Environmental and Social Impact Assessment (Esia)

Environmental and Social Impact Assessment (Esia)

ESIA PROJECT REPORT CONTENTS Chapter Description Page 1 INTRODUCTION 1-1 1.1 General project overview 1-1 1.2 Project Location 1-2 1.3 Objective of the consultancy Services 1-4 1.4 Project Justification 1-4 1.5 Objectives of the ESIA Study 1-5 1.6 ESIA Methodology 1-5 1.6.1 Desk Study 1-5 1.6.2 Field Study 1-5 1.6.3 Data Analysis and Impact Prediction 1-7 1.6.4 Identification of mitigation measures 1-7 1.6.5 Incorporating public views into the ESIA report 1-8 1.7 Structure of the ESIA Project Report 1-9 2 POLICY, LEGAL AND REGULATORY FRAMEWORK 2-1 2.1 General Overview 2-1 2.2 Policy Frameworks 2-1 2.2.1 Environmental Policy 2-1 2.2.2 Land policy 2-4 2.2.3 Kenya’s Vision 2030 2-5 2.2.4 The National Biodiversity Strategy, 2007 2-5 2.2.5 Sustainable Development Goals (SDGs) 2-5 2.3 Legal framework 2-6 2.3.1 The Constitution of Kenya 2-6 2.3.1 Building Code, 1968 (Reprinted 1997) 2-7 2.3.2 The National Museums Act (Cap216) 2-7 2.3.3 The Environment Management and Coordination (Amended) Act, 2015 2-7 2.3.4 The Lands Act, 2012 No. 6 of 2012 2-11 2.3.5 The Water Act 2016 2-11 2.3.6 Inter-Governmental Relations Act 2012 2-12 2.3.7 The Public Health Act (Cap. 242) 2-13 2.3.8 The County Governments Act, 2012 2-13 2.3.9 Urban Areas and Cities Act, 2011 2-14 2.3.10 The Traffic Act, Cap 403 2-14 2.3.11 Physical Planning Act, 1996 2-15 2.3.12 Employment and Labour Relations Court Act. No. 20 Of 2011. Revised Edition 2014 2-15 2.3.13 Work Injury Benefits Act (WIBA) 2-16 2.3.14 The Occupational Safety and Health Act, 2007 2-16 2.4 Institutional framework 2-18 2.4.1 The Land and Environment Court Act, 2012 2-18 2.4.2 The National Environment Council 2-19 ESIA Project Report for the proposed construction of Nakuru Law Courts ii October 2.4.3 The National Environment Management Authority 2-19 2.4.4 Nakuru County Government 2-19 2.5 World Bank policy on Environmental protection 2-20 2.5.1 World Bank policy on Environmental protection OP 4.01 2-21 2.5.2 World Bank policy on Physical Cultural Resources OP 4.11 2-21 2.6 International Conventions 2-21 2.6.1 The 1985 Vienna Convention for the protection of the Ozone Layer 2-22 2.6.2 The 1987 Montreal Protocol on Substances that Deplete the Ozone Layer 2- 22 2.6.3 The United Nations Convention on Climate Change (“1992 UNFCCC”) 2-22 2.6.4 The Kyoto protocol 2-22 2.6.5 Convention on Biological Diversity 2-23 3 DESCRIPTION OF THE PROJECT ENVIRONMENT 3-1 3.1 Physical environment 3-1 3.1.1 Land Use Pattern and Neighbourhood Analysis 3-1 3.1.2 Climate 3-2 3.1.3 Seismology 3-3 3.1.4 Geology and soils 3-3 3.1.5 Topography and Drainage 3-4 3.1.6 Hydrology and drainage 3-6 3.1.7 Air Quality 3-6 3.1.8 Noise levels 3-6 3.2 Biological Environment 3-7 3.2.1 Fauna 3-7 3.2.2 Flora 3-8 3.3 Socio-Economic Environment 3-8 3.3.1 Administrative boundaries and governance 3-8 3.3.2 Population Distribution 3-8 3.3.3 Gender and inequality 3-9 3.3.4 Labour Force 3-9 3.3.5 HIV and AIDS 3-10 3.3.6 Education 3-10 3.3.7 Health profile 3-11 3.3.8 Water supply 3-11 3.3.9 Sanitation 3-12 3.3.10 Energy 3-12 3.3.11 Transport and Communication 3-12 3.3.12 Economic activities 3-13 4 PROJECT DESCRIPTION 4-1 4.1 Existing Law court 4-1 4.2 Proposed building design 4-1 4.2.1 Lower ground floor 4-1 4.2.2 Upper ground floor 4-2 4.2.3 First floor 4-2 4.2.4 Second floor 4-3 4.2.5 Third floor 4-3 4.3 General construction specifications 4-3 4.3.1 Site Clearance 4-3 4.3.2 Foundation Excavations 4-3 4.3.3 Filling Under Surface Beds in Buildings 4-3 ESIA Project Report for the proposed construction of Nakuru Law Courts iii October 4.3.4 Anti-Termite Treatment 4-4 4.3.5 Polythene Sheeting 4-4 4.3.6 Existing Services 4-4 4.4 Concrete work 4-4 4.4.1 Codes of Practice 4-4 4.4.2 Supervision 4-4 4.4.3 Cement 4-5 4.4.4 Aggregates 4-5 4.4.5 Concrete Mixes 4-5 4.4.6 Steel Reinforcement 4-5 4.4.7 Fabric Reinforcement 4-5 4.4.8 Fixing Steel Reinforcement 4-6 4.4.9 Formwork 4-6 4.5 Walling 4-6 4.5.1 Cement and lime 4-6 4.5.2 Sand 4-6 4.5.3 Stone 4-6 4.5.4 Reinforced walls 4-6 4.5.5 Wall ties 4-6 