Brenner Base Tunnel & Isarco River Underpass Section

Brenner Base Tunnel & Isarco River Underpass Section

GALLERIE E GRANDI OPERE SOTTERRANEE n. 125 – marzo 2018 Brenner Base Tunnel & Isarco River Underpass Section: several technical and operational solutions Giuseppe LUNARDI Managing Director of Rocksoil S.p.A. Giovanna CAssANI Technical Director of Rocksoil S.p.A. Martino GATTI Head of Technical Department of Rocksoil S.p.A. Luca BELLARDO Geological Department Rocksoil of S.p.A Alberto PALOMBA Project Manager of Isarco River S.c.a.r.l. The Brenner Base Tunnel is part of the TEN-T SCAN-MED corridor and allows for works for the two main tunnels for a total overcoming the natural barrier of the Alpine ranges. The Isarco River Underpass length of roughly 4.3 km, as well as two represents the southernmost construction lot of the Brenner Base Tunnel, links the interconnecting tunnels for a total length Brenner Base Tunnel with the existing Brenner line and the railway station in Fortezza. of 2.3 km that connect with the existing The work is scheduled to be completed in 2023. The paper summarizes design choices railway line. Construction will be extremely made for the specific construction lot which are mainly related to critical logistic issues. complex from a technical point of view: both Moreover, as loose fluvioglacial materials and groundwater layer will be crossed, it will be the main tunnels and the interconnecting necessary to adopt specific ground consolidation procedures including ground freezing tunnels will pass under the Isarco River, the and the jet grouting. The high speed railway of the Brenner Basis Tunnel underpasses A22 motorway, the SS12 motorway and the the Isarco River, near Fortezza, with four 10 m diameter tunnels, two of them as an Verona-Brenner railway line with a minimal interchanging to the existing line, with very shallow cover, ranging between 5 and 8 m leeway (Fig. 1). under the river bed. To minimise environmental impact of the works it was proposed to Before the start of construction, several build these tunnels by conventional method. The excavation will start then from shafts preliminary activities have been carried out on the riverbanks, after ground improvement and soil freezing made all along tunnels on the surface, including the re-routing of profiles. the national road SS12, the construction of two bridges over the Isarco River and the Rio Bianco and the realization of the interconnecting area on the A22, which has 1. Introduction and allows for overcoming the natural bar- been be required to facilitate the transport rier of the Alpine ranges. For this reason, and supply of construction materials for the The Trans-European Transport Network the EU is prioritising this tunnel among its Project (FUOCO et al., 2016). The construc- (TEN-T) aims to develop an integrated mul- infrastructural projects. tion works are performing by the "Isarco" timodal transport network allowing people Under the Brenner Pass, the longest railway Consortium composed by Salini-Impregilo, and goods to move quickly and easily link in the world is being built: the Brenner Strabag Consorzio Integra. across the EU. This is intended to support Base Tunnel (BBT). The Brenner Base Tun- the development of the internal market and nel stretches for about 55 km between reinforce economic and social cohesion. Innsbruck train station and Fortezza train 2. Geographical and geological The Scandinavian-Mediterrean Corridor station. Together with the existing Inns- overview (5) is the longest of the TEN-T Core Net- bruck bypass, the tunnel will reach 64 km work Corridors and is based in part on a and reduce travel time for freight and pas- The project area is located in Val d’Isarco series of former Priority Projects. It links the senger traffic significantly. in the municipality of Fortezza, at an al- major urban centres in Germany and Italy to The “Isarco River Underpass” Section is the titudes varying between 750 and 850 m Scandinavia and the Mediterranean whilst southern segment of the Brenner Base Tun- above sea level. The geological sector is crossing 7 different Member States: Fin- nel, before entering the railway station at the southernmost sector of the BBT and land, Sweden, Denmark, Germany, Austria, Fortezza. It is situated approximately one extends from the Rio Bianco (at the north Italy and Malta. The Brenner Base Tunnel kilometer North of Fortezza, Prà di Sopra, side) to Fortezza (at the south side). The is part of the TEN-T SCAN-MED corridor Bolzano (Italy). The section will include civil corridor of the route is divided into two 33 n. 125 – marzo 2018 G. LUNARDI - G. CASSANI - M. GATTI - L. BEllARDO - A. PALOmbA Fig. 1 – Isarco River Underpass overview map (www.bbt-se.com). Fig. 2 – Isarco River Underpass Geological Profil. 