Little Pudding River Bridge Replacement MARION COUNTY, OREGON

Little Pudding River Bridge Replacement MARION COUNTY, OREGON

SUBMITTED TO: Marion County Public Works 5155 Silverton Road Salem, Oregon 97305 BY: Shannon & Wilson, Inc. 3990 Collins Way, Suite 100 Lake Oswego, OR 97035 503-210-4750 www.shannonwilson.com GEOTECHNICAL ENGINEERING REPORT Silverton Road: Little Pudding River Bridge Replacement MARION COUNTY, OREGON November 27, 2018 Shannon & Wilson No: 24-1-04094 Silverton Road: Little Pudding River Bridge Replacement Geotechnical Engineering Report CONTENTS 1 Introduction ................................................................................................................................ 1 2 Project Understanding ............................................................................................................... 1 2.1 Site Description ................................................................................................................. 1 2.2 Project Description ........................................................................................................... 2 2.3 Anticipated Construction Sequencing .......................................................................... 3 2.4 Scope of Services .............................................................................................................. 3 3 GEOLOGIC AND SEISMIC SETTING .................................................................................... 4 3.1 Regional Geology ............................................................................................................. 4 3.2 Local Geology ................................................................................................................... 4 3.3 Seismic Setting .................................................................................................................. 5 4 FIELD EXPLORATION AND LABORATORY TESTING .................................................... 7 4.1 Geotechnical Exploration ................................................................................................ 7 4.1.1 Borehole and Sampling ....................................................................................... 7 4.1.2 Dynamic Cone Penetration Test ........................................................................ 7 4.2 Laboratory Testing ........................................................................................................... 8 5 SUBSURFACE CONDITIONS ................................................................................................. 8 5.1 Subsurface Soil Units ....................................................................................................... 8 CONTENTS 5.1.1 Fill ............................................................................................................... 9 5.1.2 Missoula Flood Deposits – Fine Facies ............................................................. 9 5.1.3 Pleistocene Sand and Gravel .............................................................................. 9 5.2 Groundwater................................................................................................................... 10 6 SITE-SPECIFIC SEISMIC HAZARD EVALUATION ......................................................... 10 6.1 Site Class .......................................................................................................................... 10 6.2 Seismic Parameters – “Life Safety” Criteria ............................................................... 11 6.3 Deterministic Response Spectra – “Operational” Criteria ....................................... 11 6.4 Liquefaction and Its Consequences ............................................................................. 12 6.4.1 Liquefaction-Induced Settlement .................................................................... 13 6.4.2 Liquefaction-Induced Slope Instability .......................................................... 13 7 ENGINEERING CONCLUSIONS AND RECOMMENDATIONS ................................... 14 7.1 Foundation Types and Alternatives ............................................................................ 14 24-1-04094 November 27, 2018 ii Silverton Road: Little Pudding River Bridge Replacement Geotechnical Engineering Report 7.2 Drilled Shafts for Abutment Foundations .................................................................. 15 7.2.1 Drilled Shaft Axial Resistance ......................................................................... 16 7.2.2 Downdrag on the Drilled Shafts ..................................................................... 17 7.2.3 Drilled Shaft Lateral Resistance....................................................................... 17 7.2.4 Additional Lateral Load Due to Flow Failure ............................................... 21 7.2.5 Drilled Shaft Construction Considerations .................................................... 21 7.2.5.1 Potential Obstructions ......................................................................... 22 7.2.5.2 Shaft Quality Control ........................................................................... 22 7.3 Abutment Retaining Walls ........................................................................................... 22 7.3.1 Earth Pressures - Abutment Retaining Walls ................................................ 23 7.3.2 Global Stability - Abutment Retaining Walls ................................................ 23 7.3.3 Retaining Wall Backfill Material and Drainage – Abutment Retaining Walls .................................................................................................. 24 7.4 Embankment Retaining Walls ...................................................................................... 24 7.4.1 Retaining Wall Types and Alternatives ......................................................... 24 7.4.2 MSE Retaining Wall Geometry and Soil Parameters ................................... 25 7.4.3 Lateral Earth Pressures - MSE Walls .............................................................. 26 7.4.4 Soil Bearing Resistance - MSE Walls ............................................................... 26 CONTENTS 7.4.5 Settlement - MSE Walls .................................................................................... 26 7.4.6 Lateral Sliding Resistance – MSE Walls ......................................................... 27 7.4.7 Global Stability – MSE Walls ........................................................................... 27 7.4.8 MSE Wall Material and Compaction .............................................................. 28 7.4.9 Retaining Wall Backfill Material and Drainage – MSE Walls ..................... 28 7.5 Embankment Fills .......................................................................................................... 29 7.5.1 Embankment Material and Compaction ........................................................ 29 7.5.2 Embankment Slope ........................................................................................... 29 7.5.3 Embankment Settlement .................................................................................. 29 7.5.4 Embankment Construction Considerations .................................................. 30 7.6 Pavement Design Recommendations .......................................................................... 30 7.6.1 Traffic Data ......................................................................................................... 31 7.6.2 Subgrade ............................................................................................................. 31 24-1-04094 November 27, 2018 iii Silverton Road: Little Pudding River Bridge Replacement Geotechnical Engineering Report 7.6.3 ACP Design Recommendations ...................................................................... 32 7.6.3.1 ACP Design Parameters ...................................................................... 32 7.6.3.2 Recommended New ACP Section ...................................................... 32 8 GENERAL CONSTRUCTION CONSIDERATIONS .......................................................... 33 8.1 Site Preparation .............................................................................................................. 33 8.2 Temporary Cut and Fill Slopes .................................................................................... 33 8.3 Temporary Shoring ........................................................................................................ 33 8.4 Dewatering & Control of Surface Water ..................................................................... 34 9 LIMITATIONS .......................................................................................................................... 34 10 References ................................................................................................................................. 35 Exhibits Exhibit 3-1: USGS Class A Quaternary Faults within an Approximate 30-Mile Radius of the Project Site .............................................................................................................................................6 Exhibit 6-1: "Life Safety" Criteria Seismic Parameters .................................................................. 11 Exhibit 6-2: "Operational" Criteria Acceleration Response Spectrum (VS30 = 200 m/s) ............ 12 Exhibit 7-1: Bridge Abutment Foundation Alternatives............................................................... 15 Exhibit 7-2: Estimated Drilled Shaft Length and Compressive Resistance

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    100 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us