An Overview of Pub Singapore & Our Water Quality

An Overview of Pub Singapore & Our Water Quality

AN OVERVIEW OF PUB SINGAPORE & OUR WATER QUALITY CHALLENGES Puah Aik Num Chief Engineer, Water Supply (Plants) Department MacRitchie Reservoir 1 Presentation Overview 1. Brief overview of Singapore & PUB 2. Brief overview of Choa Chu Kang Waterworks 3. Our water quality challenges 4. Feasibility study of the SIX® technology www.pub.gov.sg 2 About Singapore & PUB MacRitchie Reservoir Singapore Singapore Land Area ~719 km2 Population 5.6 mil Average Annual Rainfall 2.328m Average Water Demand 430MGD (1.95mil m3/day) www.pub.gov.sg Our Key Strategies Capture every drop or water Technology & Innovation Reuse water endlessly Desalinate seawater www.pub.gov.sg 5 Our Closed Water Loop www.pub.gov.sg Our Four National Taps www.pub.gov.sg Local Catchment Capture Every Drop Choa Chu Kang Waterworks • 17 Reservoirs • 2/3 Catchment Area • 8 Waterworks (including Johor River Waterworks) www.pub.gov.sg Choa Chu Kang Waterworks MacRitchie Reservoir Choa Chu Kang WaterworksCapture Every Drop • Serves the western catchment • 3 raw water sources • Capacity of 80 MGD • 40 MGD Phase 1: Membranes • 40 MGD Phase 2: Sand filters Kranji Reservoir Choa Chu Kang Waterworks Tengeh Reservoir Pandan Reservoir www.pub.gov.sg 10 PHASE 2 Completed : 1981 Capacity : 182,000 m3/day (40 mgd) Pandan PHASE 1 Kranji Completed : 1976 Tengeh Capacity : 182,000 m3/day (40mgd) Upgraded to UF Membrane Filtration in 2008 www.pub.gov.sg 11 Treatment Process CCK Phase 1 (Membranes) Fluoride Sodium Ammonia Alum Sodium Hypo Hypo Sodium Lime Raw water Hypo Lime Reservoirs Pumping Station Clear Water Tank Screening Sedimentation Coagulation To Service Immersed Ultra Chlorine & Flocculation Reservoir Filtration Contact Tank Sludge Treatment Plant CCK Phase 2 (Sand Filters) Ammonia Alum Sodium Fluoride Sodium Polymer Sodium Lime Hypo Raw water Hypo Hypo Reservoirs Lime Pumping Station Clear Water Screening Sedimentation Tank Coagulation Sand Filtration To Service & Flocculation Ozone Reservoir www.pub.gov.sg 12 Our Water Quality Challenges MacRitchie Reservoir 13 Reservoir Water Quality Challenges Kranji Kranji Sarimbun • Nutrient loads from agricultural catchment • Blue-green algae growth Murai • Higher TOC Tengeh-Poyan Poyan • Blue-green algae growth Pandan • Higher TOC • Indirect catchment Jurong Lake • Low turnover in dry period Pandan Tengeh CCKWW • Blue-green algae growth • Higher TOC High TOC in raw water risks the formation of Disinfection By-products High algae counts, particularly blue-green algae counts, can result in aesthetic issues, e.g. visual impact (algal scum) and undesirable taste and odour compounds (MIB & geosmin) www.pub.gov.sg 14 Increasing TOC Levels of our Raw Waters TOC Levels of Raw Water Sources 20,0 Kranji Pandan Tengeh Blended 18,0 16,0 14,0 12,0 10,0 2X in 10 TOC (mg/L)TOC 8,0 years 6,0 4,0 2,0 0,0 1 Jan 2012 1 Jan 2013 2 Jan 2014 3 Jan 2015 4 Jan 2016 4 Jan 2017 5 Jan 2018 6 Jan 2019 7 Jan 2020 7 Jan 2021 8 Jan 2022 www.pub.gov.sg 15 Increasing DOC Levels of our Raw Waters DOC Levels of Raw Water Sources 10,0 9,0 8,0 7,0 2X in 10 6,0 years 5,0 DOC DOC (mg/L) 4,0 3,0 2,0 1,0 Kranji Pandan Tengeh Blended 0,0 1 Jan 2012 1 Jan 2013 2 Jan 2014 3 Jan 2015 4 Jan 2016 4 Jan 2017 5 Jan 2018 6 Jan 2019 7 Jan 2020 7 Jan 2021 8 Jan 2022 www.pub.gov.sg 16 Varying Quality of Raw Waters Unique DOC profiles for each water source 7 Humics 6 Building Blocks Biopolymers 5 Kranji Pandan LMW 4 Tengeh Blended 3 Relative Signal Response 2 1 0 0 10 20 30 40 50 60 70 80 90 100 www.pub.gov.sg Retention Time (min) 18 Impact of DOCs on CCKWW • Increase chlorine demand • Increase membrane fouling • Increase DBP / TTHM formation potential • Higher nitrification potential in distribution network www.pub.gov.sg 19 Current Control Measures • Operational tweaks • For e.g. changing blending ratios, enhanced coagulation, maintaining a narrow band for residual chlorine levels, etc. • Process upgrading to enhance DOC removal • Including upgrading of sand filters to ceramic membranes, and a new BAC and ozone process www.pub.gov.sg 20 Feasibility Study of SIX® MacRitchie Reservoir 21 Feasibility of SIX® at CCKWW DOC removal by SIX® • A 6-month bench-scale trial of SIX® was done in CCKWW (Dec 2017 to Jun 2018) • Results showed the following optimal operating conditions: Resin concentration 15 – 20 mL/L Contact time 30 minutes DOC removal 42% for blended water UVT increase 17.6% for blended water www.pub.gov.sg 22 LC-OCD Sample Analysis DOC removal by SIX® vs coagulation SIX and coagulation target Humics 5 different DOC fractions. Biopolymers Building Blocks 4 LMW 3 Blended RW (6 Feb 18) SIX (LL 15mL/L) (6 Feb 18) Settled Water (1 Feb 18) Blended RW (1 Feb 18) 2 Relative Signal Response Signal Relative 1 0 0 10 20 30 40 50 60 70 80 90 100 Retention Time (min) www.pub.gov.sg 23 LC-OCD Sample Analysis Further DOC removal using coagulation after SIX® Humics 5 Enhanced DOC removal Biopolymers Building Blocks using lesser coagulant. 4 LMW 3 Blended RW (6 Feb 18) SIX (LL 15mL/L) (6 Feb 18) 2 SIX-FeCl3 (10ppm) (7 Feb 18) SIX-Alum (15ppm) (7 Feb 18) Relative Signal Response Signal Relative 1 0 0 10 20 30 40 50 60 70 80 90 100 Retention Time (min) www.pub.gov.sg 24 Feasibility of SIX® at CCKWW Brine challenges • The regeneration process requires ~30 g/L NaCl solution • A waste brine is generated: Amount of salt required 70 tonnes/day 3 Total amount of brine waste: ~2,346 m /day Sewer discharge limits Chloride in the brine waste 6,150 ppm in Singapore: • TDS < 3,000 ppm TDS in the brine waste >6,150 ppm • Cl- < 1,000 ppm *Values based on calculations for 80 MGD www.pub.gov.sg 25 Feasibility of SIX® at CCKWW Brine management options? • Blending of brine with other waste streams • On-site treatment of brine • Discharging of brine into sea • Injection into the ground IDEAS? www.pub.gov.sg Thank you MacRitchie Reservoir.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us