Plumbing-Roughin.Pdf

Plumbing-Roughin.Pdf

THESE INDIVIDUAL STACK VENTS MAY TERMINATE THROUGH ROOF, BY INCREASING TO 3"(MINIMUM) OR, ONE PIPE SIZE LARGER, * (DEFERRING, TO THE GREATER OF THE TWO), WITH THIS LARGER PIPE EXTENDING ABOUT 12" ABOVE THE ROOF LINE OR, THEY MAY FORM A HEADER AND CONNECT BACK TO THE 3" MAIN STACK . THIS CONNECTION CAN BE MADE ANYWHERE BELOW THE ROOF INCREASER, TO A POINT NO LOWER THAN 3" ABOVE THE FLOOD LEVEL RIM, OF THE HIGHEST FIXTURE CONNECTED TO THIS STACK. 3" EXPANSION JOINT 3" STACK TO FLOORS ABOVE, NOTE: SEWAGE SUMPS AND SEWAGE LIFT * * REQUIRED. AND TERMINATING AT ROOF, STATIONS MUST BE VENTED SEPARATELY BY INCREASING TO 4", JUST TO ROOF TERMINATION, INCREASING PRIOR 1 1/2" SUDS BELOW ROOF SHEATING, AND TO PENETRATING ROOF. RELIEF VENT 1 1/2" VENT ABOUT 1 FOOT OF 4" PIPE REQUIRED, TO PROTRUDING THROUGH ROOF. BE TIED BACK TO VENT, 3" ABOVE 1 1/2" STUB OUT WASHER STANDPIPE. PLUMBING 2' P TRAP (SHOWER) FOR BASIN 1 1/2" 2" WASHER ROUGH-IN STANDPIPE 3" MAIN STACK NOTE: ALL horizontal 2" CO EVERY BUILDING MUST HAVE (1 1/2", 2", and 3") AT LEAST ONE, 3" MAIN STACK. piping from trap outlets and stack bases on, to 2" be graded @ 1/4" per ft. 2" 2" 1 1/2" STUB OUT, and, all 4" piping to be FOR LAUNDRY SINK. graded @ 1/8" per ft. TOILET FLANGE 4 X 3" REDUCING BUSHING See detail below. 2' WYE 4" CLEAN OUT (A CLEAN OUT IS REQUIRED, AT THE BASE OF EVERY STACK) 2" 3" 3 X 2" WYE 2 @ 4" 45 DEGREE ELBOWS (ALWAYS USE TWO 45 DEGREE BENDS AT THE BASE OF STACKS) 2" 45 DEGREE ELBOW FLOOR DRAIN 4" MAIN BRANCH 3 X 2" WYE NECESSARY IF MORE THAN 2 TOILETS ARE DRAINING THROUGH THIS BRANCH 3" WYE 4" 45 FROM ABOVE. #2. BWV DEGREE (THIS LINE MAY BE 3", IF ONLY A MAXIMUM 3" P TRAP ELBOW 3" BASEMENT OF 2 TOILETS ARE DRAINING FROM ABOVE). BRANCH, Rough-in for toilet using Prep floor, and lay Glue outside of hub of @ 1/4"/FT. NOTE: Sewage Back Flow Protection 4x3" reducing 90 degree tiles, or other finish. a 3" flush bottomed GRADE. elbow. toilet flange, to the WHEN CONNECTING TO A MUNICIPAL SEWER, BACK FLOW PROTECTION IS 4" inside of the 4" pipe. 4 X 3" REQUIRED BY: #1. EITHER INSTALLING A MAIN LINE BACK WATER VALVE TO REDUCING THE BUILDING DRAIN, JUST PRIOR TO EXITING THE FOUNDATION, TO PROTECT BUSHING 4" WYE THE WHOLE SYSTEM WITH THE ADDED BONUS OF SERVING AS AN ACCEPTABLE BUILDING DRAIN CLEAN OUT. (SEE LOCATION "#1 MLBWV") 3" 4" BUILDING DRAIN OR: #2. BY INSTALLING A FLAPPER TYPE, BACK WATER VALVE, (ONCE THE THIRD TOILET DRAIN WHICH MUST BE USED ONLY ON THE BASEMENT BRANCH, INTERSECTS WITH OTHERS ON THE AND PROTECTS JUST THE BASEMENT BRANCH . Leave a foot or more Once floors are set, Set toilet using tee HORIZONTAL, THE DRAIN SIZE MUST BE ( SEE LOCATION "#2 BWV" ) of 4" pipe above cut 4' pipe even bolts and wax seal, INCREASED TO 4" @ 1/8'/FT. GRADE). #1. MLBWV (BUILDING DRAIN CLEAN OUT REQUIRED). expected concrete with finished floor. do not over tighten. Best Practice: Use back flow protection on private finished level. sewage systems as well. RMS 2012.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us