Enauta Eyes Atlanta 2 Page 10

Enauta Eyes Atlanta 2 Page 10

OFFICIAL SHOW DAILY PRODUCED BY WEDNESDAY 30 OCTOBER 2019 / QUARTA-FEIRA 30 OUTUBRO 2019 upstreamonline.com Conference Programme Programa da conferência Page 4 Show celebrates as Brazil sector enters new cycle OTC Brasil começa com setor de óleo e gás em novo ciclo de expansão Page 5 The Petrojarl I FPSO is on NEWS location at Atlanta for NOTÍCIAS Enauta Photo: ENAUTA ToR sale to lead to $40bn capex Mega leilão pode gerar $40 bi em investimentos Page 3 Petrobras eyes December for Farfan well test start Petrobras mira TLD de Farfan para dezembro Page 6 Oil spills no threat to pre-salt rounds Manchas de óleo não vão afetar rodadas Page 7 Brazil oil sector looking to strengthen its recovery Setor de petróleo busca fortalecer recuperação Page 8&9 Equinor to cut CO2 emissions at Peregrino Equinor reduz emissões de CO2 em Peregrino Enauta eyes Atlanta 2 Page 10 Get up to speed with the Enauta prepara licitações para Atlanta latest news from the world of oil and gas. Visit us at Page 2 Booth 117 or log on to www.upstreamonline.com TRUSTED IN EXTREME CONDITIONS Pushing steel solutions to new limits 2 Show Daily, Wednesday 30 October 2019 Quarta-Feira 30 Outubro 2019 FIELD DEVELOPMENT On call: the Petrojarl I FPSO is working at the Atlanta heavy oil field for Enauta Photo: ENAUTA Enauta steps up Atlanta 2 drive Brazilian independent looks to tender work later this year on second development phase at heavy oil field Enauta prepara licitações ANAMARIA DEDULEASA para Atlanta Rio de Janeiro A Enauta pretende lançar licitações ainda este ano para o desenvolvimento da segunda fase de seu campo de óleo pesado de Atlanta na bacia de Santos, onde a produção da primeira fase começou recentemente a exceder as expectativas. BRAZILIAN independent Enauta expected that one tender will be the Petrojarl 1 FPSO. Each well A produção da segunda fase de desenvolvimento deverá atingir entre 50.000 e 70.000 barris is aiming to launch tenders later launched for the FPSO contract was originally expected to pro- de óleo por dia, começando em meados de 2022 e durando 20 anos, disse o gerente de projetos this year for the second phase and a second one for the SURF, duce close to 10,000 bpd of oil, but da Enauta, Roberto Goulart. development of its Atlanta heavy subsea work and drilling contract, pump problems led to initial pro- Para atingir sua meta, a operadora pretende lançar licitações para o projeto até o final do ano. oil field in the Santos basin, where likely by the end of the year, he duction challenges. “A licitação está prevista para ser lançada em breve para o FPSO, o trabalho submarino, a first-phase production hasadded. The issues have been since perfuração e o SURF (umbilicais submarinos, risers e linhas de fluxo)”, disse Goulart. Espera-se recently begun to exceed expecta- Enauta, formerly Queiroz Gal- resolved, Enauta reservoir engi- que seja lançada uma licitação para o contrato do FPSO e uma segunda para o contrato SURF, trabalho submarino e perfuração, provavelmente até o final do ano, acrescentou. tions. vao E&P, is using the Petrojarl I neer Marcello Marsili said during A Enauta, anteriormente conhecida como Queiroz Galvao E&P, está usando o FPSO Petrojarl I Production from the second floating production, storage and the presentation. para a fase inicial de desenvolvimento do campo, mas tem como objetivo o uso de uma unidade phase development is expected to offloading vessel for the field’s -ini “After a drilling campaign early maior para a segunda fase do projeto. reach between 50,000 and 70,000 tial development phase, but is tar- this year, production jumped from A produção da primeira fase em Atlanta começou recentemente a exceder as expectativas barrels per day, starting in mid- geting the use of a larger produc- 12,000 barrels per day to 20,000 depois que os problemas de bombas centrífugas que retinham a produção quando o campo 2022 and running for 20 years, tion floater for the second phase bpd, and after we finished the começou a produzir foram resolvidos, de acordo com funcionários da Enauta na OTC Brasil 2019. Enauta project manager Roberto project. workover on the third well, pro- Até o momento, três poços foram perfurados em Atlanta e conectados ao FPSO Petrojarl I. Goulart said. Production from the first devel- duction increased to 30,000 bpd, Era esperado que cada poço produzisse perto de 10.000 bpd, mas os problemas das bombas To meet its target, the operator opment phase at Atlanta has as productivity increased,” Marsili levaram a desafios iniciais de produção. Os problemas já foram resolvidos, disse Marcello Marsili, engenheiro de reservatórios da aims to launch tenders for the pro- recently begun to exceed expecta- said. Enauta, durante a apresentação. ject facilities by the end of the tions after pump