Asphalt, Fabric, & Engineering Inc. (AFEI) Constructed Synthetic Turf Fields Project Name SCOPE SQ.FT. Turf System Installed Completed Date City of Chula Vista Maintenance TurfRenu 3/16/17 276 4th Avnue Chula Vista, CA 91910 Simi Youth Baseball Repairs Various Repair Work 789 Irvine Road, Simi Valley, CA Yoshko Prebanda Install 336 Installation - Various 11/8/16 627 Avry Place Long Beach, CA 90807 Rossmoyne Property Management Install 2,429 Marquee Pro Natural 3/23/17 1300 North Verdugo Rd. Glendale, CA 91208 Picareli Resdence Remove and Install 208 Marquee Pro Natural 3/30/17 6470 E. El Jardin, Long Beach, CA Landscape Development InC Avalon Repair Install 855 Syntipede 354 4/28/17 7300 Santa Monica Blvd. Hollywood, CA 90040 Nelson Academy School Rip/Redo 65,000 3D3 52 TBD 1951 Cherry Ave., Signal Hill Whitsett Park-Field #4 Turf Installation 75,000 Rec & Park SpeC TBD 6900 Whitsett St., No Hollywood 91606 Paloma Rip/Redo 86,500 3D3 60 8/28/20 Norwalk High School Turf Installation 80,000 3D3 60 6/8/20 11356 Leffingwell Norwalk, CA 90650 Norwalk High School Turf Installation 146,526 3D3 60 6/29/20 11356 Leffingwell Norwalk, CA 90651 Norwalk High School Turf Installation 116,511 3D3 61 8/17/20 11356 Leffingwell Norwalk, CA 90652 Norwalk High School Turf Installation 43,486 3D3 62 8/17/20 11356 Leffingwell Norwalk, CA 90653 St. Paul Turf Installation 76,000 3D3 60 7/31/20 Elsyian (Controlled Products) Turf Installation 30,000 Controlled Products 7/30/20 Santa Ynez Rip/Redo 86,000 3D3 60 7/12/20 Tesoro High School Turf Installation 76,000 3D3 60 7/13/20 Rancho Verde High School Turf Installation 31,000 3D3 52 6/18/20 17750 Lasselle Street. Moreno Valley, CA 92511 Rancho Verde High School Turf Installation 35,000 Turf Installation 6/18/20 17750 Lasselle Street. Moreno Valley, CA 92511 Albert the Great 804 E. Compton Blvd. Full Site Construction 25,000 3D3 52 5/20/20 Rancho Dominguez, CA 90220 University of California, Riverside II Rip/Redo 88,000 La Liga 52 oz. Spring 2020 900 University Ave, Riverside, CA 92521 Asphalt, Fabric, Engineering Inc. (AFEI) Page 1 of 7 Synthetic Turf Field Installations Project Name SCOPE SQ.FT. Turf System Installed Completed Date Montebello Turf Repair 9,000 Turf Repair Spring 2020 Whitsett Park-Phase 2 Turf Installation 153,394 3D3 60 Winter 2020 6900 Whitsett St., No Hollywood 91606 First Lutheran Church Turf Installation 10,500 Rhino 42 Winter 2020 St. Francis High School Turf Installation 87,000 3D3 60 5/1/20 Chadwick School Turf Installation 25,000 OPS BB Elysian Park-LA Parks & Recreation Turf Installation 30,000 Turf Installation San Diego State University Full Site Construction 100,000 Controlled Products-95 oz. Summer 2019 5500 Companile Dr., San Diego Tahquitz High School Rip/Redo 78,000 3D3 52 Summer 2019 4425 Titan Trail Hemet, CA 92545 Idyllwild Middle School Rip/Redo 44,000 3D3 52 Summer 2019 26700 Highway 243 Idyllwild, CA 92549 AB Miller High School Rip/Redo 95,000 3D3 52 Summer 2019 6821 Oleander Ave. Fontana,CA 92336 Jurupa Hills High School Rip/Redo 75,000 3D3 52 Summer 2019 10700 Oleander Ave. Fontana, CA 92336 Albion Park Turf Installation 70,000 DT32 Spring 2019 1739 Albion ST., Los