73Rd OCC Meeting Minutes

73Rd OCC Meeting Minutes

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/504 Jabalpur, dated:13.03.2020 To As per distribution list Sub: Minutes of 73rd meeting of Operation and Coordination Committee of MP. … The Minutes of 73rd meeting of the Operation and Coordination Committee of MP held on 13th January 2020 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected]. 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected], 26. The General Manager Operation Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] , [email protected] . 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] MINUTES FOR 73RD MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 13TH JANUARY 2020 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL, NAYAGAON, JABALPUR. The 73nd meeting of Operation & Coordination Committee of MP was held on 13th January 2020 at 11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0. Shri K.K.Parbhakar, C.E.(SLDC) & Chairman OCC welcomed all the guests & participants to 73rd OCCM of MP. Chairman OCC stated that in the ongoing rabi season, whenever the demand was in increasing trend there was rain particularly in East & Central regions of MP, resulting a decline in MP demand. The demand of East Discom has decreased significantly due to low agriculture load and it is also suspected that the base load of East Discom has also decreased, as the energy/day is comparatively less by 200-250LU compared to previous year rabi season energy/day. Further he informed the committee that the demand of Central Discom is same as per the previous year demand and the demand of West Discom has increased in comparison to previous year demand. The main concern is the significant decrease in base load demand of East Discom and is required to be examined, accordingly East Discom has been requested to provide the detailed report for same. He also stated that there is no issue from availability side as during the on-going rabi season MPPMCL, MPPGCL, NHDC & SSP has supported by ensuring enough availability of generation. Due to expansion of transmission network of PGCIL the overloading problem of some of the major pockets have been addressed. Representative from West Discom stated that the real time Discom Drawl shown in Scada are not always accurate and required to be corrected. Shri R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM informed the committee that the real time data regarding demand is for monitoring purpose only and cannot be used for commercial purpose , as it is very difficult to achieve 100% accurate real time data all the time due to technical difficulties . He also stated that for forecasting/day ahead scheduling purpose DPR can be used and revisions in demand can also be done in real time in every 4th time block. Thereafter, Chairman OCC stated that, the RE Generations in some of the regions are also not telemetered which creates a difference in real time demand viz-a-viz actual demand. The the maximum availability of SCADA system is in the range of 95% to 96%, when the most reliable communication media i.e, the Optical Fiber & best quality meters is being used and 100% accuracy & availability of such complicated SCADA system cannot be ensured. He also stated that the Actual Discom Drawl is calculated with Dicom drawl point data i.e., the telemetered data which is checked weekly and verified/crosschecked with the field continuously so as to avoid any discrepancy in Discom Drawl. Thereafter the agenda points were taken up, which are narrated here under: - ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 72nd meeting of Operation & Coordination Committee of MP held on 19th November 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/30 Jabalpur dated 06.01.2020. No comments have been received. Committee confirms the minutes. Minutes of 73rd OCCM of MP 1 ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS OCTOBER 2019 TO NOVEMBER 2019. 2.1. Frequency Particulars: The committee was apprised that during OCTOBER 2019 the system frequency was below 49.90 Hz for 3.19% of time against 4.57% of time during NOVEMBER 2019. The system frequency was above 50.05 Hz for 19.77% of time during OCTOBER 2019 against 20.18 % of time during NOVEMBER 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 77.05 % of the time during OCTOBER 2019 against 75.25 % of time during NOVEMBER 2019. The average monthly frequency was 50.00 Hz during month of OCTOBER 2019 and 50.01 Hz during month of NOVEMBER 2019. The detailed frequency particulars for the month of OCTOBER 2019 and NOVEMBER 2019 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Minimum Maximum Instantaneous Instantaneous Average Integrated integrated Month Minimum Maximum frequency frequency over frequency over an Frequency Frequency an hour hour OCTOBER 50.01 Hz 49.88 Hz 50.12 Hz 49.67 Hz 50.31 Hz 2019 NOVEMBER 50.01 Hz 49.85 Hz 50.10 Hz 49.65 Hz 50.27 Hz 2019 2.2 Operational Matters 2.2.1 Operational Discipline : The committee was apprised that during system operated in terms of frequency profile for the months OCTOBER 2019 & NOVEMBER 2019 is as given below for discussion by the committee : % of time % of time frequency % of time Frequency Average monthly Month Frequency within the permissible above 50.05 Hz frequency Below 49.90 Hz range of 49.90-50.05 Hz.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    70 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us