M/S. Athani Sugars Limited at Vishnuanna Nagar, Post - Navalihal, Tal

M/S. Athani Sugars Limited at Vishnuanna Nagar, Post - Navalihal, Tal

M/s. Athani Sugars Limited At Vishnuanna Nagar, Post - Navalihal, Tal. Athani, Dist Belgaum Karnatka-591234 REVISED ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR Sugar plant Expansion from 4500 to 12000 TCD, Distillery plant Expansion from 60 to 90 KLPD & Cogeneration plant Expansion from 24 to 54 MW At Vishnuanna Nagar, Post- Navalihal, Tal. Athani, District Belgaum, Karnataka AUGUST, 2015 Prepared by: MIN MEC CONSULTANCY PVT. LTD. A-121, Paryavaran Complex, IGNOU Road, New Delhi – 110 030 Ph : 29534777, 29532236, 29535891 ; Fax: 091-11-29532568 An ISO 9001:2008 Estb. 1983 Email :[email protected]; Web site : www.minmec.co.in approved company M/s. Athani Sugars Limited At Vishnuanna Nagar, Post - Navalihal, Tal. Athani, Dist Belgaum Karnatka-591234 REVISED ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR Sugar plant Expansion from 4500 to 12000 TCD, Distillery plant Expansion from 60 to 90 KLPD & Cogeneration plant Expansion from 24 to 54 MW At Vishnuanna Nagar, Post- Navalihal, Tal. Athani, District Belgaum, Karnataka ISSUE 1 REV. 0 AUGUST, 2015 (Post PH) Prepared by: MIN MEC CONSULTANCY PVT. LTD. A-121, Paryavaran Complex, IGNOU Road, New Delhi – 110 030 Ph : 29534777, 29532236, 29535891 ; Fax: 091-11-29532568 An ISO 9001:2008 Estb. 1983 Email :[email protected]; Web site : www.minmec.co.in approved company Athani Sugars Limited Athani Sugars Limited CONTENTS CHAPTER 3 : DESCRIPTION OF THE ENVIRONMENT Sl. Description Page 3.1 General 3-1 No. No. 3.2 Topography & drainage 3-1 CHAPTER 1 : INTRODUCTION 3.3 Climate 3-6 1.1 Purpose of the report 1-1 3.4 Micro meteorology 3-12 1.2 Identification of the project 1-2 3.5 Air quality 3-14 1.3 Project proponent 1-3 3.6 Water resources 3-18 1.4 Brief description of the project 1-3 3.7 Noise level 3-25 1.5 Scope of study-details of regulatory scoping carried out as per 1-8 terms of reference 3.8 Traffic density 3-26 1.6 Status of litigations 1-12 3.9 Land use 3-26 1.7 Regulatory requirements 1-12 3.10 Soil quality 3-31 1.8 Compliance of terms of reference (TOR) 1-12 3.11 Ecology 3-34 CHAPTER 2 : PROJECT DETAILS 3.12 Socio-economic conditions 3-39 2.1 Products and capacity 2-1 3.13 Seismicity 3-44 2.2 Plant layout 2-1 3.14 Industries around the project area 3-44 2.3 Process description 2-4 3.15 Places of tourist/ religious/ historical interest 3-45 2.4 Co-Gen power plant 2-16 CHAPTER 4 : ANTICIPATED ENVIRONMENTAL IMPACTS & 2.5 Distillery plant 2-18 MITIGATION MEASURES 4.1 General aspects 4-1 2.6 Process modifications in alcohol fermentation for better yield 2-27 4.2 Topography and drainage 4-2 2.7 Raw material, power and water 2-29 4.3 Climate 4-3 2.8 Man power 2-35 4.4 Air environment 4-4 2.9 Mass balance of integrated unit 2-35 4.5 Noise environment 4-12 2.10 Site facilities 2-35 4.6 Traffic density 4-15 EIA/EMP for Expansion of Sugar, Distillery & Cogen Plant in Dist. Belgaun, Karnataka i EIA/EMP for Expansion of Sugar, Distillery & Cogen Plant in Dist. Belgaun, Karnataka ii Athani Sugars Limited Athani Sugars Limited 4.7 Water environment 4-16 8.3 CSR provision by ASL 8-3 4.8 Land environment - impact & mitigation 4-27 8.4 Budgetary commitment of CSR 8-5 4.9 Solid waste - impact and management 4-28 CHAPTER 9 : ENVIRONMENTAL COST BENEFIT ANALYSIS 9-1 4.10 Ecology 4-30 CHAPTER 10 : ENVIRONMENTAL MANAGEMENT PLAN 4.11 Socio-economic environment 4-35 10.1 Corporate responsibility for environment protection (CREP) 10-7 guidelines implementation 4.12 Occupational health and safety 4-36 10.2 Corporate environment policy 10-9 4.13 Exposure pathways 4-45 CHAPTER 11 : EXECUTIVE SUMMARY OF EIA/EMP CHAPTER 5 : ANALYSIS OF ALTERNATIVES 11.1 Introduction 11-1 5.1 Site alternatives 5-1 11.2 Project description 11-1 5.2 Technology alternatives 5-1 11.3 Description of the environment 11-2 CHAPTER 6 : ENVIRONMENTAL MONITORING PROGRAM 11.4 Environmental impact assessment and mitigation 11-6 6.1 Introduction 6-1 11.5 Analysis of alternatives 11-10 6.2 Proposed set up 6-1 11.6 Environmental control and monitoring organisation 11-10 6.3 Monitoring schedule and parameters 6-3 11.7 Disaster management plan 11-10 6.4 Budgetary provision for environment management 6-4 11.8 Project benefits 11-10 CHAPTER 7 : ADDITIONAL STUDIES: DISASTER 11.9 Project consultants 11-11 MANAGEMENT PLAN SUMMARY OF PUBLIC CONSULTATION CHAPTER 12 : DISCLOSURE OF CONSULTANTS 12-1 7.1 Risk analysis and disaster management plan 7-1 ENGAGED 7.2 Risk assessment 