Abstract of Total Capital Budget for the Year 2021-22 (Rs

Abstract of Total Capital Budget for the Year 2021-22 (Rs

Abstract of Total Capital Budget for the year 2021-22 (Rs. In lakhs) Bengaluru Tumakuru Hassana Mysuru Bagalkote Kalaburagi Total Sl. Particulars No. Budget Budget Budget Budget Budget Budget Budget Nos. Nos. Nos. Nos. Nos. Nos. Nos. A MAIN CAPITAL WORKS List-I : Commissioned 1 33 4860 26 1555.00 42 2685.00 40 2495.50 23 3052.50 26 1316.00 190 15964.00 Works 2 List-II : Ongoing Works 69 45674.89 72 20786.05 75 9430.73 56 12039.26 76 35756.45 35 26312.62 383 150000.00 * List-III : Works proposed 3 to be taken up 103 103.00 94 94.00 46 46.00 53 53.00 99 99.00 71 71.00 466 35000.00 this year(Lump sum budget) Sub-Total(List-I, II & III 205 50637.89 192 22435.05 163 12161.73 149 14587.76 198 38907.95 132 27699.62 1039 200964.00 Works) GENERAL CAPITAL B 3529.48 1509.78 2141.98 1691.63 3557.04 2570.09 15000.00 WORKS C Zonal Total(A+B) 205 54167.37 192 23944.83 163 14303.71 149 16279.39 198 42464.99 132 30269.71 1039 215964.00 D a) Civil Budget (for meeting the budgetary requirement for Civil works). * 5000.00 b) Construction of Office Complex at A.R Circle Bengaluru 4800.00 c)Construction of Multipurpose Auditorium , Amphitheatre Executive Hostel Block and Addtion Hostel Block at HRDC Hoody Bengaluru. 1500.00 E LDC / SCADA (for procurement of materials for Telecommunication Division and for meeting Expenditure for SCADA works only). * a) SCADA Phase-I&II 2264.00 b) New works 10372.00 c) GCB in respect of SCADA and Telecomunication Divisions F Transport for meeting expenditure for procurement of Vehicles. * 100.00 T&P, Computers and RT and R&D (for meeting budgetary requirment for procurement of Tools & Plants, Computers, office equipments and RT and R & D G equipments * 5000.00 H Contingency Budget : (for releasing budgetary requirement) for taking up unforeseen and urgent works/Expenses. * 5000.00 * To be decided by MD as per requirement I GRAND TOTAL (Rs.in Lakhs) ('A' to 'H') 250000.00 GENERAL CAPITAL BUDGET FOR 2021-22 Rs. In Lakhs Bengaluru Tumakuru Hassan Mysuru Bagalkot Kalaburagi TOTAL Category Particulars Budget Budget Budget Budget Budget Budget Budget 21-22 21-22 21-22 21-22 21-22 21-22 21-22 A Providing new 11kV Switch Gears 2255.11 431.13 1007.39 870.31 697.05 682.53 5943.53 Providing new EHV breakers & B 583.14 101.00 282.40 228.34 422.12 742.36 2359.36 C&R panels C Spare Transformers 62.21 60.00 80.50 23.22 114.64 61.52 402.09 D Survey & Investigation 40.00 161.33 128.00 65.00 551.77 165.91 1112.01 Land acquisition, levelling and area E 50.00 489.50 343.00 150.88 1166.26 272.51 2472.15 fencing F Protection Equipments & Metering 256.17 69.95 14.10 343.38 582.66 201.00 1467.26 Budgetary grant for procurement of G 282.85 196.87 286.59 10.50 22.53 444.26 1243.60 materials for Minor Capital Works. Total 3529.48 1509.78 2141.98 1691.63 3557.04 2570.09 15000.00 Zone Wise Abstract of List-I,II&III Works APW 2021-22 Rs inLakhs Sub-Stations Augmentations Exclusive Lines TB's & Others Total Sl. Name of the No. Zone Budget Budget Budget Budget Budget Nos. Nos. Nos. Nos. Nos. 21-22 21-22 21-22 21-22 21-22 1 Bengaluru 45 38057.00 104 4907.89 46 6251.00 10 1422.00 205 50637.89 2 Tumakuru 29 12352.00 119 5421.05 42 4462.00 2 200.00 192 22435.05 3 Hassana 37 4745.00 89 5232.00 29 1807.73 8 377.00 163 12161.73 4 Mysuru 26 9420.00 90 3114.76 30 1889.00 3 164.00 149 14587.76 5 Bagalkote 39 21016.40 110 7119.16 41 10119.99 8 652.40 198 38907.95 6 Kalaburagi 40 23821.62 64 1176.00 24 2224.00 4 478.00 132 27699.62 Total 216 109412.02 576 26970.86 212.00 26753.72 35.00 3293.40 1039 166430.00 List - I : Abstract of Commissioned works for the year 2021-22 Rs. in Lakhs Sub-Stations Augmentations Exclusive Lines TB's & Others Total Name of the Sl. No. Zone Budget Budget Budget Budget Budget Nos. Nos. Nos. Nos. Nos. 21-22 21-22 21-22 21-22 21-22 1 Bengaluru 10 3260.00 19 925.00 2 255.00 2 420.00 33 4860.00 2 Tumakuru 7 640.00 14 422.00 4 423.00 1 70.00 26 1555.00 3 Hassan 12 1483.00 21 666.00 7 297.00 2 239.00 42 2685.00 4 Mysuru 