The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility 8 February 2019 307074-02081-800 – EN-REP-0001 ISC: Unrestricted The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility Disclaimer The attached Report (the “Report”) has been prepared by WorleyParsons Canada Services Ltd., operating as Advisian (Advisian) for the benefit of the City of Calgary (the “Client”) in accordance with the agreement between Advisian and the Client, including the scope of work, purpose and objectives detailed therein. 1. USE OF REPORT BY CLIENT This report has been prepared by Advisian for the exclusive use of the Client and their agents, who are assumed to have reviewed the scope of work for this project and understand its limitations. The report and its contents are intended for the sole use of the Client as stated below. The Client shall at all times be entitled to fully use and rely on this report, including all attachments, drawings, and schedules, for the specific purpose for which the report was prepared, in each case notwithstanding any provision, disclaimer, or waiver in the report that reliance is not permitted. The Client shall at all times be entitled to provide copies of the report to City Council, City of Calgary regulatory boards, City of Calgary employees, officers, agents, affiliates, advisors, consultants, parties contracting with The City of Calgary, lenders and assignees and other governmental authorities and regulatory bodies having jurisdiction, each of whom shall also be similarly entitled to fully use and rely on the report in the same manner and to the same extent as The Client for the specific purpose for which the report was prepared. The Client may also contact the author or any other parties to the report to request further information respecting the report or to discuss the report further. 2. CONDITIONS OF CONTRACT AND LIMITATIONS The report is subject to the terms and conditions of the Master Consulting Agreement executed between the Client and Advisian. 3. STANDARD OF CARE Advisian warrants that its services are performed, within the limits prescribed by its clients, in a manner consistent with that level of care and skill ordinarily exercised by members of the same profession practicing in the same locality under similar conditions at the time the services are performed. No other warranty or representation, either expressed or implied, is included in the reports. Nothing in this report is intended to constitute or provide a legal opinion. 4. INFORMATION SUPPLIED BY OTHERS Advisian has exercised reasonable professional skill, care, and diligence to assess the information acquired during the preparation of this report, but makes no guarantees or warranties as to the accuracy or completeness of this information. The information contained in this report is based upon, and limited by, the circumstances and conditions acknowledged herein, and upon information available at the time of its preparation. The information provided by others is believed to be accurate but cannot be guaranteed. U:\CAL\GBS\307074-02081\800 - CEAA Proj Description\Final - Round 2\City of Calgary Green Line MSF_PD-Final - 08Feb19.docx ISC: Unrestricted i The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility 5. REPORT AS A COMPLETE DOCUMENT This report is intended to be used in its entirety, and no individual part of the report may be taken as representative of the findings of the report. No part of this report may be reproduced, stored in a retrieval system, or transmitted in any form; by any third party without the expressed written permission of the Client or Advisian. Any questions concerning the information or its interpretation should be directed to Advisian. 6. RELIANCE Any use, reliance on, or decision made, by any person not specified in Section 1 – Use of Report By Client (a “Third Party”) based on this report is the sole responsibility of the Third Party except to the extent that Third Party has obtained written consent of Advisian to use and rely upon the Report and contents. Advisian makes no representation or warranty to any Third Party with regard to this report and/or the work referred to in this report, and accepts no duty of care to any Third Party or any liability or responsibility whatsoever for any losses, expenses, damages, fines, penalties or other harm that may be suffered or incurred as a result of the use of, reliance on, any decision made, or any action taken based on, this report or the work referred to in this report. City of Calgary Green Line MSF_PD-Final - 08Feb19 ISC: Unrestricted ii The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility Contents 1. General Information and Contacts........................................................................................................................................ 1 1.1 Nature of the Designated Project and Proposed Location ........................................................................ 1 1.2 Proponent Information ............................................................................................................................................. 1 1.3 Summary of Parties Engaged to Date ................................................................................................................. 2 1.4 Requirements Under Other Jurisdictions ........................................................................................................... 5 1.4.1 Federal Jurisdiction .................................................................................................................................................. 5 1.4.2 Provincial Requirements ........................................................................................................................................ 5 1.4.3 Municipal and Regional Requirements............................................................................................................ 7 1.5 Regional Environmental Studies ........................................................................................................................... 8 2. Project Information ..................................................................................................................................................................... 9 2.1 General Project Description .................................................................................................................................... 9 2.2 Designated Physical Activities ................................................................................................................................ 9 2.3 Components and Activities ................................................................................................................................... 10 2.3.1 Physical Works ......................................................................................................................................................... 10 2.3.2 Production Capacity .............................................................................................................................................. 15 2.3.3 Expansion Component of the Project ............................................................................................................ 17 2.3.4 Incidental Activities ................................................................................................................................................ 17 2.4 Emissions, Discharges and Waste ....................................................................................................................... 18 2.4.1 Atmospheric Emissions ........................................................................................................................................ 18 2.4.2 Liquid Discharges ................................................................................................................................................... 22 2.4.3 Waste .......................................................................................................................................................................... 24 2.5 Project Phases and Schedule ................................................................................................................................ 25 2.5.1 Key Project Phases ................................................................................................................................................. 25 2.5.2 Main Activities ......................................................................................................................................................... 26 City of Calgary Green Line MSF_PD-Final - 08Feb19 ISC: Unrestricted iii The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility 3. Project Location .......................................................................................................................................................................... 29 3.1 Location Description ................................................................................................................................................ 29 3.1.1 Project Coordinates ..............................................................................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages159 Page
-
File Size-