Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project sichuan Procurement Plan Public Disclosure Authorized I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018, 2nd Revision: November 27, 2018] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2018 II. Goods and Works and non-consulting services. Public Disclosure Authorized 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All Public Disclosure Authorized 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description Estimated Packages Domestic Review Comments Preference Cost by Bank (yes/no) US$ million (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of 2.2 23 No Post the Shopping (Works) Summary of 0.062 1 No Post the Shopping (Goods) Summary of the ICB (Non- Consultant Services) Summary of the NCB (Non- Consultant Services) Summary of the Shopping (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under CQS Summary of number of contracts that will be let under IS PROCUREMENT China : Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-05-13 Revised Plan Date(s): (comma delineated, leave blank if none)2019-03-30 Project ID: P133326 GPN Date: Project Name: Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project Loan / Credit No: IBRD / 85090 Executing Agency(ies):Sichuan poverty WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCZJGD07 / Zhaojue County Liuhe Township Pending four kg five villages and Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 other potato projects Quotations Envelope on rectification Village Road (hardening) 1.5 km SCZJGD08 / Zhaojue County four Kam Township, Pending Request for Single Stage - One Yi Li Mu village potato IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 Quotations Envelope production road 2 on kilometers SCZJGD14 / Zhaojue County, Liangshan County, Pending the village of slash fire Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 village, a semi fine wool Quotations Envelope on sheep project, 1.2 kilometers of new village road. SCZJGD12 / Zhaojue County four open Township Pending Request for Single Stage - One good Valley Village potato IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 Quotations Envelope project rectification Village on Road 1.08 kilometers SCJYG001 / Jinyang Yongsheng konjac farmers' Pending professional cooperatives Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementati 2018-05-20 2018-05-25 2018-06-25 2018-06-26 2018-07-06 2018-09-06 remediation village road Envelope on hardening 3 km project contract SCBTG01 / Construction of Pending office building in Luocun co- Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-27 2018-07-25 2018-11-25 operatives in Bu Tuo Quotations Envelope on County SCBTG10 / Building of co- Pending operative room of co- Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-27 2018-07-25 2018-11-25 operatives in Japanese Quotations Envelope on village in Bu Tuo County SCXYG140 / Xuyong Pending County regulation Village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-05-26 2018-06-20 2018-08-20 Road (hardening) 2 km, Quotations Envelope on New Village Road 0.27 km SCXYG143 / Xuyong Pending County regulation Village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-05-26 2018-06-20 2018-08-20 Road (hardening) 0.73 km, Quotations Envelope on New Village Road 0.73 km SCXYG145 / A new 1000 Pending mu sweet orange garden Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementati 2018-07-02 2018-07-04 2018-08-04 2018-08-04 2018-08-12 2018-12-30 drip irrigation system in Envelope on Xuyong County Page 1 SCXYG49 / Xuyong county has built 60 cubic meters Pending of water pool 3, 200 cubic Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-05-27 2018-06-20 2018-08-20 meters of pool 2, PE 1.8 40 Quotations Envelope on km 1.8 km, PE 90 90 km 4.2 km SCZJGD09 / Zhaojue County four open Township Pending good Valley Village potato Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 project rectification Village Quotations Envelope on Road (hardening) 2.5 kilometers SCZJGD10 / haojue County Liuhe Township, the Pending Request for Single Stage - One village of potato in the IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 Quotations Envelope village of Bo Luo regulation on Village Road (hardening) 0.5 km SCZJGD11 / Pending ZhaojueCounty, Damo Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 Township, Dagu Village, Quotations Envelope on Potato Project Production Road, 2.42 km SCZJGD13 / Zhaojue County, Bowling Township, Pending United Township, Liangshan Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 Semi-finishing Sheep Quotations Envelope on Project, Renovation, Village Road (hardened), 1 km SCZJGD16 / Zhaojue Pending County, Bowling Township, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 United Township, Liangshan Quotations Envelope on Semi-fine Sheep Project 4km SCZJGD17 / Zhaojue Pending County Shaolapo Township Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-02 2018-06-26 2018-09-26 Bolige Village Liangshan Quotations Envelope on Semi-fine Sheep Project 3km Pending SCBTG02 / Butuo County Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-27 2018-07-25 2018-11-25 Villages Cooperatives Offices Quotations Envelope on SCZJGD039 / Zhaojue County Liberation Township Pending Liangshan Semi-finishing Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-04 2018-06-28 2018-09-28 Sheep Project Renovation Quotations Envelope on Village Road (hardened) 1km SCBTG05 / Butuo County Pending Request for Single Stage - One Rijie Village Cooperative IBRD / 85090 Post Limited 0.00 Implementati 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope Office on SCBTG06 / Suzuo Village Pending Request for Single Stage - One Cooperative Office House in IBRD / 85090 Post Limited 0.00 Implementati 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope Butuo County on SCZJGD040 / Zhaojue County Sangang Township Pending Liangshan semi-fine wool Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementati 2018-06-04 2018-06-28 2018-09-28 sheep rectification village
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-