Resettlement Action Plan (RAP)Contract WSIP/B1/GF/01

Resettlement Action Plan (RAP)Contract WSIP/B1/GF/01

Sindh Water Sector Improvement Project Resettlement Action Plan (RAP) Contract WSIP/B1/GF/01 May 2016 Sindh Irrigation and Drainage Authority Sindh253277 WaterEVT WERSector 0109 B C:\Users\jew47974\Desktop\Temp\2016-05-15\Rev H\2016-05-15 Resettlement Action Plan for Contract WSIP-B1-GF-01 (Rev H).docx Improvement Project06 December 2010 Resettlement Action Plan (RAP) Contract WSIP/B1/GF/01 May 2016 Sindh Irrigation and Drainage Authority SIDA Left Bank Barrage Colony Hyderabad Sindh Pakistan Sindh Water Sector Improvement Project Content Chapter Title Page Executive Summary i 1. Introduction 1 1.1 The Indus Basin Irrigation System ______________________________________________________ 1 1.2 Sindh Water Sector Improvement Project ________________________________________________ 1 1.3 Contract WSIP/B1/GF/01: Rehabilitation of Ghotki Feeder Canal ______________________________ 3 2. Policy, Legal and Administrative Framework 9 2.1 Introduction ________________________________________________________________________ 9 2.2 Pakistan Legal Framework ____________________________________________________________ 9 2.3 Lender Policy _____________________________________________________________________ 13 2.4 Review of Government and World Bank Resettlement Policies _______________________________ 16 2.5 WSIP Social Impact Management Framework ____________________________________________ 17 2.6 Entitlement Matrix __________________________________________________________________ 17 3. Description of the Sub-Project 22 3.1 General Institutional Arrangements, Roles & Responsibilities ________________________________ 22 3.2 Location of the Project ______________________________________________________________ 24 3.3 Right of Way ______________________________________________________________________ 25 3.4 Scope of Works ___________________________________________________________________ 26 3.5 Labour Requirements _______________________________________________________________ 27 3.6 Assessment of Potential Impacts ______________________________________________________ 27 3.7 Proposed Construction Activities ______________________________________________________ 32 3.8 Corridor of Impact (CoI) _____________________________________________________________ 37 4. Socio-Economic Studies 40 4.1 Approach and Methodology __________________________________________________________ 40 4.2 Socio-Economic Profile of Sub-Project Area _____________________________________________ 41 4.3 Socio-Economic Profile of CoI ________________________________________________________ 47 5. Assessment of Impacts 60 5.1 General __________________________________________________________________________ 60 5.2 Identification of PAPs _______________________________________________________________ 60 5.3 Overview of Impacts ________________________________________________________________ 61 5.4 Loss of Agricultural Land ____________________________________________________________ 61 5.5 Loss of Residential, Commercial, Industrial or Institutional Land ______________________________ 62 5.6 Loss of Structures__________________________________________________________________ 62 5.7 Impact to Income __________________________________________________________________ 66 5.8 Impacts on Trees __________________________________________________________________ 68 5.9 Indirect Impacts ___________________________________________________________________ 68 5.10 Summary ________________________________________________________________________ 69 253277/EVT/WER/265/H May 2016 C:\Users\jew47974\Desktop\Temp\2016-05-15\Rev H\2016-05-15 Resettlement Action Plan for Contract WSIP-B1-GF-01 (Rev H).docx Sindh Water Sector Improvement Project 6. Public Consultation and Information Disclosure 70 6.1 Introduction _______________________________________________________________________ 70 6.2 Objectives of Consultation ___________________________________________________________ 70 6.3 Methodology ______________________________________________________________________ 70 6.4 Consultations with Project Affected Persons _____________________________________________ 71 6.5 Consultation with Local Women Community _____________________________________________ 73 6.6 Meetings with Secondary Stakeholders _________________________________________________ 74 6.7 Grass Root Stakeholders Consultation __________________________________________________ 74 6.8 Summary of Consultation Findings _____________________________________________________ 74 7. Relocation and Compensation Plan 76 7.1 General __________________________________________________________________________ 76 7.2 Loss: Land (Agricultural) _____________________________________________________________ 76 7.3 Loss: Land (Residential and