCLOSURE Declaration by Experts contributing to Final EIA Report for Lakhpat Cement Works (Integrated Project} Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District Kutch (Gujarat} I, hereby, certifythat we were part of the team in the following capacity that developed the above EIA. EIA COORDINATOR 01. 1 (a)Mining of Minerals 02. 3(b)Cement Plant Name of EC K.D Choudhury Signature & Date Period of Involvement September 2017 TO Till date Contact Information 607-611, Level-5, Shopprix Mall, Vaishali, Ghaziabad F unc1onaf IA rea Expe rt s: Name s. Functiona Team Involvement of the Signature No I Areas Member (Period & Task) expert/s 1 WP Dr. PS Subinoy Se�tember 2017 Kelkar Monda! to Till date .__ Assessment of Impact associated �� with the project operation activities Development of Water ManaQement Plan 2 SE Nilanjan Bikash Ruj Se�tember 2017 N� Das to Till date Assessment of social impact associated with project Assistance during development of project manaQement plan . I• • • • � . � . Project Proponent: Environment Consultant: PAGE ADANI CEMENTATION LIMITED Greencindia Consulting 1 (ACL), GUJRAT Private Limited FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project} NABET Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District DISCLOSURE Kutch (Gujarat} Name s. Functiona Team Involvement No of the Signature I Areas Member (Period & Task) expert/s 3 EB Dr. PC Dipannita Segtember 2017 Kuniyal Das to Till date �-C--� Assessment of impact associated with project • Selection of species for greenery development • Assistance during development of project management plan 4 LU Nandini Bikash Segtember 2017 to Choudh Ruj Till date ury Development of Landuse Map • Impact of project Cf'a.r _bo on surrounding � Land use· • Assistance during development of project management plan • Mitigation Measures due to change in Land uses by the project 5 AP K.D Swagata Segtember 2017 to Choudh Mukherje Till date l{A./J/2 ury e Assessment of Impact associated with Construction Activities • Assessment of Impact Associated with DG Operation ENVIRONMENT CONSULTANT Project Proponent: PAGE GREENCINDIA CONSULTING ADANI CEMENTATION LIMITED 2 PRIVATE LIMITED, NCR, (ACL), GUJRAT GHAZIABAD FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project} Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District A Kutch (Gujarat} Name s. Functiona Team Involvement of the Signature No I Areas Member (Period & Task) exoert/s • Development of Management Plan 6 AQ Prof. PB Dipannita Se�tember 2017 to � Murthy Oas Till date Pi>� . - •�· • Selection of monitoring locations • Study of wind pattern and weather conditions • Quantitative assessment of project impact associated with stacks operation as power back- up and vehicle movement. 7 NV K.D Swagata Se�tember 2017 to Choudh Mukherje Till date I{� ury e Assessment of impact associated with project • Assistance during development of project management plan 8 Risk & KO Se�tember 2017 to Till date Hazards Choudh l{aa_k¥�� Assessment of risk Managem ury associated and ent-RH development of manaqement plan 9 HG Dr.Mano - Se�tember 2017 to j Kumar June 2018 �'§"\(.., • Water table ·of the area. in pre- ·s:" • Project Proponent: Environment Consultant: PAGE AbANI CEMENTATION LIMITED Greencindia Consulting 3 (ACL), GUJRAT Private Limited FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project} NABET Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District DISCLOSURE Kutch (Gujarat} Name s. Functiona Team Involvement No of the Signature I Areas Member (Period & Task) exoert/s monsoon and post monsoon season • Development of management plan 10 GEO Dr.Mano - SeQtember 2017 to j Kumar June 2018 • Study of Geological and rock structure of the study area ��\( and suggest appropriate management measures 11 SC Dr. PC Rahul SeQtember 2017 to Kuniyal Singh Till date • Study of soil characteristics and fertility in study area and suggest f{-C-� appropriate conservation and management measures 12 HW Dr. Rahul SeQtember 2017 to Koushik Singh Till date Sadhu Quantitative Assessment of hazardous waste ·k()\,w\'1-� I(scJ'\w. likely to generate • Development of hazardous waste Management Plan 13 ISW Dr. Rahul SeQtember 2017 to Koushik Singh Till date Sadhu Quantitative -k&VY¼-�I( scJ'\w. Assessment of industrial waste likely to qenerate ENVIRONMENT CONSULTANT, Project Proponent: GREENCINDIA CONSULTING