issues that held “The early production system “Depois de uma campanha de perfuração no início deste ano, a produção saltou de 12.000 year. back output when the field ini- has shown that the concept cho- bpd para 20.000 bpd e, após terminarmos a obra no terceiro poço, a produção aumentou para “The tender is scheduled to start tially started up were resolved, sen for the area has been the cor- 30.000 bpd, com o aumento da produtividade”, disse Marsili. soon for the FPSO, the subsea according to officials from Enauta rect one and should be used in the “O sistema de produção antecipado mostrou que o conceito escolhido para a área foi work, the drilling and the SURF at OTC Brasil 2019. definitive system (the second o correto e deve ser usado no sistema definitivo (o segundo estágio de desenvolvimento)”, (subsea umbilicals, risers and So far, three wells have been stage development),” Marsili acrescentou Marsili. flowlines),” Goulart said. It is drilled at Atlanta and tied back to added. The official OTC Brasil 2019 show daily is published by Upstream, NHST Global Publications, Christian Krohgs gate 16, PO Box 1182, Sentrum, N-0107 Oslo and printed by WalPrint Gráfica e Editora, Brazil. This edition was printed on 29 October 2019. © All articles appearing in the Upstream OTC Brasil 2019 show daily are protected by copyright. Any unauthorised reproduction is strictly prohibited. Quarta-Feira 30 Outubro 2019 Show Daily, Wednesday 30 October 2019 3 BRAZIL ToR sale to lead to $40bn capex IHS Markit expects massive capital expenditure demands over next 20 years following sell off GARETH CHETWYND Rio de Janeiro THE looming sell-off of produc- plus” auction will take place on 6 tion-sharing rights on areas cur- November and will be followed, rently covered by a transfer of one day later, by Brazil’s sixth rights (ToR) agreement will gener- licensing round for new produc- ate capital expenditure demands tion-sharing contracts on offer in running to more than $40 billion areas sometimes described as over the next 20 years, according offering little or no exploration to a report on Brazil by energy sec- risk. tor consultant IHS Markit. The sixth pre-salt round will The report, published on Tues- feature the Aram, Bumerangue, day, estimates that the offer of oil Cruzeiro do Sul, North of and gas resources deemed “sur- Brava and Southwest of Sagitario plus” to the production rights areas. already enjoyed by Petrobras will Together these areas are esti- amount to about 7 billion barrels mated to hold unrisked volumes of of oil equivalent. nearly 40 billion barrels of oil in The auction of production rights place. Major asset: the P-74 FPSO at the Buzios field Photo: PETROBRAS covers the Buzios field — which is already under full-scale develop- ment by Petrobras — and also Atapu, Sepia and Itapu, each of Mega leilão pode gerar $40 bi em investimentos which is in the early stage of O iminente leilão do excedente da cessão onerosa irá gerar de 7 bilhões de barris de óleo equivalente. realizado em 6 de novembro que será seguido, um dia depois, development. demandas de investimento de capital que ultrapassarão US$ O leilão abrange o campo de Búzios - que já está em pela sexta rodada do pré-sal. 40 bilhões nos próximos 20 anos, de acordo com um relatório desenvolvimento em larga escala pela Petrobras - e também A sexta rodada do pré-sal contará com as áreas de Aram, The Brazilian government no Brasil do consultor do setor de energia IHS Markit. Atapu, Sépia e Itapu, cada um dos quais está em estágio inicial Bumerangue, Cruzeiro do Sul, Norte de Brava e Sudoeste de expects to raise up to 105 billion O relatório, publicado na terça-feira, estima que a oferta de desenvolvimento. Sagitário. reais ($26 billion) in signature de recursos de petróleo e gás considerados “excedentes” aos O governo brasileiro espera arrecadar até 105 bilhões de Juntas, estima-se que essas áreas mantenham volumes bonuses from the auction of ToR direitos de produção já gozados pela Petrobras será de cerca reais (US$ 26 bilhões) em bônus de assinatura no leilão a ser não-riscados de quase 40 bilhões de barris de óleo. surplus rights. This pre-salt “sur- 4 Show Daily, Wednesday 30 October 2019 Quarta-Feira 30 Outubro 2019 EVENTS PROGRAMME WEDNESDAY 30 OCTOBER 0730 – 0900 Successful Integration between Operators and Services providers Validates the Production Sharing model and Increases Pre-salt Global Competitiveness Room B5 0930 – 1200 Libra Ultra-Deepwater - Applied Technologies Changing the Game Room B3 Total Cost Reduction in Field Development I Room B4-1 Offshore Drilling - Maximizing Value and Reducing Costs Room B4-2 Drilling and Completion Fluids Room 4 Trends for Pre Salt Metallic Materials Room 5 Topside Innovative Processing & Design for Offshore Deepwater Room

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us