Public Private Partnership in Annuity Project DRAFT CONCESSION AGREEMENT VOLUME-II: SCHEDULES FOR RSHIP Package-1 : Development and Maintenance of Kanwas -Khanpur - Aklera section of SH-74, Deoli- Kanwas section of SH-74 A, Alot (MP) – Gangdhar- Suwansara (MP) section of SH-19 C and Kherli-Pahari section of SH-22 (Total length: 175.36 Km) under Design, Build, Operate/ Maintain and Transfer on Annuity Mode. Public Works Department Government of Rajasthan SCHEDULE-A (See Clause 10.1) SITE OF THE PROJECT 1 The Site 1.1 Site of the Intermediate-Lane/ Two Lane Project shall include the land, buildings, structures and road works as described in Annex-I of this Schedule-A. 1.2 An inventory of the Site including the land, buildings, structures, road works, trees and any other immovable property on, or attached to, the Site shall be prepared jointly by the Authority Representative and the Concessionaire, and such inventory shall form part of the memorandum referred to in Clause 10.3.1 of the Agreement. 1.3 Additional land required for the Project has been described in Annex-I of this Schedule-A. This land shall be acquired by the Authority, at its own cost and upon acquisition, such land shall form part of the Site and vest in the Authority. 2 Annex-I (Schedule-A) Site for Project Highway-1: Kanwas -Khanpur -Aklera section of SH-74 1. SITE The Site of the Intermediate Lane Highway-1 comprises the section of State Highway No.74 as under: Kanwas-Khanpur-Aklera section: Commencing from km 11.730 at Awan Junction (with SH 74 A), Near Kanwas to km 86.950 at Junction with NH-52, near Arnia in the State of Rajasthan having existing total length of 75.22 kms The land, carriageway and structures comprising the Site are described below. 2. LAND The Site of the Highway-1 comprises the land described in Table A-1(a) and A-1 (b) herein below. 4 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) Table A-1(a) Existing Chainage (km) Proposed S. Total existing ROW Remarks Grant of Vacant No. ROW (m) (m) Access and From To Right of way on or before 11.730 13.490 20.0 Kanwas Appointed 1 20.0 Date on or before 13.490 15.020 22.0 Appointed 2 22.0 Date Within 180 days of 15.020 15.140 27.0 Toll Plaza Appointed 3 62.0 Date Toll Plaza Within 180 days of 15.140 15.270 27.0 Appointed 4 89.0 Date Toll Plaza Within 180 days of 15.270 15.380 27.0 Appointed 5 62.0 Date on or before 15.380 16.070 30.0 Appointed 6 30.0 Date on or before 16.070 16.850 17.0 Appointed 7 17.0 Date Within 180 days of 15.0 Appointed 8 16.850 16.960 18.2 Date Within 180 days of 15.0 Appointed 9 16.960 17.130 20.0 Date 5 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) Within 180 days of 15.0 Appointed 10 17.130 17.180 18.0 Date on or before 17.180 19.010 18.0 Appointed 11 18.0 Date Within 180 days of 19.010 19.150 13.0 Appointed 12 16.10 Date on or before 19.150 23.410 20.5 Appointed 13 20.5 Date on or before 23.410 23.710 18.0 Appointed 14 18.0 Date on or before 23.710 25.120 22.0 Appointed 15 22.0 Date on or before 25.120 25.700 18.0 Appointed 16 18.0 Date on or before ROW as 25.700 26.700 12.0 Appointed available 17 12.0 Date on or before 26.700 29.140 18.0 Appointed 18 18.0 Date on or before 29.140 30.850 24.0 Appointed 19 24.0 Date on or before Panwad 30.850 31.930 23.0 Appointed Village 20 23.0 Date on or before Panwad 31.930 32.610 18.0 Appointed Village 21 18.0 Date 6 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) on or before Panwad 32.610 33.160 22.0 Appointed Village 22 22.0 Date on or before 33.160 34.370 20.0 Appointed 23 20.0 Date on or before 34.370 35.830 24.0 Appointed 24 24.0 Date on or before Dahikheda 35.830 37.030 17.0 Appointed Village 25 17.0 Date on or before 37.030 42.710 26.0 Appointed 26 26.0 Date on or before 