CH-UK-RF-Sgridhr-Heads of Valleys Abergevenny-Rev 00 Dec 18

CH-UK-RF-Sgridhr-Heads of Valleys Abergevenny-Rev 00 Dec 18

CASE HISTORY UK / CH /RF/ Rev: 00, Dec 2018 HEADS OF THE VALLEYS, A465 ABERGAVENNY, SOUTH WALES ROCKFALL DRAPERY SYSTEM Product: Steelgrid HR DT mesh system Problem The A465 road is a major infrastructure project connecting west Wales with the upper ends of the Welsh valleys and then to the English midlands. It is one of the key corridors and international gateways for the south Wales economy. It connects the M4 at Neath to Abergavenny and Hereford. The existing A465 was built in the 1960s and is a single three- lane carriageway with two lanes in the uphill direction and one in the downhill direction. A regional traffic study in 1990 identified the need to improve this road. The width of the road restricts traffic flow and opportunities for safe overtaking. In many areas there is poor visibility. Accidents on this stretch are concentrated around junctions Steel grid HR system secured to the rock face with plates and areas with poor visibility. The Welsh government has a long programme of work to address shortcomings and make the road suitable to help sustain industry and tourism in south and west Wales. These improvements to the A465 are critical to the social and economic regeneration of the Heads of the Valleys area. This project will improve access to key services, jobs and markets supporting inward investment to areas such as the Ebbw Vale enterprise zone. Solution Slope stabilisation was an important element of the scheme, and both CAN Geotechnical and BAM Ritchies have been working closely with the Costain team on a number of key slopes. The main designers of the road improvement, Atkins and CH2M Hill, have choosen Steelgrid HR for its high punching and containment properties. Macmat-R and MacMat were also used as an erosion control measure across the slope. Steelgrid HR draped over the rock face Client: WELSH GOVERNAMENT Main contractor: COSTAIN Designer: ATKINS GLOBAL/CH2M HILL Products used: STEELGRID HR 30 and 100 (total 2,800sqm) MACMAT-R R1 6822G0 (total 2,000sqm) MACMAT (total 28,300sqm) Date of construction Neat mesh installation. Bottom of the rolls yet to be secured. 2016/2017/2018 View of the slope with the Steelgrid HR 100 General view where Steelgrid HR 100 was used Steelgrid HR 30 - installation completed enforce Copyright. willrights Maccaferri © Maccaferri All reserved. Ltd. Maccaferri Ltd: Specialist areas: Building 168, Harwell Campus, Didcot, OX11 0QT Sales: E: [email protected] T: (+44) 1865 770555 Technical: E: [email protected] Rep of Ireland: Construction: E: [email protected] T: (+353) 18851662 www.geostrong.net www.maccaferri.com/uk .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us