Reference List / Glas Trösch Ag Rail

Reference List / Glas Trösch Ag Rail

20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery TSI Rolling Stock Front windscreen with film Stadler Rail KISS NORDIC -- 520 km/h Sweden EUROPA 2017 Norm: heating system EN 15152 AB Transitio Regional Train Front windscreen with film Skoda Several EUROPA MSV Norm: UIC 651 440 km/h Czech Republic 1996 heating system Czech Railways Regional Train EBA Front windscreen with Bombardier 763 until 767 EUROPA DO 2010 DB Norm: 410 km/h Germany 2012 wire heating system EN 15152 Regional Train EBA Front windscreen with film Stadler Rail Several EUROPA Flirt 3 DB Norm: 410 km/h Germany 2013 heating system EN 15152 Regional Train EBA Front windscreen with film Stadler Rail -- EUROPA Flirt 3 PKP Intercity Norm: 410 km/h Poland 2013 heating system EN 15152 Regional Train TSI Rolling Stock Front windscreen with film Stadler Rail Flirt 3 Dutch Railways -- 410 km/h Netherlands EUROPA 2015 Norm: heating system EN 15152 Regional Train page 1 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery EBA KISS Front windscreen with film Stadler Rail WESTbahn -- Norm: 410 km/h Austria EUROPA 2011 (Dosto RV) heating system EN 15152 Regional Train EBA KISS Front windscreen with film Stadler Rail -- Norm: 410 km/h Austria EUROPA 2016 (Dosto RV) heating system and frame WESTbahn EN 15152 II Regional Train EBA Front windscreen with film Stadler Rail -- EUROPA KISS CFL Norm: 410 km/h Luxemburg 2012 heating system EN 15152 Regional Train EBA Front windscreen with film ALSTOM 1440 EUROPA XCCS5/S8 DB Norm: 410 km/h Germany 2013 heating system EN 15152 Regional Train TSI Rolling Stock Front windscreen with SIEMENS Desiro HC RRX 410 km/h Germany EUROPA 2016 Norm: wire heating system Rhein Ruhr EN 15152 Express Regional Train TSI Rolling Stock Front windscreen with film Stadler Rail Flirt 3.1 -- 400 km/h Switzerland EUROPA 2017 Norm: heating system Swiss South EN 15152 Eastern Railway Regional Train page 2 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery CIVITY TSI TRANSPENNINE Rolling Stock United Front windscreen with film CAF -- 400 km/h EUROPA 2017 EMU Norm: Kingdom heating system PASSENGERS EN 15152 Trannspennine Regional Train Coradia Front windscreen with film ALSTOM DB 440 Norm: UIC 651 400 km/h Germany EUROPA 2007 Continental heating system Regional Train TSI Rolling Stock United Front windscreen with film Stadler Rail Flirt UK -- 400 Km/h EUROPA 2017 Norm: Kingdom heating system AbelioAbellio EN 15152 Rail NRW Regional Train TSI CT LOC&PAS Front windscreen with SIEMENS DESIRO ML ÖBB -- 390 Km/h Austria EUROPA 2014 Norm: wire heating system EN 15152 Regional Train TSI HS RST Front windscreen with Bombardier SLT Light Train Dutch Railways 2400 Norm: 380 km/h Netherlands EUROPA 2006 wire heating system and EN 15152 frame Regional Train Saudi Railways Front windscreen with CAF SAUDI ARABIA II -- Norm: UIC 651 380 km/h Saudi Arabia ASIA 2014 Organisation wire heating system Regional Train page 3 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery Front windscreen with film ALSTOM Several EUROPA X60 Norm: UIC 651 380 km/h Sweden 2014 heating system SL stockholm Regional Train Front windscreen with film ALSTOM Several EUROPA X61 Several Norm: UIC 651 380 km/h Several 2008 heating system Regional Train Norm: BR 566 Front windscreen with Bombardier Vlocity -- 380 km/h Australia OCEANIA 2019 wire heating system and type 3 frame Ballarat V/Line rail service Regional Train Norm: BR 566 Front windscreen with Bombardier -- Queensland Rail -- 380 km/h Australia OCEANIA 2015 wire heating system and type 3 frame Regional Train EBA Front windscreen with SIEMENS DESIRO ML Several 