34 n. 125 – marzo 2018 BRENNER BASE TUNNEL & ISARCO RIVER UNDERPASS SECtiON: SEVERAL TECHNICAL AND OPERAtiONAL SOLUtiONS Fig. 3 – Geological Profile: detail of Isarco River Underpass. Tab. 1 – Rock Mass geotechnical parameter. Quarzifera di Bressanone. The Bressanone Granite is the most widespread rock in the Rock Type σcm γ ϕ c’ ES [MN/m2] [kN/m3] [ ° ] [kN/m2] [MN/m] project area. The Isarco River Underpass passes Granite: Granodiorite 54 GA-BG-01 26,5 62 190 0 15000 large - medium fracturing (39-69) through the alluvial deposit of the valley Granodiorite 22 bottom and through the dejection conoids GA-BG-02 26,5 58 1000 5000 large - medium fracturing (12-22) of the tributary rivers. These loose depos- 1,4 its, heterogeneous both in composition GA-BG-03 Brixen Granite 26,7 30 2600 500 (0,8-2,2) and in granulometry, consist of gravels GB-G-GA 6 Brixen Granite 44 26,7 64 18 0 0 19000 and rounded sand, with frequent boul- Brixen Granite ders and thick layers of sandy silt (Figure GB-G-GA 7 7, 4 26,7 52 300 170 0 Rio Bianco fault 2 & Figure 3). The flanks of the valley are covered by coarse particle size material, Tab. 2 – Soil Mass geotechnical parameter. composed by slope debris, alluvial sedi- ments and weather material. The most vo- Soil Type γ ϕ c’ ES [kN/m3] [ ° ] [kN/m2] [MN/m] luminous rock fragments, up to 1 m, are made of granite. Except for the silty levels, A - Debris Flow 21,0 30 10 60 which in any case constitute a minority, B - Slope Debris 21,0 35 0 60 the loose deposits are characterized by C - Alluvional Sediments 20,5 36 2 60 friction angle value varying between 30o o D - Weathered Material 21,0 30 0 30 and 40 . Table 1 and Table 2 summarize respectively rock mass and ground mass geotechnical parameters. sectors by the River Isarco with NW-SE di- buildings are distributed in the project area A large survey campaign has been car- rection. The valleys of Rio Bianco, Rio Val- too. ried out during each design stage. Final laga and Rio Riol depart transversally from From the geological point of view, this con- design required additional in situ and the direction of the main valley. The most struction lot is ascribing to the Southern laboratory tests to check stratigraphy, prominent relief within the project area is Alps sector. The railway alignment enters ground’s strength and deformability pa- Mount Riol (1547 m), with its steep side into the South-Alpine crystalline basement, rameters. south and SE oriented known as “Hohe on the southern side of the Periadriatico The water table flows along the same di- Wand”. Line (ZURLO et al., 2013), consisting of rection of the Isarco River while remaining The main residential areas in the Isarco Val- the Granite-Granodioritic Pluton of Bres- independent from it. The water table is ley between Fortezza and Rio Bianco are the sanone, Gabbro del “Monte del Bersaglio” bounded at the sides and at the base of villages of Pra di Sopra and Fortezza itself. and the metamorphosis of encasing (Fil- the rock surface by the Bressanone gran- In addition to these villages some farms and ladi, micascisti granitiferi) of the Fillade ite. Hydrogeological studies were carried 35 n. 125 – marzo 2018 G. LUNARDI - G. CASSANI - M. GATTI - L. BEllARDO - A. PALOmbA Fig. 4 – Isarco River Underpass Lot. Fig. 5 – today faces’ positions. out in the valley bottom sector, near future tunnels, with the aim of assessing the char- acteristics of the aquifer and in particular determining the maximum permeability and speed values of the water table, which are of considerable importance for the success of the consolidation intervention preparatory for the tunnel excavation. Alluvial depos- its have a maximum hydraulic conductivity equal to 1.9 x 10-3 m / s, with a maximum speed, estimated by tracer tests, equal to approximately 14-16 m / g. 3. Project description and design choices Fig. 5a – Conventional excavation method section type for rock mass - Single track & dual track tunnels. With reference to Figure 4, the Isarco Ri- ver Lot could be subdivided in three main dejection conoids of the tributary rivers, starting from the shafts located near the sectors: 1) the tunnels north of the Isarco are present. Isarco’s banks as the last sector of the Lot. river, mainly interested by Granite of Bres- The tunnels in rock will be excavated full- The southern tunnels in rock are single and sanone (GB-G-GA6 and 7) with the spe- face, according to ADECO-RS Approach double track tunnels (double track tunnels cial passage through the Rio Bianco fault; (LUNARDI P., 2015) and by conventional from chainage 55+485 towards south) and 2) the tunnels south of the Isarco River, excavation with D&B, with several confine- they are being excavated by a mid-access, interested by the Brixen Granite and gra- ment actions, such as steel bolts and ribs, named NA4, which gives the possibility to nodiorite (BG-01, 02) and 03) the Isarco shotcrete and, locally in fault zones, fore- work from four face, two toward south por- river valley, where soft soil, mainly allu- polings (Fig.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us