42.710 44.550 24.0 Appointed 27 24.0 Date Within 180 Khanpur days of 44.550 49.450 0.0 Bypass Appointed 28 30.0 Date on or before 49.450 55.280 25.0 Appointed 29 25.0 Date on or before 55.280 61.410 27.0 Appointed 30 27.0 Date on or before Sarola Kalan 61.410 62.720 15.0 Appointed Village 31 15.0 Date on or before 62.720 64.400 35.0 Appointed 32 35.0 Date Within 180 days of 64.400 64.730 36.0 Appointed 33 44.3 Date 7 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) on or before 64.730 65.160 27.0 Appointed 34 27.0 Date Toll Plaza Within 180 days of 65.160 65.250 37.0 Appointed 35 69.3 Date Toll Plaza Within 180 days of 65.250 65.420 37.0 Appointed 36 90.5 Date Within 180 days of 65.420 65.470 37.0 Toll Plaza Appointed 37 69.3 Date on or before 65.470 65.840 25.0 Appointed 38 25.0 Date on or before 65.840 68.860 22.0 Appointed 39 22.0 Date Within 180 days of 68.860 69.060 18.0 Appointed 40 18.6 Date Within 180 days of 69.060 69.290 18.0 Appointed 41 22.5 Date on or before 69.290 69.490 20.0 Appointed 42 20.0 Date Within 180 days of 69.490 69.550 16.0 Appointed 43 16.8 Date Within 180 days of 69.550 69.630 13.0 Appointed 44 17.4 Date 8 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) Within 180 days of 69.630 69.670 13.0 Appointed 45 13.8 Date on or before 69.670 73.280 21.0 Appointed 46 21.0 Date on or before 73.280 73.680 19.0 Appointed 47 19.0 Date on or before 73.680 74.480 15.0 Taraj Village Appointed 48 15.0 Date on or before 74.480 76.550 22.0 Appointed 49 22.0 Date on or before 76.550 77.430 20.0 Appointed 50 20.0 Date Within 180 days of 77.430 77.800 22.0 Appointed 51 26.5 Date on or before 77.800 78.660 22.0 Appointed 52 22.0 Date on or before 78.660 85.940 23.0 Appointed 53 23.0 Date on or before 85.940 86.950 25.5 Appointed 54 25.5 Date Table A-1 (b) Existing Chainage (km) Remarks S. No. Proposed ROW(m) From To 9 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) Khanpur Bypass to 1 44.530 49.380 30 be acquired 3. CARRIAGEWAY 3.1 Carriageway The present width of main carriageway and shoulders of the Highway-1 are given in Table A-2. Table A-2 Width of main carriageway Existing Chainage Width of S. Type of Width of (km) Length (km) Shoulders No. Carriageway Carriageway From To (m) 1 11.730 13.590 1.860 CC, BT, K Two Lane 0.2 to1.2 Less than Single 2 13.590 14.820 1.230 BT 0.2 to 1.0 Lane 3 14.820 15.920 1.100 BT Single Lane 0.5 to 1.0 Intermediate 4 15.920 17.120 1.200 BT 1.0 to1.2 Lane Less than Single 5 17.120 23.190 6.070 BT 1.0 to1.2 Lane 6 23.190 23.750 0.560 BT,CC Two Lane 0.6 to 1.2 7 23.750 26.405 2.655 BT Single Lane 0.8 to 1.2 8 26.405 30.480 4.075 BT Single Lane 0.8 to 1.2 9 30.480 31.450 0.970 Rigid Two- Lane 0.4 to 0.8 Less than Single 10 31.450 33.120 1.670 BT 0.8 to 1.0 Lane 11 33.120 35.620 2.500 BT Single Lane 0.6 to 0.8 Intermediate 12 35.780 37.050 1.270 Rigid ,K 0.6 to 0.8 Lane 13 37.050 40.580 3.530 BT Single Lane 0.8 to 1.2 Intermediate 14 40.580 41.180 0.600 BT, Rigid 0.4 to 0.8 Lane 15 41.180 44.530 3.350 BT Single Lane 1.0 to 1.2 Intermediate 16 49.380 61.720 12.340 BT 0.6 to 1.2 Lane Intermediate 17 61.720 62.570 0.850 BT, Rigid, K - Lane 10 Schedule-A Highway-1: Kanwas- Khanpur-Aklera (SH-74) Less than Single 18 62.570 73.720 11.150 BT 0.8 to 1.0 Lane Intermediate 19 73.720 74.570 0.850 BT, Rigid 0.5 to 1.0 Lane Less than Single 20 74.570 77.020 2.450 BT 0.5 to 1.0 Lane 21 77.020 79.020 2.000 BT Single Lane 0.5 to 0.8 Less than Single 22 79.020 86.950 7.930 BT 0.8 to 1.2 Lane BT=Bituminous Pavement, CC= Cement Concrete Pavement, K= Kharanja (Stone Pavement) 3.2 Carriageway of Service Road The present width of carriageway of the service road is given in Table A-3.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages412 Page
-
File Size-