Story of the Watershed: Past, Present and Future

Story of the Watershed: Past, Present and Future

Coquitlam River Watershed Strategy – Phase I Report The Story of the Coquitlam River Watershed: Past, Present and Future Presented by: Alan Kenney – Golder Associates Ltd. February 25, 2009 Background ¾ Phase I report was prepared by Jahlie Houghton – JR Environmental (April 2008) ¾ Report was updated by the Coquitlam River Watershed Working Group (October 2008) ¾ Golder hired to assist with Phase II – Stakeholder Engagement (January 2009) ¾ Golder is presenting JR Environmental’s Phase I report Phase I Objectives ¾ Research and summarize key documents relevant to the history and health of the watershed; ¾ Develop an accountability framework to define the many stakeholders and their various legislations and mandates; ¾ Identify watershed interests and establish initial dialogue with: ¾ Government agencies ¾ Stewardship groups ¾ Industry Coquitlam Watershed – First Nations ¾Last Ice Age – 9,000 Years Ago ¾Kwikwetlem First Nation traces its ancestry back to this time ¾Kwikwetlem means “red fish up the river” ¾Kwikwetlem First Nation derives its history, culture and heritage from the watershed’s salmon resource ¾Kwikwetlem First Nation continues to play a leading role in the management of the watershed. Earliest known picture of salmon jumping in Coquitlam River Coquitlam Watershed – Pre 1914 ¾ CPR entered watershed in 1884 ¾ Salmon fishing and canneries expanded along Fraser ¾ Logging industry clears forests for settlement Coquitlam Watershed – Pre 1914 ¾ Coquitlam Dam Construction (1904) with fishway ¾ Coquitlam/Buntzen Lake Diversion (1905) ¾ Coquitlam Dam Construction (1914) ¾ Led to loss of sea-run sockeye population with kokanee confined in Coquitlam reservoir ¾ Also cut-off habitat for coho, chinook, chum and steelhead Coquitlam Watershed – Pre 1914 Buntzen Reservoir Coquitlam Reservoir Generating Station on Indian Arm 1914 Dam Construction Clay Model – Diversion Project Flooding Events ¾ Flooding events occurred in ¾ 1892 ¾ 1921 (1:200 year event) ¾ 1955 ¾ 1961 ¾ Dykes were constructed to protect the City and agricultural land (Colony Farm) Mining and Dredging Sediment Impacts ¾Late 1950’s – Start of gravel mining operations ¾In-river dredging was a common practice up to 1965 ¾Resulted in destruction of pink and chum salmon spawning beds Gravel Pit Operations Other Sediment Impacts ¾Or Creek watershed poorly logged in 1970’s ¾Exposed its clay banks which are now a significant sediment source ¾Natural landslides ¾Caving erosion due to groundwater seepage Logging ¾ Logging has occurred in the watershed since the late 1800’s ¾ 1972 – 1993 approx. 1400 ha logged, including 82 cutblocks and 100 km of logging roads ¾ Result: Water quality / slope instability issues Urban Development ¾Coquitlam’s population is currently over 114,000 ¾Port Coquitlam is over 57,000 ¾A significant component of the Port Coquitlam’s Population 1961 - 2021 watershed’s drainage is now carried by the storm drain system ¾Erosion and riparian impacts of urban development are also an issue Community Stewardship ¾ Currently at least 15+ groups ¾ Majority formed in the 1990s ¾ Mitigate impacts and restore ecosystem through: ¾ Awareness and education ¾ Advocacy and involvement in watershed planning process ¾ Salmon enhancement ¾ Habitat restoration ¾ Surveillance activities Local Stewardship Groups ¾ Burke Mountain Naturalists ¾ Como Watershed Group ¾ Colony Farm Park Association ¾ Coquitlam River Watershed Society ¾ Coquitlam Riverwatch ¾ Friends of Mundy Park Heritage Society ¾ Institute of Urban Ecology ¾ Hoy Scott Watershed Society ¾ Maple Creek Streamkeepers ¾ North Fraser Salmon Assistance Project ¾ Port Coquitlam and District Hunting and Fishing Club ¾ River Springs Streamkeepers ¾ Rivershed Society of BC ¾ Riverview Horticultural Centre Society ¾ Watershed Watch Salmon Society Reports and Initiatives - 1978-present ¾ Phase I report describes over 25 reports initiatives undertaken in the watershed since 1978 ¾ Provides documentation and references of these various initiatives and the groups / agencies involved. ¾ Demonstrates stakeholders working collaboratively together on a wide variety of watershed initiatives. Stakeholder Initiatives ¾ BC Hydro Water Use Plan ¾ Initaited in 2000 / Completed in 2003 / Adopted in 2005 ¾ Goal: To recommend a preferred operating strategy by using a public participatory process ¾ Over 60 Consultative Committee meetings ¾ Engaged Kwikwetlem First Nation, all levels govt. and stewardship community ¾ Achieved consensus ¾ $2.5 M for 12 year Monitoring Program ¾ BCRP invested $1.03 M over 1999-2009 Stakeholder Initiatives ¾ Coquitlam River Aggregate Committee ¾ Formed by City of Coquitlam Council to address sediment issues in 1999 ¾ Industry; federal, provincial, regional and municipal governments; BC Hydro, CRWS ¾ Mandate to address impacts related to aggregate mining ¾ Issues / challenges identified include: • Reduction of overburden by-product • Improvement of sediment run-off controls • Offsite strategies • Testing and monitoring of sedimentation • Rehabilitation Multidisciplinary Stakeholder Initiatives ¾ Kwikwetlem Salmon Restoration Program ¾ Initiated by BC Hydro in 2003 ¾ Kwikwetlem First Nation, BC Hydro, all levels government and stewardship groups ¾ Mandate to assess and implement sockeye reintroduction ¾ Low water level allowed release of kokanee juveniles to river in 2005 and 2006. ¾ In 2007, 2 female sockeye returned / both died ¾ In 2008, 13 sockeye returned and 2 died Phase I - Issues, Concerns and Recommendations COMMUNICATION ¾Need for participation at all levels of government ¾First Nations continued involvement ¾Workshop needed to communicate Phase I Report ¾Communication Strategy needed between all stakeholders and the community ¾Define a vision for this urban river Phase I - Issues, Concerns and Recommendations (cont’) ENVIRONMENT ¾ Mitigation of sedimentation/erosion in Or Creek ¾ Installation of run-off interceptor ditch above gravel pit operations ¾ Vegetation salvage in development zones ¾ Re-evaluation of steelhead hatchery program Phase I - Issues, Concerns and Recommendations (cont’) ENVIRONMENT ¾ Long-term water quality monitoring – point source identification ¾ Study on current environmental stressors in watershed ¾ Fish ladder installation at the dam Phase I - Issues, Concerns and Recommendations (cont’) Perception of lack of legislation and enforcement regarding: ¾ Monitoring and enhancement requirements ¾ Environmental concerns for agencies governing utilities ¾ Municipal environmental management ¾ Provincial environmental management ¾ Water quality and flow Governance Accountability and Management Issues Frameworks ¾Governance Accountability Framework ¾Provides graphical overview of various government agencies and their legislative authority ¾Management Issues Framework ¾Identifies government agencies, legislation and watershed management issue responsibility ¾14 government agencies ¾36 pieces of legislation Phase I - Conclusions Lessons learned: ¾ Importance of communication between stakeholders and community ¾ Consultation with the community and stakeholders in decision-making process ¾ Continuum of funding needed ¾ Need for a governance structure ¾ Involvement of all levels of government and stakeholders QUESTIONS.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    28 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us