Tidal Power Generation

Tidal Power Generation

Tidal Power Generation Silent, invisible, predictable and renewable. Tidal Energy takes a quantum leap Michael Wrigley 4 October 2008 Presentation to the Institution of Engineering and Technology September 2008 Background information Why? How? Where? The ARE project Plans Status The future Alderney Renewable Energy Ltd, N° 1 The Crusher, Braye Harbour, Alderney, Channel Islands GY9 3XX Alderney Registered No. 1486 Tel. +44(0)1481 825555 Fax +44(0)1481 822593 Email: [email protected] www.are.gb.com Michael Wrigley 4 October 2008 The need • The energy strategy of the majority of Western European countries apears worrying in the medium term – in terms of resources – in terms of its carbon footprint Michael Wrigley 4 October 2008 National Grid Gas Forecasts & Import Requirement source – www.nationalgrid.com 140 100% Actuals Forecast 120 80% 100 60% Imports% 80 60 40% 40 Supply / Demand (bcm/y) SupplyDemand / 20% 20 0 0% 00/01 02/03 04/05 06/07 08/09 10/11 12/13 14/15 16/17 UKCS 2007 UKCS Upside UK Demand exc IUK % Import Requirement Michael Wrigley 4 October 2008 Brent oil price • We all know what has happened to the oil price in recent months but where will it go next? Michael Wrigley 4 October 2008 Global warming driving demand for clean energy – UN forecast 85% increase in global energy consumption by 2020 – Global warming a reality. – Increasing desire for lower carbon emissions and increased use of alternative energies – In last three years oil price has increased from <$20 to >$??? – Many governments are providing large subsidies for “clean” energy solutions Michael Wrigley 4 October 2008 “Clean” energy sources • Nuclear • Wind • Wave • Solar • Tidal • Biomass • Others Michael Wrigley 4 October 2008 Tidal energy advantages Predict- Energy Visual & • The produced energy ability density acoustic is 100% predictable impact Tidal (to 100 years!) • The turbines are Wave underwater – invisible and inaudible Wind • Water density is 830 Bio fuels times that of air Solar Michael Wrigley 4 October 2008 Benefits of Tidal Power • It’s predictable, unlike wind and wave • Large amounts can be harvested but only in certain locations • It’s clean – Little/no visual impact on environment – Other environmental issues expected to be modest Michael Wrigley 4 October 2008 Tidal Power Industry • Tidal Power Industry is still in the early stages of development but is progressing rapidly • No commercial Tidal Stream power farms exist Michael Wrigley 4 October 2008 Tidal Devices Michael Wrigley 4 October 2008 Time for some sums! • POWER MAX= 0.5 x A x R x C x VELOCITY CUBED – Where A is the swept out area of the propeller. [square metres] – Where R is the density of the fluid [seawater is 1024 kg/cubic metre] – C is the capacity factor to allow for efficiency of the turbine design for capture of the stream energy. • For a 20 metre propeller, a sea device in a 3.5 metres/second current can generate 2 MW. • A 2 MW wind generator would require a wind speed of 360 km/hour, Michael Wrigley 4 October 2008 Tidal Power Industry – A single test unit of 1MW currently costs approx. £6m to deploy (wind comparison £750k) – Economies of scale will bring costs down to viable levels – Carbon Trust report and industry estimates confirm the long term financial viability of Tidal Power – UK Gov investing £50m in marine renewables. Michael Wrigley 4 October 2008 Marine Current Technologies’ map of suitable UK sites for tidal energy • Alderney is one of the Channel Islands • Alderney has the second best resource for Tidal Stream power in Northern Europe. Alderney Michael Wrigley 4 October 2008 Alderney Tidal Resource • Just 8 nautical miles from the coast of France – and connection to the French grid. • Direct connection to UK grid is also possible (60 nautical miles). • Estimates of harvestable tidal stream power range from 2 to 3GW Michael Wrigley 4 October 2008 Alderney’s Resources • The island’s current electrical needs are only 1.5MW • Electrical energy currently comes from imported fuel oil. Michael Wrigley 4 October 2008 The project phases 1. Obtain a 5 year exclusive development licence 2. Develop devices at EMEC and prepare the ground in and around Alderney – Consents – Map out the resource – Bathymetric surveys – Environmental aspects – Health & safety aspects 3. Install in Alderney waters and produce “x MWh over y months before z” 4. Obtain 50 year exclusive operations licence 5. Connect to Alderney grid and supply the island 6. Connect to French +/- Guernsey grid 7. Connect to UK grid Michael Wrigley 4 October 2008 Phase 1 - The Principal Parties • The States of Alderney – A democratically elected government (Alderney is not part of the United Kingdom) • ACRE - Alderney Commission for Renewable Energy – Reports to the States of Alderney – Represents the monitoring and control body overseeing ARE • ARE - Alderney Renewable Energy Ltd – A local company holding an exclusive licence to exploit the energy in the Alderney territorial waters • AEL - Alderney Electricity Ltd – The company currently responsible for the production and distribution of electrical energy on the island Michael Wrigley 4 October 2008 Mission Statement Alderney Renewable Energy aims to ensure Alderney’s energy-producing marine resources are harvested effectively and safely in a manner that benefits Alderney, is economically viable, is sensitive to the local environment and contributes to the world requirement for clean energy. Michael Wrigley 4 October 2008 The challenges • Technological – Find the most appropriate solution for the environment and Alderney’s resources • Financial – Get listed for marine renewable energy subsidies – Tidal energy cost effectiveness – Other financial resources • Electrical grid connection – Connection to French grid – …somewhere between Cherbourg and Flamanville Michael Wrigley 4 October 2008 What’s happened so far? ARE activity and progress • Phase 1 - December 2005 – contract signed with States of Alderney • Meeting the challenges – Phases 2 to ??? – Environmental impact assessment issues – Relations with device developers – Discussions with French authorities re: grid connection – Discussions with UK government re: grid connection – Discussions with UK government re: subsidies – Further substantial investment Michael Wrigley 4 October 2008 PUBLIC CONSULTATION • Extensive formal public consultation on the island – Fisheries Officers – Sailing Club – Licensed Fishing Boats Owners Association – Alderney Wildlife Trust – Maritime Trust – Alderney Electricity Limited – Building Development Committee – Diving Club – Alderney Society • Consultations in France – In planning stages Michael Wrigley 4 October 2008 Local population support Michael Wrigley 4 October 2008 Logistics difficulties getting there and back • Sea – Guernsey 4/week – Cherbourg 2/week, Dielette 2/week • Air – Guernsey 4/day – Southampton 3/day, Bournemouth 2/day Michael Wrigley 4 October 2008 Arriving/leaving by air • The runway is 880m long • “Weather is king” • A Trislander carries 16 passengers Michael Wrigley 4 October 2008 Phase 2 • Environmental Impact Assessments – Programme devised by Entec, a leading UK environmental consultancy – Surveys commenced March 2006 (two years’ data needed) – 1,500 nautical miles of marine survey transects in the Swinge and the Race – UK professional wildlife surveyor flown in every fortnight – Habitat mapping and benthic ecology – Guidance from Alderney Wildlife Trust where appropriate – Environmental Impacts Study submitted to ACRE in November 2007 Michael Wrigley 4 October 2008 Phase 2 • Environmental Impact Assessments - Marine mammals – Short beaked dolphin (Delphinus delphis) – Bottle-nosed dolphin (Tursiops truncatus) – Grey seals (Halichoerus grypus) – Basking shark (Cetorhinus maximus) – Need to sight from boats or the shore (or, for seals, in haul out areas) – Very little information on breeding habits • Fish – Detection with sonar – information on migratory and breeding habits is very difficult to obtain Michael Wrigley 4 October 2008 Phase 2 • Environmental Impact Assessments – Bird life – West Coast and Burhou Islands are designated as a Ramsar site – Northern Gannets (Morus bassanus) – 5 900 breeding pairs – 1 000 non-breeding adults – 5 000 sub-adult birds – 2% of world population – international importance – Storm Petrel (Hydrobates pelagicus) – 60-100 pairs (2000), 30 000 pairs in 1974 – Atlantic Puffin (Fratercula arctica) – 180 pairs (50 000 pairs in 1953) Michael Wrigley 4 October 2008 Gannet migration • Gannets from Alderney have been found in Morocco, as far as Mauritania and in Norway Michael Wrigley 4 October 2008 Phase 2 • Resource mapping – Work commenced to quantify the extractable power resource in Alderney’s waters – Deployment of ADPs (Acoustic Doppler Profilers) since September 2005 – HR Wallingford have scoped 3D modelling of the resource – Geophysical and bathymetric surveys in 2007 along with additional ADP data collection – Some good news, some “not so good” news Michael Wrigley 4 October 2008 Phase 2 • Principal device developers – Current to Current Corporation – Tidal Generation Ltd – Open Hydro – HammerFest – Strom – Clean Current Power Systems Inc. – MCT – Lunar – Overberg – SMD Hydro Michael Wrigley 4 October 2008 Production devices • Agreement with leading device developer – Have already deployed test units in Scotland – Sub surface solution – Agreement reached in principle for test unit to be deployed in Alderney in 2009 – Synchronised with UK grid May 2008 Michael Wrigley 4 October 2008 Production

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us