SOUTH WEST ENGLAND and the WAVE HUB 10 July 2009 NICK HARRINGTON – HEAD of MARINE ENERGY SOUTH WEST RDA WAVE & TIDAL RESOURCE

SOUTH WEST ENGLAND and the WAVE HUB 10 July 2009 NICK HARRINGTON – HEAD of MARINE ENERGY SOUTH WEST RDA WAVE & TIDAL RESOURCE

SOUTH WEST ENGLAND AND THE WAVE HUB 10 July 2009 NICK HARRINGTON – HEAD OF MARINE ENERGY SOUTH WEST RDA WAVE & TIDAL RESOURCE • Could provide 15% - 20% of UK demand • European resource 290GW • Worldwide annual revenues of €65 - €200 billion WAVE POWER LEVELS IN kW/m OF CREST LENGTH IN EUROPEAN WATERS Source: Wave Energy Utilization in Europe (European Thematic Network on Marine Energy) TIDAL RESOURCE IN SW ENGLAND DECC TIDAL RESOURCE IN SW ENGLAND Marine “Shoots” Barrage Current 1GW Turbines “SeaGEN” * “Severn” Barrage 8GW “Outer” Barrage 15GW SOUTH WEST WAVE RESOURCE DECC WAVE HUB Source: JP Kenny WAVE HUB WAVE HUB PROVIDES • Consented sea area • Grid connected 5MW per berth at 11kV • Monitoring and testing • Opportunities to collaborate • Access to suppliers and research base • Experience of operations • Can be upgraded to 50MW with 33kV operation UK ROUTE TO COMMERCIALISATION R&D NaREC Demonstration Initial prototype EMEC Refined prototype Wave Hub Pre- commercial device Market entry with commercial product Market penetration TIMETABLE • Landowner agreements signed- June 2009 • Funding unconditional - June 2009 • Developer commitments - June 2009 • Operating and capital budgets confirmed - July 2009 • Decision to proceed - July 2009 • Order sub-sea cable - July 2009 • Set up operating company - Summer 2009 • Onshore works - Autumn 2009 • Tender installation contracts - Autumn/Winter 2009 • Cable and equipment delivery - Spring 2010 • Installation and commissioning - Summer 2010 CHALLENGES Devices • Demonstrate and improve performance and reliability • Understand array configurations and distribution CHALLENGES X X X X X X X X X X X < ? > CHALLENGES X X X X X X ? X X X X X CHALLENGES > ? > < ? < CHALLENGES Devices • Demonstrate and improve performance and reliability • Understand array configurations and distribution • Anchoring • Installation, operations and maintenance • Safety Policy and Environment • Environmental impacts of large scale sites • Planning for commercial sites • Research to reduce uncertainties OPPORTUNITIES FOR MARITIME REGIONS • Operation and maintenance • Deployment • Manufacture/assembly • Supply chain • Knowledge based consultancies • Tourism FUNDING EU Convergence Programme DECC BIS SW RDA FURTHER INFORMATION: www.wavehub.co.uk [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us