Commercial) _______________________________________________ 78 7.4 Loss: Privately Owned Structures _____________________________________________________ 85 7.5 Loss: Community or Institutional Structures ______________________________________________ 86 7.6 Loss: Income _____________________________________________________________________ 86 8. Institutional Arrangements 88 8.1 Sindh Irrigation and Drainage Authority _________________________________________________ 88 8.2 Ghotki Area Water Board ____________________________________________________________ 88 8.3 Board of Revenue _________________________________________________________________ 89 8.4 Project Coordination and Monitoring Unit (PCMU) _________________________________________ 89 8.5 Monitoring and Evaluation Consultants _________________________________________________ 89 8.6 Project Implementation Consultants ____________________________________________________ 90 8.7 Contractor ________________________________________________________________________ 91 8.8 Grievance Redress _________________________________________________________________ 91 8.9 Organisation Structure ______________________________________________________________ 93 8.10 Training and Capacity Building ________________________________________________________ 94 9. Budget 96 10. Implementation of RAP 99 10.1 Introduction _______________________________________________________________________ 99 10.2 Implementation Schedule ____________________________________________________________ 99 10.3 RAP Implementation Detail _________________________________________________________ 102 11. Monitoring and Evaluation 107 11.1 Introduction ______________________________________________________________________ 107 11.2 Monitoring and Evaluation __________________________________________________________ 107 11.3 Internal Monitoring ________________________________________________________________ 107 11.4 External Monitoring and Evaluation ___________________________________________________ 108 11.5 Monitoring Framework _____________________________________________________________ 109 Appendices 110 253277/EVT/WER/265/H May 2016 C:\Users\jew47974\Desktop\Temp\2016-05-15\Rev H\2016-05-15 Resettlement Action Plan for Contract WSIP-B1-GF-01 (Rev H).docx Sindh Water Sector Improvement Project Appendix A. Organization Chart of PIC Social Team ________________________________________________ 111 Appendix B. Additional Details of Survey Participants & Consultations __________________________________ 112 B.1. Detail of Officials Participated in Field Surveys __________________________________________ 112 B.2. List of Officials Contacted during survey _______________________________________________ 112 B.3. Contact Detail of Board of Revenue ___________________________________________________ 113 B.4. Meeting with Consultants Regarding Program Tendering Documents for Ghotki Feeder Canal _____ 114 B.5. Grass root stakeholders Consultations _________________________________________________ 116 B.6. Names of Sample Surveyed Villages __________________________________________________ 117 Appendix C. Survey Questionnaires and Data Collection Tools ________________________________________ 118 Appendix D. Details of Project Affected Persons and Assets __________________________________________ 134 D.1. Details of Affected Structures of Ghotki Feeder Canal and Estimated Compensation Cost _________ 135 D.2. Details of Low Income Allowance Entitlements __________________________________________ 142 D.3. Details of Livelihood Allowance ______________________________________________________ 146 D.4. Household monthly expenditure ______________________________________________________ 146 D.5. Long Distance Transport Allowance ___________________________________________________ 153 Appendix E. Details of Affected Farmers _________________________________________________________ 154 Appendix F. Grass Root Consultations ___________________________________________________________ 156 Appendix G. Details of Asset Valuation ___________________________________________________________ 161 G.1. Detail of market Rates for Pacca House ________________________________________________ 161 G.2. Detail of market Rates for Semi Pacca House ___________________________________________ 162 G.3. Detail of market Rates for Kacha House _______________________________________________ 163 G.4. Detail of market Rates for Semi Pacca Boundary Wall_____________________________________ 164 G.5. Detail of market Rates for Kacha Boundary Wall _________________________________________ 165 G.6. Detail of market Rates for Pacca Boundary Wall _________________________________________ 166 G.7. Detail of market Rates for Kacha Hut __________________________________________________

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    227 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us