376 Km/h Belgium EUROPA 2009 Norm: UIC 651 wire heating system SNCB Regional Train Trans regio DB-Baureihe EBA Front windscreen with SIEMENS DESIRO ML 376 Km/h Germany EUROPA 2007 Deutsche 460 Norm: UIC 651 wire heating system Regionalbahn GmbH Regional Train page 4 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery TSI CIVITY Rolling Stock United Front windscreen with film CAF -- 360 km/h EUROPA 2017 TRANSPENNINE Norm: Kingdom heating system EN 15152 Trannspennine Regional Train EBA Front windscreen with film Stadler Rail -- EUROPA DOSTO RV SBB Norm: 360 km/h Switzerland 2010 heating system EN 15152 Regional Train Norm: Front windscreen with film -- -- Trenitalia 801 - 940 360 km/h Italy EUROPA 2012 308474 esp.7 heating system Regional Train Norm: Front windscreen with film -- -- Trenitalia UIC-X 360 km/h Italy EUROPA 2012 308474 esp.7 heating system Regional Train Norm: Front windscreen with film Ansaldo Breda -- Trenitalia T45 360 km/h Italy EUROPA 2013 308474 esp.7 heating system and frame Regional Train Norm: Front windscreen with film -- -- Trenitalia E582 360 km/h Italy EUROPA 2013 308474 esp.7 heating system Regional Train page 5 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery Norm: Front windscreen with film -- -- Trenitalia ALN 663 360 km/h Italy EUROPA 2013 308474 esp.7 heating system Regional Train Norm: Front windscreen with film -- -- Trenitalia ALN 668 360 km/h Italy EUROPA 2013 308474 esp.7 heating system Regional Train Norm: Front windscreen with film -- -- Trenitalia ALE 642 360 km/h Italy EUROPA 2013 308474 esp.7 heating system Regional Train Norm: Front windscreen with film -- -- Trenitalia Z1 360 km/h Italy EUROPA 2014 308474 esp.7 heating system and frame Regional Train Norm: Front windscreen with film ALSTOM Minuetto Trenitalia ALE 501 360 km/h Italy EUROPA 2012 308474 esp.7 heating system and frame Regional Train Front windscreen with film Stadler Rail 522 EUROPA Flirt SBB Norm: UIC 651 360 km/h Switzerland 2009 heating system Regional Train page 6 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery Eurobahn EBA Front windscreen with film Stadler Rail Flirt VT 2.0X 360 km/h Germany EUROPA 2008 Germany Norm: UIC 651 heating system Regional Train Berchtesgadener EBA Front windscreen with film Stadler Rail Flirt ET 13X 360 km/h Germany EUROPA 2008 Land Bahn Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt DB Several 360 km/h Germany EUROPA 2008 Norm: UIC 651 heating system Regional Train Ferrovie del EBA Front windscreen with film Stadler Rail Flirt ETR 330 360 km/h Italy EUROPA 2008 Gargano Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt Ferrotramviaria -- 360 km/h Italy EUROPA 2008 Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt MÁV Several 360 km/h Hungary EUROPA 2008 Norm: UIC 651 heating system Regional Train page 7 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery Norwegian State EBA Front windscreen with film Stadler Rail Flirt NSB -- 360 km/h Norway EUROPA 2010 Railways Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt Mazovia, Poland Several 360 km/h Poland EUROPA 2008 Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt SBB Several 360 km/h Switzerland EUROPA 2008 Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt SNTF 110 - 111 360 km/h Algeria AFRICA 2008 Norm: UIC 651 heating system Regional Train EBA Front windscreen with film Stadler Rail Flirt LEO Express -- 360 km/h Czech Republic EUROPA 2008 Norm: UIC 651 heating system Regional Train Front windscreen with film Stadler Rail Several EUROPA Flirt Elron Norm: UIC 651 360 km/h Estonia 2012 heating system Regional Train page 8 of 18 20.05.2019/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us