15 1854.00 21 406.50 2 121.00 2 114.00 40 2495.50 5 Bagalkot 5 634.00 12 386.00 3 1638.50 3 394.00 23 3052.50 6 Kalaburagi 5 569.00 17 492.00 3 200.00 1 55.00 26 1316.00 Total 54 8440.00 104 3297.50 21 2934.50 11 1292.00 190 15964.00 List - I List I - Commissioned Works 2021-22 (Rs. In Lakhs) Cost of Cost of Cum Exp Deptly. Sl. Work Original / Cost of Total Work up to Budget Name of the Work District Supplied Remarks No. Code Revised DWA Cost (6+7) 31/03/202 2021-22 Materials DPR 1 & others 1 2 3 4 5 6 7 8 9 10 11 BENGALURU TRANSMISSION ZONE Stations Commissioned on 11.12.2019 B. V. Halli : Budget for FY 21-22: Establishing 1x12.5MVA, DWA: SWG:43 FQV: 40L (Approved) 1 AC1056 66/11kV Sub-Station with Ramanagara 797.16 953.29 1804.29 1652.78 50.00 LC: 700 TC compenstation:10L associated line for a distance of FQV:108L Total: 50L 18.40Kms Savings due to the line passed in the Govt land, hence the LC is reduced. ITI : Station commissioned on 22.10.2019. Establishing 2x150 MVA, The balance 66 kV transformer and 66 kV line 220/66/11kV GIS substation at commissioned on 03.08.2020 ITI b)Laying of 220kV DC 1000 sq Budget for FY 21-22: mm Copper single core XLPE FQV : 19180 Lakhs. (Approved) UG cable from existing Hoody- Station: Hebbal for a route length of Supply Retension- 32L 2.607Kms. Bengaluru Civil-176L 2 AA1132 c) Running of 66kv 1000Sq mm 14429.10 19711.21 0.00 19711.21 18469.71 720.00 Urban Errection Retension-74L UG cable from 220/66/11KV Total 282L ITI GIS s/s to Existing 66/11kv NGEF s/s for a route UG Cable: length of 3.5Kms Supply Retension- 268L d) Const of 66KV Terminal Bay Civil-80L at existing 66/11KV NGEF S/S Errection Rtn.-50L for terminating of proposed PV-40L 66KV cable from proposed Total-438 220/66kv ITI GIS s/s Grand Total=720L Cost of Cost of Cum Exp Deptly. Sl. Work Original / Cost of Total Work up to Budget Name of the Work District Supplied Remarks No. Code Revised DWA Cost (6+7) 31/03/202 2021-22 Materials DPR 1 & others Brindavan alloys: a)Est 2x150 MVA, 220/66/11kV Gas Insulated Sub station at Brindavan in Bengaluru North Taluk, Bengaluru Urban District Station: Commissioned on 09.03.2020. b)Construction of 220kV D/C line for a distance of 0.67kms 10570.24 Budget for FY 21-22: from 220kV B3 - B4 D/C line to Bengaluru 3 AA1154 7710.86 PV: 300L 0.00 10970.24 10392.27 550.00 proposed 220/66/11kV Urban QV:100L Final rtn, PV & QV-550L (FQV under Brindavan Gas Insulated Sub preparation) station. Total: 550L c)Dismantling of equipments in the old 66/11kV Brindavan Substation (Exluding 11kV Switchgear) on Total Turnkey Basis. Stn-762.57 Huskuru (Chokkasandra) : FQV:-3.75 commissioned on 11.3.2020 Establishing 2x12.5MVA, PV:43.72 66/11kV Sub-Station with SWG:117L Bengaluru Cable- Budget for FY 21-22 4 AA1162 cable from existing 66/11 kV 5140.00 Statuary:18 6166.75 5959.68 200.00 Urban 4426.33 80 L for towards Statuatory clearance. Malgudi (Electronic City Sector- 0L FQV:448 120-FQV (To be approved in CPC) II, Phase-II) sub-station for a PV:192.88 Total -200L route length of 6.885 Kms Commissioned on 30.03.2019 DWA: Budget for FY 21-22: Mittemari: Establishing 8858.74 Chikkaballa LC/tree cut:300L 5 AE1026 2x100MVA, 220/66/11kV 7564.79 FQV:1416.3 49.01 12224.05 10311.14 850.00 pura FQV/PV bills:550L (FQV : to be approved in Station. 0 CPC) LC:1900 Total: 850L Samanduru : Commissioned on 28.12.2020. Establishing 2x8MVA, 66/11kV Stn:555.40( Sub-Station with associated except OH Budget for FY 21-22: line for a distance of 5.581 line short Supply-12L Kms with Running of 3coreX Bengaluru closed)) Supply Retension-120L 6 AA1129 300sqmm, 66kV Grade copper 764.24 SWG:53.42 3099.69 2505.72 590.00 Urban Cable: Civil-60L conductor UG cable from 2468.87 Statuatory charges-58 l 66/11kV Anekal sub-station for Payment toward Land compensation - 230L a route length of 8.64 kms in PV:22L UG Cable LD-110L (Under process at CEE, TZ) Anekal Taluk, Bengaluru Urban Total=590L District and TB Cost of Cost of Cum Exp Deptly.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    191 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us