Angeles, CA 90031 Norwalk - La Habra USD John Glenn High School Turf Installation 400,000 Astro 3D3 Spring 2019 13520 Shoemaker Ave. Norwalk, CA 90650 University of California, Riverside Turf Installation 88,000 La Liga 52 oz. Spring 2019 900 University Ave, Riverside, CA 92521 Salvation Army Red Shield Center- LA Galaxy Foundation 1532 W 11th St, Los Rip/Redo 30,000 3D3 Spring 2019 Angeles, CA 90015 E. Wilmington Greenbelt Park Turf Installation 65,000 DT Spring 2019 1300 E O St, Wilmington, CA 90744 Playa Vista Park Rip/Redo 24,000 DT Spring 2019 13196 Bluff Creek Dr, Los Angeles, CA 90094 San Bernardino USD San Bernardino High School Full Site Construction 83,000 3D3 52 Spring 2019 1850 N E St, San Bernardino, CA 92405 San Bernardino USD Cajon High School Full Site Construction 77,000 3D3 52 Spring 2019 1200 W Hill Dr, San Bernardino, CA 92407 San Bernardino USD Arroyo Valley High School Full Site Construction 80,000 3D3 52 Summer 2019 1881 W Base Line St, San Bernardino, CA 92411 San Bernardino USD Indian Springs High School Full Site Construction 81,000 3D3 52 Summer 2019 650 N Del Rosa Dr, San Bernardino, CA 92410 San Bernardino USD Pacific High School Full Site Construction 85,000 3D3 52 Summer 2019 1020 Pacific St, San Bernardino, CA 92404 El Sol Academy Rip/Redo 8,000 Diamond Spring Pro Spring 2019 1010 N Broadway, Santa Ana, CA 92701 Asphalt, Fabric, Engineering Inc. (AFEI) Page 2 of 7 Synthetic Turf Field Installations Project Name SCOPE SQ.FT. Turf System Installed Completed Date Jefferson Academy Full Site Construction 50,000 3D52 Pending 750 Euclid Ave., Long Beach, CA 90804 Mira Costa High School Main Stadium Rip/Redo 76,000 3D360 Summer 2018 1401 Artesia Blvd., Manhattan Beach, CA 90266 Markham Middle School Turf Installation 135,000 DT32 Spring 2018 1650 East 104th St., Los Angeles, CA 90002 San Bernardino USD San Gorgonio High School Rip/Redo 90,000 3D360 Summer 2018 2299 Pacific St., San Bernardino, CA 92404 Stephens Middle School Full Site Construction 68,000 3D52 Summer 2018 1830 W. Columbia St., Long Beach, CA 90810 Dana Hills High School Full Site Construction 77,000 3D360 Summer 2018 33333 Golden Lantern, Dana Point, CA 92629 Balfour Beatty Will Rogers MS Will Rogers Middle School Full Site Construction 66,000 Astro 3D3 Summer 2018 365 Monrovia Ave. Lon Beach, CA 90803 St. Francis High School Glendale Sports Complex Full Site Construction 120,000 Diamond Series Spring 2018 200 Foothill Blvd. La Canada, Flintridge CA 91011 LA Rec & Park Sylmar Sylmar Park Recreation Center Full Site Construction 60,000 DT32 12/1/18 13109 Borden Ave. Sylmar, CA LA Rec & Park North Hills North Hills Community Park Full Site Construction 90,000 DT32 Summer 2018 8756 N. Parthenia Place North Hills, CA 91343 LA Rec & Park Van Nuys Van Nuys Recreation Center Full Site Construction 68,000 DT32 Summer 2018 14301 VanOwen Street Los Angeles, CA 91405 LA Rec & Park Slauson Recreation Center Full Site Construction 68,000 DT32 Summer 2018 5306 South Compton Ave. Los Angeles, CA 90011 LAPD Devonshire Full Site Construction TigerTurf Spring 2018 8721 Wilbur Ave. Northridge, CA LA Rec & Park Delano Park Remove and Replace 60,000 Controlled Products 