Feeder Route of Bharatmala Project Route 5

Feeder Route of Bharatmala Project Route 5

PRE-FEASIBILTY REPORT (PFR) for ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) for Proposed New National highway (Feeder Route of Bharatmala Project Route 5) NH -348 B starts from Ulwe (Padeghar) connecting Jambhulpada, Kauli Belodak, Chiner, Sai , Barapada and NH-348 BB starts from Chirner connecting Koporli and terminating near Khopate Village Submitted by NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) Proposed New National highway (Feeder Route of Bharatmala Project Route 5) NH-348 B starts from Ulwe (Padeghar) 03/20/2018 connecting Jambhulpada, Kauli Belodak, Chiner, Sai , Barapada and NH-348 BB starts from Chirner connecting Koporli and terminating near Khopate Village 1. Executive Summary .............................................................................................................. 4 2. Introduction of the Project / Background information ..................................................... 7 i. Identification of Project and Project Proponent .......................................................................... 7 ii. Brief Description of nature of the Project..................................................................................... 7 iii. Need for the Project and its importance to the Country and or region ................................. 8 iv. Demand Supply Gap ................................................................................................................... 9 v. Imports vs. Indigenous production ................................................................................................ 9 vi. Export Possibility ........................................................................................................................ 9 vii. Domestic / Export Markets ........................................................................................................ 9 viii. Employment generation (Direct and Indirect) due to the project .......................................... 9 3. Project Description ............................................................................................................. 10 i. Type of project including interlinked and interdependent projects, if any. ............................ 10 ii. Location (map showing general location, specific location and project boundary and project site layout) with coordinates ................................................................................................................ 10 iii. Details of alternative sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. ........................... 10 iv. Size of magnitude of operation ................................................................................................ 10 v. Project description with process (a schematic diagram / flowchart showing the project layout, components of the project etc. should be given.) ............................................................................... 11 vi. Raw material required along with estimated quantity, likely source, marketing area of final product/s, Mode of transport of raw Material and Finished Product. ............................................ 11 vii. Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. ..................................................................................................................................... 12 viii. Availability of water its source, Energy/ power requirement and source should be given. 12 ix. Quantity of wastes to be generated (liquid and solid) and scheme for their Management/disposal. .......................................................................................................................... 12 x. Schematic representation of the feasibility drawing which give information of EIA purpose 13 4. Site Analysis ......................................................................................................................... 13 i. Connectivity ................................................................................................................................... 14 ii. Land form and land use................................................................................................................ 14 iii. Topography ............................................................................................................................... 14 iv. Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wildlife sanctuary, eco-sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given. 14 NHAI 2 Proposed New National highway (Feeder Route of Bharatmala Project Route 5) NH-348 B starts from Ulwe (Padeghar) 03/20/2018 connecting Jambhulpada, Kauli Belodak, Chiner, Sai , Barapada and NH-348 BB starts from Chirner connecting Koporli and terminating near Khopate Village v. Existing Infrastructure ................................................................................................................. 15 vi. Soil Classification ...................................................................................................................... 16 vii. Climatic data from Secondary sources ................................................................................... 17 viii. Social Infrastructure ................................................................................................................. 18 5. Planning Brief...................................................................................................................... 18 i. Planning Concept (type of industries, facilities transportation etc.) Town and Country Planning/ Development authority Classification ............................................................................... 18 ii. Population Projection ................................................................................................................... 18 iii. Land use planning (breakup along with green belt etc.) ....................................................... 18 iv. Assessment of Infrastructure Demand (Physical & Social) .................................................. 18 v. Amenities / facilities ...................................................................................................................... 18 6. Proposed infrastructure ..................................................................................................... 19 i. Industrial Area (Processing Area) ............................................................................................... 19 ii. Residential Area (Non-Processing Area) .................................................................................... 19 iii. Green Belt .................................................................................................................................. 19 iv. Social Infrastructure ................................................................................................................. 19 v. Connectivity ................................................................................................................................... 19 vi. Drinking Water Management (Source and Supply of Water) .............................................. 20 vii. Sewerage System ....................................................................................................................... 20 viii. Industrial Waste management ................................................................................................. 20 ix. Solid Waste management ......................................................................................................... 20 x. Power Requirement and Supply / Source ................................................................................... 20 7. Rehabilitation and Resettlement (R & R) Plan:............................................................... 21 i. Policy to be adopted (Central/State) in respect of the project affected persons including home oustees, land oustees and landless laborers (a brief outline to be given). ........................................ 21 8. Project Schedule & Cost Estimates ................................................................................... 21 9. Analysis of proposal (Final Recommendations) ............................................................... 21 i. Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. .................................................................................................. 21 NHAI 3 Proposed New National highway (Feeder Route of Bharatmala Project Route 5) NH-348 B starts from Ulwe (Padeghar) 03/20/2018 connecting Jambhulpada, Kauli Belodak, Chiner, Sai , Barapada and NH-348 BB starts from Chirner connecting Koporli and terminating near Khopate Village 1. Executive Summary The proposed project is a part of the Bharat Mala Project which has been envisaged as an umbrella program under the Ministry of Road Transport and Highways. The project involves constructions or improvement of national highways/ newly declared National Highways with an aim to improve road connectivity

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us