PAGE ADANI CEMENTATION LIMITED 4 PRIVATE LIMITED, NCR, (ACL), GUJRAT GHAZIABAD FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project} Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District A Kutch (Gujarat} Name s. Functiona Team Involvement No of the Signature I Areas Member (Period Task) exoert/s & Development of industrial waste Manaqement Plan Note-* For the purpose of NABET Disclosure the Period of Involvement is considered from Date of Preparation of Form-1 & PFR upto Submission Draft EIA Report to SPCB Gujarat. However, Actual Project start date is from Date of Issuance of Work Order upto date of Issuance Environment Clearance from MoEF&CC, Delhi Declaration by the Head of the Accredited Consultant Organization I, Nandini Choudhury, hereby, confirm that the above mentioned experts were involved in preparation of Lakhpat Cement Works (Integrated Project) Village Maldo, Mudhvay, Koriyani & Kapurasi, Taluka Lakhpat, District Kutch (Gujarat). I also confirm that I shall be fully accountable forany misleading information mentioned in this statement. Signature: , , ;00 Name Nandlni Choudhury, Designation : Managing Director i':� �_), --..�- -,-�{1• (/. Name of the EIA Consultant Organization Greencindia C \tUm;i.�ei �ate Limited NABET Certificate No. & Issue Date NABET/EIA/1619iifitifo58, June 28,2017 Project Proponent: Environment Consultant: PAGE Greencindia Consulting ADANI CEMENTATION LIMITED 5 (ACL), GUJRAT Private Limited Table of Contents FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project) TOC Village Maldo, Mudhvay, Koriyani &Kapurasi, Taluka Lakhpat, District Kutch (Gujarat) Table of Content 1. INTRODUCTION…………………………………………………………………………1 1.1 PURPOSE OF THE REPORT……………………………………………………………...1 1.2 IDENTIFICATION OF THE PROJECT AND PROJECT PROPONENT………………...1 1.2.1. Identification of the Project………………………………………………………….1 1.2.2. Identification of Project Proponent…………………………………………………2 1.3 BRIEF DESCRIPTION OF THE PROJECT……………………………………………….2 1.3.1. Nature and Size of the Project………………………………………………………2 1.3.2. Location of the Project………………………………………………………………..4 1.3.3. Importance of the Project to the Country/Region………………………………5 1.4 SCOPE OF THE STUDY………………………………………………………………….6 1.5 LEGISLATIVE & REGULATORY FRAMEWORK………………………………………...7 1.6 REPORT STRUCTURE …………………………………………………………………….8 2. PROJECT DESCRIPTION……………………………………………………………..2-1 2.1 BRIEF PROJECT DESCRIPTION………………………………………………………2-1 2.1.1 Type of Project……………………………………………………………………….2-1 2.1.2 Need for the Project………………………………………………………………..2-1 2.2 LOCATION OF THE PROJECT……………………………………………………….2-2 2.3 SIZE OR MAGNITUDE OF OPERATION…………………………………………….2-3 2.4 PROJECT SCHEDULE FOR APPROVAL AND IMPLEMENTATION……………….2-3 2.5 TECHNOLOGY AND PROCESS DESCRIPTION……………………………………2-4 2.5.1 Cement Plant………………………………………………………………………...2-4 2.5.2 Captive Power Plant………………………………………………………………..2-8 2.5.3 Waste Heat Recovery System…………………………………………………….2-9 2.5.4 Mudhvay Limestone Mines………………………………………………………2-10 PROJECT PROPONENT : ADANI CEMENTATION LIMITED (ACL), GUJARAT 1 ENVIRONMENT CONSULTANT : GREENCINDIA CONSULTING PRIVATE LIMITED FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT Proposed Lakhpat Cement Works (Integrated Project) TOC Village Maldo, Mudhvay, Koriyani &Kapurasi, Taluka Lakhpat, District Kutch (Gujarat) 2.5.5 WASTE HANDLING………………………………………………………………….2-12 2.5.6 BERTHING JETTY…………………………………………………………………….2-15 2.6 PROJECT DESCRIPTION……………………………………………………………2-17 2.6.1 Cement Plant with Captive Power Plant………………………………………2-17 2.6.2 Mudhvay Limestone Mines………………………………………………………2-22 2.6.3 Berthing Jetty……………………………………………………………………….2-26 2.7 DESCRIPTION OF MITIGATION MEASURES………………………………..........2-28 2.8 ASSESSMENT OF NEW & UNTESTED TECHNOLOGY FOR THE RISK OF TECHNOLOGICAL FAILURE………………………………………………………………..2-31 3. DESCRIPTION OF THE ENVIRONMENT………………………………………….....3-1 3.1 STUDY AREA & STUDY PERIOD………………………………………………......…3-1 3.2 METHODOLOGY ADOPTED FOR STUDY………………………..…………………3-1 3.2.1 Primary Data Collection……………………………………………………………3-1 3.2.2 Secondary Data Collection……………………………………………………….3-3 3.3 ECO-SENSITIVE FEATURES…………………………………………………………..3-4 3.4 VULNERABILITY OF THE SITE………………………………………………………...3-4 3.4.1 Seismicity……………………………………………………………………………..3-4

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    267 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us