3/1/18 15100 Erwin St. Van Nuys, CA 91411 UCLA Mec, Inc. Jackie Robinson Field Turf Installation DT32 Fall 2017 100 Constitution Ave. Los Angeles, CA Don Bosco Technical Institute Don Bosco Football Field Remove and Replace 80,000 3D360 1/1/18 1151 San Gabriel Blvd. Los Angeles, CA91770 Bomel Construction Co Lucas Museum Soccer Field Turf Installation 100,000 DT32 1/1/18 Vermont & Martin Luther King Los Angeles, CA 90037 Bright View (USC) Turf Installation DT32 835 W. Jefferson Los Angeles, CA LA RAP Washington Irving M.S. Washington Irving Middle School Full Site Construction 60,000 DT32 Summer 2018 3010 Estrada Ave. Los Angeles, CA 90065 LA Galaxy Foundation 109th Street Turf Install 6,000 DT32 12/1/18 1464 E. 109th St. Los Angeles, CA 90059 South Pasadena USD South Pasadena Middle School Full Site Construction Field Turf TBD 1500 Fair Oaks Ave. S. Pasadena, CA Corona Norco USD Roosevelt HS Track Installation Track Installation 7447 Scholar Way Eastvale, CA 92880 Edgewood High School Track and Field 95,000 KYA TBD 1301 Trojan West Covina, CA 91790 Asphalt, Fabric, Engineering Inc. (AFEI) Page 3 of 7 Synthetic Turf Field Installations Project Name SCOPE SQ.FT. Turf System Installed Completed Date Val Verde Unified School District Install 109,700 3D3 Fall 2017 975 West Morgan St. Perris, CA 92571 Palisades Charter High School Track and Field Surfacing 94,000 Astro DT-32 Fall 2017 15777 Bowdoin St. Pacific Palisades, CA 90272 Beverly Hills Unified School District Turf Replacement 114,000 Astro 3D3 8/1/18 241 S. Moreno Dr. Beverly Hills, CA 90212 Bellflower USD Bellflower High School Full Site Construction Field Turf Fall 2017 15301 McNab Ave. Bellflower, CA Jserra Catholic High School 26351 Junipero Serra Rd. San Juan Capistrano, CA Football Field 12,000 Astro3D3 TBD 92675 The Accelerated School Replace and Remove 12,000 DT32 4/24/17 4000 South Main Street., Los Angeles, CA 90037 Capistrano Unified School District San Clemente High School Turf 80,000 Astro 3D3 7/12/17 700 Avenida Pico, San Clemente,CA 92673 MBX Foundation Inc, Mira Costa High School Install 155,000 DT32 TBD 1401 Artesia Blvd. Manhattan Beach, CA 90266 Browning High School Full Site Construction Various Work 7/15/17 3318 E. Hill St. Signal Hill, CA 90755 Pilgram School High School 540 Commonwealth, Los Angeles, CA 90020 Install 49,000 DT32 TBD Filmore High School Remove and Replace 75,000 XPE42 TBD 555 Central Avenue Fillmore, CA 93015 Baldwin Park Usd Sierra Vista Replacement 100,000 3D3 7/14/17 3600 N. Frazier St. Baldwin Park 91706 Baldwin Park USD , Balwin Park H.S. Install 155,000 DT32/3D3 TBD 3900 Puente Avenue, Baldwin Park 91706 Upland High School Install Replace 75,000 3DM TBD 565 W. 11th St Upland, CA 91706 Wildwood School Remove and Replace 9,000 DT32 TBD 12201 Washingon Place, CA 90066 Mariners Christian School Full Site Construction 61,000 AstroTurf DT-32 1/1/17 3000 Fischer Avenue Costa Mesa, CA 92626 CSULB- Long Beach State ( Blair Field) Base and Install 12,000 AstroTurf DT-32 &3D3 1/1/17 4700 Deukmejian Drive Long Beach, CA Stub Hub Remove and Replace 101,000 AstroTurf DT32 2/1/17 18400 Avalon Blvd.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-