7-1 7.3 Disaster management plan 7-2 7.4 Summary of the proceeding of public consultation 7-8 CHAPTER 8 : PROJECT BENEFITS 8.1 Employment potential 8-1 8.2 Physical & social infrastructure 8-2 EIA/EMP for Expansion of Sugar, Distillery & Cogen Plant in Dist. Belgaun, Karnataka iii EIA/EMP for Expansion of Sugar, Distillery & Cogen Plant in Dist. Belgaun, Karnataka iv Athani Sugars Limited Athani Sugars Limited LIST OF TABLES 3.7 Procedure for determining various air quality parameters 3-17 Table Particulars Page 3.8 Summary of ambient air quality monitoring results 3-17 No. No. 3 3.9 Standard of ambient air quality (concentrations in μg/m ) 3-18 1.1 Salient features of the project 1-2 3.10 Location of water sampling stations 3-24 1.2 Coordinates of the project 1-4 3.11 Location of noise monitoring stations 3-25 1.3 Standards for wastewater discharges from distilleries 1-12 3.12 Ambient noise levels 3-25 1.4 Point wise compliance to terms of reference 1-13 3.13 Traffic density 3-26 2.1 Proposed land use within project area after expansion 2-1 3.14 Present land use within project area 3-27 2.2 Design parameters of sugar plant 2-4 3.15 Land use details of study area as per (census 2001) 3-27 2.3 Steam balance 2-16 3.16 Land use based on satellite imagery 3-28 2.4 Power balance 2-16 3.17 Soil sampling stations 3-33 2.5 List of equipments for cogen and brief technical 2-17 3.18 Soil test result 3-33 specifications 3.19 List of flora in buffer zone 3-35 2.6 Design parameters of the total ethanol plant 2-18 3.20 List of fauna in the buffer zone 3-38 2.7 Raw material, quantity, source and transportation 2-29 3.21 District & Tehsilwise population (Census 2001) 3-40 2.8 Characteristics of captive molasses 2-29 3.22 Demographic details of the study area (as per census 2011) 3-40 2.9 Existing water balance 2-30 3.23 Employment pattern within the study area (Census 2011) 3-43 2.10 Proposed water balance 2-33 4.1 Stack details of existing plant 4-6 3.1 Streams/ water bodies present in 10 km radius 3-6 4.2 Stack details of proposed plant 4-6 3.2 Monthly average maximum and minimum temperature at 3-7 IMD station, Belgaum (1961-90) 4.3 Maximum ground level concentration with control measures 4-10 3.3 Monthly average rainfall (mm) at IMD station, Belgaum 3-8 (μg/m3) (1961-1990) 4.4 Cumulative impacts on air quality 4-10 3.4 Average monthly relative humidity at IMD station, Belgaum 3-9 (1961-1990) 4.5 Recommended measures for control of fugitive emissions 4-11 3.5 Summary of monitored micrometeorological data (March to 3-12 during construction May 2014) 4.6 Noise attenuation with distance on flat bare ground without 4-14 3.6 Location of air sampling stations 3-14 and with green belt EIA/EMP for Expansion of Sugar, Distillery & Cogen Plant in Dist. Belgaun, Karnataka v EIA/EMP for Expansion of Sugar, Distillery & Cogen Plant in Dist. Belgaun, Karnataka vi Athani Sugars Limited Athani Sugars Limited 4.7 Proposed land use within project area after expansion 4-28 LIST OF FIGURES 4.8 Solid waste - impact and management 4-29 Figure Particulars Page No. No. 4.9 Exposure pathway 4-45 1.1 Location plan 1-5 6.1 Monitoring schedule and parameters 6-4 2.1 Plant layout plan 2-2 6.2 Estimated capital investment on environmental management 6-5 2.2 Photographs of plant area 2-3 7.1 Issues raised during public hearing and replies by project 7-8 2.3 Flow sheet for sugar plant 2-6 proponent 10.1 Environment management measures 10-1 2.4 Flow sheet for power co-generation 2-7 10.2 Compliance to crep guidelines for sugar industry 10-7 2.5 Flow diagram of rectified spirit plant 2-8 10.3 Compliance to crep guidelines for cogen power plant 10-7 2.6 Process flow for steam generating unit 2-17 10.4 Compliance to crep guidelines for distilleries 10-8 2.7 Process flow for power generation & distribution 2-18 2.8 Continuous cascade fermentation system 2-22 2.9 Water balance diagram for existing sugar 4500 TCD + cogen 2-31 plant 24 MW season 2.10 Water balance diagram for existing distillery 60 KLPD season 2-32 2.11 Water balance diagram for proposed sugar 12000 TCD + 2-33 cogen plant 54 MW season 2.12 Water balance diagram for proposed sugar 12000 TCD + 2-34 Cogen Plant 54 MW off season 2.13 Water balance diagram for proposed distillery 90 KLPD 2-34 season 3.1 Project & its vicinity on topography and drainage map 3-3 3.2 Map of buffer zone (10 km radius around the project) 3-4 3.3 Digital elevation map of study area 3-5 3.4 Monthly avg.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    140 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us