Drainage Master Plan for NCT of Delhi

Drainage Master Plan for NCT of Delhi

Drainage Master Plan for NCT of Delhi Final Report July 2018 Prepared for: Department of Irrigation & Flood Control Government of Delhi DEPARTMENT OF CIVIL ENGINEERING Indian Institute of Technology Delhi Hauz Khas, New Delhi Contributors to the Study • IIT Delhi Faculty Prof. A. K. Gosain Prof. R. Khosa Prof. B. R. Chahar Prof. D. R. Kaushal Dr. C. T. Dhanya • IIT Delhi Research Scholars Mr. Satish Kumar Ms. Anupriya Goyal Ms. Harsha Yadav and others • INRM Staff Dr. Sandhya Rao Ms. Puja Singh Ms. Anamika Arora • GSDL Staff • People from various departments of Delhi I&FC, IMD, PWD, DDA, All Municipalities, Cantonment Board, DJB, DSIIDC, DIAL, etc. Table of Contents TABLE OF CONTENTS ........................................................................................................................................................ I LIST OF FIGURES .............................................................................................................................................................. V LIST OF TABLES ............................................................................................................................................................. VIII ABBREVIATIONS .............................................................................................................................. X EXECUTIVE SUMMARY .................................................................................................................. XII 1. INTRODUCTION ....................................................................................................................... 1 1.1 SCOPE OF THE STUDY .............................................................................................................. 1 1.2 DRAINAGE SYSTEM IN THE NCT REGION ................................................................................. 1 1.3 INSTITUTIONAL JURISDICTIONS .............................................................................................. 5 1.4 THE SCALE OF INSTITUTIONAL MONITORING OF FLOOD EVENTS ........................................... 6 1.5 INITIATIVES BY IIT DELHI AND SOME OBSERVATIONS FROM FIELD VISITS .............................. 6 2. DRAINAGE MASTER PLAN METHODOLOGY ............................................................................ 8 2.1 METHODOLOGY OVERVIEW .................................................................................................... 8 2.2 MODELS DEPLOYED ............................................................................................................... 10 2.2.1 SWAT – HYDROLOGICAL MODEL ..................................................................................................................... 10 2.2.2 SWMM/PCSWMM – URBAN STORM WATER MANAGEMENT MODEL ..................................................... 10 2.3 DATA USED ............................................................................................................................ 11 2.4 HANDLING OF STORM DRAIN DATA ...................................................................................... 13 2.5. DATA LIMITATIONS AND ASSUMPTIONS ............................................................................... 15 2.6. SIMULATION SCENARIOS GENERATED .................................................................................. 19 2.6.1. SIMULATION WITH THE DATA PROVIDED BY THE DEPARTMENTS ...................................................................... 19 2.6.2. SIMULATION WITH CHANGED/CORRECTED CROSS SECTIONS OF THE DRAINS .................................................. 19 2.6.3. SIMULATION AFTER INCORPORATING THE EXISTING WATER BODIES ................................................................ 20 2.6.4. SIMULATION AFTER DIVERTING STORM WATER TO ADDITIONAL STORAGES/ RECHARGE AREAS ..................... 20 2.6.5. TOWARDS NO FLOODING FOR 2 YEAR RETURN PERIOD STORM ........................................................................ 20 3. BASIN-WISE REPORT ............................................................................................................. 23 3.1. TRANS YAMUNA BASIN ......................................................................................................... 23 3.1.1. INTRODUCTION ................................................................................................................................................... 23 3.1.1.1. Basin characteristics .......................................................................................................... 23 3.1.1.2. Population statistics .......................................................................................................... 24 3.1.1.3. Topography and land use .................................................................................................. 26 3.1.1.4. Rainfall and groundwater scenario ................................................................................... 28 3.1.2. DETAILS OF EXISTING DRAINAGE NETWORK AS CAPTURED ............................................................................... 30 3.1.3. MAJOR DRAINAGE PROBLEMS IN THE REGION .................................................................................................. 31 3.1.4. SIMULATION SCENARIOS .................................................................................................................................... 34 i DELHI DRAINAGE MASTER PLAN | IIT Delhi F I N A L R E P O R T 3.1.4.1. Scenario 1 – Simulation with data provided by the departments .................................... 34 3.1.4.2. Scenario 2 – Simulation with changes made to cross-sections ........................................ 34 3.1.4.3. Scenario 3 – Simulation towards rejuvenation of water bodies ....................................... 39 3.1.4.4. Scenario 4– Simulation with public parks as recharge zones ........................................... 43 3.1.4.5. Scenario 5 - Towards no flooding junction for 2 year return period storm ...................... 47 3.1.4.6. Comparison of Simulations with 2 year and 5 year return period rainfall events ............ 55 3.2. BARAPULLAH BASIN............................................................................................................................................ 58 3.2.1. INTRODUCTION ................................................................................................................................................... 58 3.2.1.1. Basin characteristics .......................................................................................................... 58 3.2.1.2. Population statistics .......................................................................................................... 59 3.2.1.3. Topography and land use .................................................................................................. 60 3.2.2. DETAILS OF EXISTING DRAINAGE NETWORK ....................................................................................................... 62 3.2.3. MAJOR DRAINAGE PROBLEMS IN THE REGION .................................................................................................. 63 3.2.4. DATA LIMITATIONS AND ASSUMPTIONS ............................................................................................................ 65 3.2.5. SIMULATION SCENARIOS .................................................................................................................................... 69 3.2.5.1. Scenario 1 – Simulation with data provided by the departments .................................... 69 3.2.5.2. Scenario 2 – Simulation with changes made to cross-sections ........................................ 70 3.2.5.3. Scenario 3 – Simulation towards rejuvenation of water bodies ....................................... 73 3.2.5.4. Scenario 4 – Simulation with public parks as recharge zones........................................... 76 3.2.5.5. Scenario 5 - Towards no flooding junction for 2 year return period ................................ 80 3.2.5.6. Comparison of Simulations with 2 year and 5 year return period rainfall events ............ 85 3.3. NAJAFGARH BASIN ............................................................................................................................................. 87 3.3.1. INTRODUCTION ................................................................................................................................................... 87 3.3.1.1. Basin characteristics .......................................................................................................... 87 3.3.1.2. Population statistics .......................................................................................................... 88 3.3.1.3. Topography and land use .................................................................................................. 89 3.3.2. DETAILS OF EXISTING DRAINAGE NETWORK ....................................................................................................... 91 3.3.3. MAJOR DRAINAGE PROBLEMS IN THE REGION .................................................................................................. 92 3.3.4. SIMULATION SCENARIOS .................................................................................................................................... 95 3.3.4.1. Scenario 1 – with data provided by the departments ...................................................... 95 3.3.4.2. Scenario 2 – with changes made to cross-sections ..........................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    153 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us