Hanson Limited Barton Quarry Barton-Under-Needwood, Staffordshire

Hanson Limited Barton Quarry Barton-Under-Needwood, Staffordshire

QPL.HAN.BuN.H&HIA17.03 Hanson Limited Barton Quarry Barton-under-Needwood, Staffordshire Planning Application for a Western Extension to Existing Consented Mineral Extraction Hydrological & Hydrogeological Impact Assessment 28th November 2017 Report Prepared For: Hanson Limited Ashby Road East Shepshed, Nr. Loughborough Leicestershire LE12 9BU Tel: (0044) 150 950 1201 Fax: Email: [email protected] Technology Centre, Wolverhampton Science Park, Glashier Diver, Wolverhampton West Midlands, WV10 9RU. Tel: 01902 824111, Fax: 01902 824112 Consultant Hydrogeologists Limited email: [email protected], web: http://www.bclhydro.co.uk Registered Office: 33, Wolverhampton Road, Cannock, West Midands, WV11 1AP Registered in England & Wales. Company Registration Number: 4043373 This Page Intentionally Left Blank QPL.HAN.BuN.H&HIA17.03 Hanson Limited Barton Quarry Barton-under-Needwood, Staffordshire Planning Application for a Western Extension to Existing Consented Mineral Extraction Hydrological & Hydrogeological Impact Assessment 28th November 2017 Technology Centre, Wolverhampton Science Park, Glashier Diver, Wolverhampton West Midlands, WV10 9RU. Tel: 01902 824111, Fax: 01902 824112 Consultant Hydrogeologists Limited email: [email protected], web: http://www.bclhydro.co.uk Registered Office: 33, Wolverhampton Road, Cannock, West Midands, WV11 1AP Registered in England & Wales. Company Registration Number: 4043373 This Page Intentionally Left Blank Hanson Limited, Barton Quarry, Barton-under-Needwood, Staffordshire Planning Application for a Western Extension to Existing Consented Mineral Extraction Hydrological & Hydrogeological Impact Assessment Document History Date Version BCL Ref. Comments Issued to No. 17/11/17 01 QPL.HAN.BuN.H&HIA17.01 Initial Draft for Client & Agent review. First Publication Draft. (i) Incorporation of client commentary on Initial Draft; Steve Lamb, (ii) Addition of Executive Summary; Quarryplan Ltd; 27/11/17 02 QPL.HAN.BuN.H&HIA17.02 (iii) Addition of LIDAR open water level data for R.Trent & Restoration Lakes (figure 19); Brian Shaw, & (iv) Addition of commentary regarding need for licence variation for local abstraction; Marcus Dorey, (v) Addition of Table 13; “Summary Impact & Mitigation Schedule”, and; both Hanson (vi) Addition of FRA (appendix 10). Ltd. Addition of deregulated PWS data supplied by Lichfield District Council (27/11/17) at 28/11/17 03 QPL.HAN.BuN.H&HIA17.03 Table 1 & Figure 6. Contents Page Number EXECUTIVE SUMMARY 1 INTRODUCTION....................................................................................1 1.1 Background...........................................................................................................1 1.2 Competence of Persons Undertaking Assessment...............................................1 1.3 Technical Difficulties.............................................................................................1 1.4 Methodology.........................................................................................................1 1.5 Scope.....................................................................................................................2 1.5.1 Minerals Local Plan.............................................................................................2 1.5.2 Pre Application Advice........................................................................................3 1.5.3 Site Authorisations..............................................................................................3 Planning Permission ES.4079/16......................................................................................3 Abstraction Licence No. 3/28/24/103/G.........................................................................4 Abstraction Licence No. 3/28/24/106/G.........................................................................4 Discharge Consent No. T/24/35549/T.............................................................................4 Environmental Permit No. EPR/BP3827XZ......................................................................4 1.6 Data Sources..........................................................................................................5 1.7 Definition of Assessment Baseline........................................................................5 2 BASELINE CONDITIONS..........................................................................7 2.1 Location.................................................................................................................7 2.2 Site Composition & Land Use................................................................................7 2.3 Topography...........................................................................................................8 2.4 Hydrological & Hydrogeological Administrative Units..........................................9 2.4.1 Water Framework Directive River Basin District................................................9 2.4.2 WFD Administrative Catchment.........................................................................9 2.4.3 Flood Risk Zonation...........................................................................................10 QPL.HAN.BuN.H&HIA17.03 28th November 2017 Hanson Limited, Barton Quarry, Barton-under-Needwood, Staffordshire Planning Application for a Western Extension to Existing Consented Mineral Extraction Hydrological & Hydrogeological Impact Assessment Fluvial Flooding...............................................................................................................10 Fluvial Flood Defences....................................................................................................12 Surface Water Flooding..................................................................................................12 2.4.4 Aquifer Classification.........................................................................................12 2.4.5 Groundwater Vulnerability Zonation................................................................13 2.4.6 Catchment Abstraction Management Strategy................................................13 Background......................................................................................................................13 Water Resource Availability Status................................................................................14 2.5 Protected Water Rights & Authorisations...........................................................15 2.5.1 Source Protection Zones...................................................................................15 2.5.2 Abstractions......................................................................................................15 Exempt Activities.............................................................................................................15 Deregulated.....................................................................................................................17 Licensed...........................................................................................................................17 2.5.3 Consented Discharges.......................................................................................19 2.6 Designated Sites of Ecological Importance.........................................................21 2.6.1 Statutorily Protected.........................................................................................21 2.6.2 Non-Statutorily Protected.................................................................................22 2.7 Landfill Sites.........................................................................................................24 2.8 Geology...............................................................................................................25 2.8.1 Bedrock..............................................................................................................26 2.8.2 Drift....................................................................................................................27 Overview..........................................................................................................................27 The Economic Mineral....................................................................................................28 2.9 Rainfall.................................................................................................................31 2.9.1 Long Term Averages..........................................................................................31 2.9.2 Effective Rainfall................................................................................................32 2.10 Hydrology............................................................................................................33 2.10.1 Physical Surface Water Catchments.................................................................33 2.10.2 Local Drainage Direction...................................................................................33 2.10.3 Agricultural Under-drainage.............................................................................33 2.10.4 Drainage Ditches...............................................................................................33 2.10.5 Hydrological Characteristics of Soils.................................................................34 2.10.6 Surface Water-Courses.....................................................................................34 River Trent.......................................................................................................................34

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    114 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us