Appendix 6A – Site-Wide Water Balance

Appendix 6A – Site-Wide Water Balance

Frieda River Limited Sepik Development Project Environmental Impact Statement Appendix 6a – Site-wide Water Balance SDP-6-G-00-01-T-003-015 Frieda River Project Site-wide Water Balance Report Prepared for Frieda River Limited Report Prepared by SRK Consulting (Australasia) Pty Ltd PNA009 August 2018 SDP-6-G-00-01-T-003-015 SRK Consulting Page ii Frieda River Project Site-wide Water Balance Frieda River Limited PO Box 2297, Fortitude Valley Business Centre Brisbane QLD 4006 SRK Consulting (Australasia) Pty Ltd Level 1, 10 Richardson Street West Perth WA 6005 e-mail: [email protected] website: asia-pacific.srk.com Tel: +61 8 9288 2000 Fax: +61 8 9288 2001 SRK Project Number PNA009 August 2018 Compiled by Peer Reviewed by Brian Luinstra John Chapman Principal Hydrogeologist Principal Consultant Email: [email protected] Author: Brian Luinstra. LUIN/CHAP/edwa PNA009_FRHEP - Water Balance_Rev3 24 August 2018 SRK Consulting Page iii Table of Contents Disclaimer .................................................................................................................................................... vi List of Abbreviations ................................................................................................................................... vii 1 Introduction and Scope of Report ............................................................................... 1 1.1 Study objectives .................................................................................................................................. 1 1.2 Statement of SRK independence ........................................................................................................ 1 2 Site Summary ............................................................................................................... 2 2.1 Location ............................................................................................................................................... 2 2.2 Meteorology ........................................................................................................................................ 5 2.2.1 Climate setting ......................................................................................................................... 5 2.2.2 Precipitation ............................................................................................................................. 6 2.2.3 Automatic weather station data ............................................................................................. 10 2.3 Hydrology .......................................................................................................................................... 11 2.4 Climate change ................................................................................................................................. 15 3 Water Balance Model Components, Inputs and Operational Logic ....................... 16 3.1 Stochastic precipitation generation ................................................................................................... 16 3.2 Evaporation and evapotranspiration ................................................................................................. 18 3.3 Catchment modelling ........................................................................................................................ 18 3.4 Open-pit development ....................................................................................................................... 20 3.5 Groundwater inflow to open-pits ....................................................................................................... 20 3.6 Water treatment ................................................................................................................................ 21 3.7 ISF ..................................................................................................................................................... 21 4 Water Balance Modelling Results ............................................................................. 23 4.1 Introduction ....................................................................................................................................... 23 4.2 Base Case: pre-embankment flows .................................................................................................. 23 4.2.1 Assessment point flows ......................................................................................................... 23 4.3 Base Case: post-embankment flows ................................................................................................ 24 4.3.1 Post-embankment flow – operational period (Model Years 0–35; FRGCP Operational Years -2 to 33) ....................................................................................................................... 24 4.3.2 Mine water management ....................................................................................................... 28 4.4 Closure period (Model Year 37-56, FRGCP Year 34–54) ................................................................ 30 4.4.1 Pit inundation ......................................................................................................................... 30 4.4.2 Closure Scenario 1: ongoing hydropower ............................................................................ 31 4.4.3 Closure Scenario 2: no hydropower ..................................................................................... 32 4.4.4 Closure Scenario 3: maintained environmental flows .......................................................... 33 5 Conclusions and Limitations .................................................................................... 35 6 References .................................................................................................................. 37 LUIN/CHAP/edwa PNA009_FRHEP - Water Balance_Rev3 24 August 2018 SRK Consulting Page iv List of Tables Table 2-1: Details of assessment point locations .......................................................................................... 5 Table 2-2: Mean annual precipitation values ................................................................................................ 7 Table 2-3: Mean monthly precipitation values for upland sites (values in mm) ............................................ 8 Table 2-4: Mean monthly precipitation values for lowland sites (values in mm) ........................................... 8 Table 2-5: Average 24 hour storm precipitation levels .................................................................................. 9 Table 2-6: Modelled PMP levels for ISF and HITEK open-pit areas ............................................................. 9 Table 2-7: Monthly average humidity (values in %) .................................................................................... 10 Table 2-8: Monthly average solar radiation (values in W/m2) ..................................................................... 10 Table 2-9: Monthly average temperature (values in degrees Celsius) ....................................................... 10 Table 2-10: Monthly average wind speed (values in m/s) ............................................................................. 10 Table 2-11: Modelled evapotranspiration and pan evaporation (mine area) ................................................ 11 Table 2-12: Mean monthly flows in Nena, Frieda and Sepik Rivers (ML/day) .............................................. 12 Table 2-13: Flows in Nena, Frieda and Sepik rivers ..................................................................................... 13 Table 2-14: Overall climate change trends ................................................................................................... 15 Table 3-1: Annual precipitation at the Lower Nena and Lower Frieda stations and from stochastic data ............................................................................................................................................ 17 Table 3-2: Parameters used in AWBM ........................................................................................................ 19 Table 3-3: Calibrated flows for AP6............................................................................................................. 19 Table 3-4: Surface areas used in open-pit contact water catchment runoff modelling ............................... 20 Table 3-5: Average daily groundwater inflow rates ..................................................................................... 21 Table 4-1: Average modelled pre-embankment daily flow at each assessment point ................................ 24 Table 4-2: Average modelled post-embankment daily flow at each assessment point for the operational period (FRGCP Years 1–33 inclusive) .................................................................... 25 Table 4-3: Average modelled post-embankment daily flow at each assessment point for the closure period with Hydroelectric power operations maintained (FRGCP years 34–54) .......... 32 Table 4-4: Average modelled post-embankment daily flow at each assessment point for the closure period with hydroelectric power terminated and all flow through the closure spillway (FRGCP years 36–56 inclusive) ................................................................................... 33 Table 4-5: Average modelled post-embankment daily flow at each assessment point for the closure period with

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    57 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us