Appendix E Commitments Register SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final

Appendix E Commitments Register SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final

Appendix E Commitments Register SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final Appendix E - South Caucasus Pipeline Expansion Project, Azerbaijan - ESIA Commitments Register Note: This Commitments Register sets out all the specific mitigation measures that the project currently proposes to adopt in relation to potential impacts identified in the ESIA. It is the exclusive and authoritative record of the mitigation measures proposed. The Commitments Register is intended to be read in conjunction with the full text of this ESIA document which provides important context and background, as well as describing the impacts which the listed measures aim to mitigate or manage, and the residual impact which may remain. Appendix E 1 SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final SCPX SCPX Schedule Specific Locations (and Primary SCPX Commitment (Mitigation Management Additional ESIA Issue Ref. KP) Topic Measure) Plan Plan Section Reference A1 1.01 Construction Entire route Geology & Aggregates will only be sourced from licensed Resource 10.2.4 Geomorphology sources as approved by MENR Management Plan A28 1.02 Construction Entire route Economy, Environmental considerations will be included Procurement 10.14.4 Employment, in the project procurement process and Supply Plan Skills & Livelihoods A1 1.03 Construction Entire route Geology & The project will give preference to using Resource 10.2.4 Geomorphology existing borrow pits and/or spoil disposal pits Management where reasonably practical Plan A1 1.05 Pre- Entire route Geology & Environmental audits will be undertaken at any Resource 10.2.4 construction Geomorphology proposed third-party borrow pits and/or spoil Management disposal pits before they are used. Periodic Plan audits will be undertaken thereafter as considered appropriate by the Company A1 1.06 Construction Entire route Geology & Use of borrow pits will be managed in a Resource 10.2.4 Geomorphology manner that seeks to ensure that no illegal Management extraction (including by a third party) takes Plan place A1 1.07 Construction Entire route Geology & All excavated materials will be screened and Resource 10.2.4 Geomorphology reused to the extent deemed feasible by the Management Company to minimise the need for new Plan aggregates A1 1.08 Construction Entire route Landscape When camps and lay-down areas are taken Reinstatement 10.3.4, 10.4.4 out of service, the existing aggregate will be Plan used, as approved by the Company to landscape areas of the site before topsoil is spread; where this is not appropriate, the aggregate will be returned to borrow pits/COMPANY approved disposal areas Appendix E 2 SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final SCPX SCPX Schedule Specific Locations (and Primary SCPX Commitment (Mitigation Management Additional ESIA Issue Ref. KP) Topic Measure) Plan Plan Section Reference A1 1.09 Construction Entire route Geology & All temporary borrow pits will be reinstated Reinstatement 10.2.4, 10.4.4 Geomorphology (unless instructed otherwise by regulatory Plan authorities) A1 1.10 Construction Entire route Geology & Where excavated material is unsuitable for Procurement 10.2.4 Geomorphology padding or backfilling, padding materials (e.g. and Supply Plan sand or small-grained soils/gravel materials) will be bought or sourced from approved borrow pits A1 1.11 Construction Entire route Geology & Where benching is required, surplus subsoil Reinstatement 10.2.4 Geomorphology will be stored on the ROW or, if disposal is Plan necessary, it will be transported to an approved disposal site and/or approved borrow pits A1 1.12 Construction Entire route Soil & Ground Care will be taken to ensure that the trench Reinstatement 10.3.4 Conditions spoil is spread beneath the topsoil and is not Plan left on the surface A0 1.13 Construction Entire route Soil & Ground The construction contractor will have a Introduction to 10.1.3 Conditions documented and operational ESMS aligned ESMMP with the requirements of ISO 14001 Environmental Management Systems A1 1.14 Construction Entire route Geology & Excavated subsoil will be screened and reused Waste 10.2.4 Geomorphology for padding, wherever practicable Management Plan A2 2.01 Construction Entire route Soil & Ground Load-bearing materials, such as bog mats and Reinstatement 10.3.4 Conditions geotextile membranes, will be used to support Plan heavy loads in areas of soft ground (including wetland areas) unless deemed impractical by the Company A2 2.02 Construction Entire route Soil & Ground Vehicle movements will be restricted to Pollution Infrastructure 10.3.4, 10.8.4 Conditions defined access routes and demarcated Prevention Plan & Services working areas (unless in the event of an Management emergency) Plan Appendix E 3 SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final SCPX SCPX Schedule Specific Locations (and Primary SCPX Commitment (Mitigation Management Additional ESIA Issue Ref. KP) Topic Measure) Plan Plan Section Reference A2 2.03 Construction Entire route Soil & Ground Driving along the ROW will not be permitted in Reinstatement 10.3.4 Conditions excessively wet conditions unless otherwise Plan approved by the Company A2 2.04 Construction Entire route Soil & Ground Temporary drainage will be provided where Reinstatement 10.3.4 Conditions necessary to prevent ponding or waterlogging Plan of the working area A2 2.05 Construction Entire route Soil & Ground Backfill will be adequately (but not excessively) Reinstatement 10.3.4, 10.6.4 Conditions compacted to prevent future settlement Plan A2 2.07 Construction Entire route Soil & Ground After backfilling, the subsoil beneath the Reinstatement 10.3.4 Conditions running track will be ripped prior to Plan reinstatement of agricultural land A3 3.03 Construction Entire route Soil & Ground Erosion control measures will be implemented Reinstatement 10.3.4 Conditions to achieve erosion Class 3 or better Plan A3 3.05 Construction Entire route Soil & Ground Temporary dewatering or trench stabilisation Reinstatement 10.3.4 Conditions will be undertaken where required to minimise Plan slumping of trench walls A3 3.07 Construction Entire route Soil & Ground Trench breakers will be installed where Reinstatement 10.3.4, 10.6.4 Conditions downhill flow within the backfilled trench may Plan lead to erosion A3 3.08 Construction Entire route Soil & Ground Soil loss will be monitored and corrective Reinstatement 10.3.4 Conditions actions taken if it exceeds erosion class 3, in Plan accordance with the Reinstatement Plan A2 3.09 Construction Entire route Soil & Ground Local people will be actively discouraged from Reinstatement 10.3.4, Conditions using the ROW as an access road (through Plan 10.7.4, use of signage, public education, leaflets etc.) 10.12.4 A4 3.11 Construction Entire route Soil & Ground Once the topsoil has been replaced it will be Reinstatement 10.3.4. Conditions stone picked to remove any large stones that Plan are not in keeping with the surrounding soil texture Appendix E 4 SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final SCPX SCPX Schedule Specific Locations (and Primary SCPX Commitment (Mitigation Management Additional ESIA Issue Ref. KP) Topic Measure) Plan Plan Section Reference A17 3.14 Construction Entire route Ecology A monitoring plan will be developed to Ecological 10.7.4 & Operations determine the success of re-vegetation and Management bio-restoration activities, including the Plan appropriateness of species composition A2 3.15 Construction Entire route Soil & Ground Upon completion of subsoil and topsoil Reinstatement 10.3.4 Conditions reinstatement, the Contractor and Company plan personnel will inspect disturbed areas jointly for signs of erosion, slope stability, relief, topographic diversity, acceptable surface water drainage capacity and function, and compaction. Remedial measures will be implemented, if necessary, at locations where reinstatement does not meet the Project criteria A3 3.17 Construction Entire route Soil & Ground The rate of discharge of water will be Pollution 10.3.4 Conditions controlled to reduce the risk of soil erosion Prevention Plan A8 3.19 Construction Entire route Landscape Field boundaries will be reinstated to pre- Reinstatement 10.4.4 10.7.4 existing condition on completion of Plan construction A3 3.21 Construction Entire route Surface water Measures to minimise scour and reduce Pollution 10.5.4 sediment load will be implemented at locations Prevention Plan where hydrotest water or other pumped water (including trenchwater) is discharged to surface watercourses or to land (e.g. controlled rate of discharge and deployment of geotextile mats or other physical erosion prevention measures) A7 3.23 Construction Entire route Surface Water At watercourses, bank and bed material will be Reinstatement 10.3.4, 10.5.4 stored separately, away from the active plan 10.7.4 channels and will not be placed where flow or drainage will be obstructed Appendix E 5 SCP Expansion Project, Azerbaijan Environmental and Social Impact Assessment Final SCPX SCPX Schedule Specific Locations (and Primary SCPX Commitment (Mitigation Management Additional ESIA Issue Ref. KP) Topic Measure) Plan Plan Section Reference A3 3.24 Construction Entire route Surface Water At locations where trenchwater or hydrotest Pollution 10.5.4 water or other pumped water discharges Prevention Plan causes scour or soil erosion, eroded areas will be reinstated

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    70 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us