4.5.6 Fair Face 4-7 4.5.7 Pointing 4-7 4.5.8 Bricks 4-7 4.5.9 Damp-proof Course 4-7 4.6 Roofing 4-7 4.6.1 Sheet roofing generally 4-7 4.6.2 Steel Sheet and aluminium Sheet Roofing 4-7 4.7 Utilities 4-8 4.7.1 Water 4-8 4.7.2 Wastewater: 4-8 4.7.3 Solid waste; 4-8 4.7.4 Fire safety 4-8 4.7.5 Security 4-8 4.7.6 Source of Labour 4-8 5 PROJECT ALTERNATIVES 5-1 5.1 “No-action alternative” 5-1 6 PUBLIC CONSULTATION AND DISCLOSURE 6-1 6.1 General 6-1 6.1.1 Introduction 6-1 6.1.2 Objectives of the Public consultation program 6-1 6.2 Stakeholder Identification 6-1 6.2.1 Issues arising from consultations from questionnaires 6-2 7 POTENTIAL IMPACTS AND MITIGATION MEASURES 7-1 7.1 Evaluation of environmental and social impacts 7-1 7.2 Positive construction impacts 7-3 7.2.1 Employment opportunities 7-3 7.2.2 Opportunity for employment of women 7-4 7.2.3 Increase in economic activities in the area 7-5 7.2.4 Marketing of tourist destination sites in the county 7-5 ESIA Project Report for the proposed construction of Nakuru Law Courts iv October 7.2.5 Skills acquisition 7-6 7.3 Negative impacts during construction phase 7-6 7.3.1 Soil erosion and drainage 7-6 7.3.2 Occupational Safety and Health Hazards 7-7 7.3.3 Visual Impacts 7-9 7.3.4 Air Pollution 7-9 7.3.5 Water pollution 7-10 7.3.6 Noise Pollution 7-11 7.3.7 Solid waste generation and disposal 7-11 7.3.8 HIV and AIDS 7-12 7.3.9 Spread of communicable diseases 7-13 7.3.10 Labour influx 7-14 7.3.11 Resource Consumption 7-14 7.3.12 Oil Spills 7-14 7.3.13 Traffic disruption on Adjacent Roads 7-15 7.4 Positive Impacts during Operation phase 7-16 7.4.1 Improved judicial performance 7-16 7.4.2 Decongestion of the court 7-16 7.4.3 Improved infrastructure of the Court Cells 7-16 7.4.4 Improved conditions for handling the vulnerable groups in the Criminal Justice System 7-17 7.4.5 Creation of market for goods and services 7-18 7.5 Negative impacts during operation phase 7-18 7.5.1 Noise pollution 7-18 7.5.2 Additional demand for water and electricity 7-19 7.5.3 Generation of solid and hazardous wastes 7-19 7.5.4 Increased risk of fire 7-20 7.5.5 Increased surface runoff 7-20 8 ENVIRONMENTAL AND SOCIAL MANAGEMENT AND MONITORING PLAN 8-1 8.1 Environmental and Social Management and Monitoring Plan 8-1 8.2 Purpose and objectives of ESMP 8-1 8.3 Auditing of the ESMMP 8-1 8.4 Responsibilities of the ESMMP 8-2 8.4.1 Judiciary 8-2 8.4.2 National Environment Management Authority 8-2 8.4.3 Supervising consultant / Project Engineer 8-2 8.4.4 Contractor 8-3 8.4.5 Nakuru County Government 8-3 8.5 Environmental and Social Monitoring 8-1 8.5.1 Internal monitoring 8-1 8.5.2 External monitoring and evaluation 8-1 8.5.3 Monitoring during construction and operation 8-2 8.5.4 Grievance Redress Mechanism 8-2 9 CONCLUSION AND RECOMMENDATIONS 9-1 10 REFERENCES 10-1 11 APPENDICES 11-1 ESIA Project Report for the proposed construction of Nakuru Law Courts v October LIST OF TABLES Chapter Description Page Table 2-1: Health and Safety Requirements for Engineering Construction Works 2-17 Table 2-2: Safeguard Policies Triggered by the JPIP Project 2-20 Table 3-1: Rainfall distribution 3-2 Table 3-2: Population in Nakuru East and West sub-counties 3-9 Table 4-1: Volume batching for non-structural concrete mixes 4-5 Table 4-2: Volume batching for structural concrete mixes 4-5 Table 6-1: Stakeholder groups 6-2 Table 6-2: Issues raised during focus Group Discussions with various stakeholders 6-3 Table 7-1: Criteria for assessing significance 7-2 Table 7-2: Significance rating matrix 7-3 Table 7-3: Mitigation ratings 7-3 Table 7-4: Maximum permissible intrusive noise levels 7-18 Table 8-1: ESMP During Construction Phase for the development of Nakuru County Law Courts 8-1 Table 8-2: Operation ESMP for the development of Nakuru County Law Courts 8-13 ESIA Project Report for the proposed construction of Nakuru Law Courts vi October LIST OF FIGURES Chapter Description Page Figure 1-1: Location Map showing the existing Nakuru law court ......................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    125 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us