A4 Bristol to East Keynsham Corridor Study - Option Assessment Report

A4 Bristol to East Keynsham Corridor Study - Option Assessment Report

A4 Bristol to East Keynsham Corridor Study - Option Assessment Report Prepared for West of England Combined Authority May 2018 1 The Square Temple Quay Bristol BS1 6DG Document history A4 Bristol to East Keynsham Corridor Study Option Assessment Report This document has been issued and amended as follows: Version Date Description Created by Verified by Approved by 1.0 Jan 2018 Draft for client review VE DJL DJL (chapters 1 – 7) 2.0 March Draft for client review VE DJL DJL 2018 (inc EAST assessment) 3.0 May 2018 FINAL DL DL Contents Section Page Acronyms and Abbreviations ............................................................................................................... i 1 Introduction .......................................................................................................................... 1 1.1 Purpose of this report ......................................................................................................... 1 1.1.1 Description of the Study ........................................................................................ 1 1.2 Strategic Context ................................................................................................................ 3 There are several important strategic policies that have informed the development of the proposals described in this report. These are identified below. ..................... 3 1.2.1 National Planning Policy Framework ..................................................................... 3 1.2.2 Joint Spatial Plan and Local Plans .......................................................................... 3 1.2.3 Joint Local Transport Plan ...................................................................................... 4 1.2.4 Relationship with Transport Topic Paper .............................................................. 5 1.2.5 Approach to Options Assessment Reports ............................................................ 5 1.2.6 Structure of this report .......................................................................................... 5 2 Understanding the Current Situation ...................................................................................... 7 2.1 Description of the Study Area ............................................................................................. 7 2.1.1 General................................................................................................................... 7 2.1.3 Constraints - General ............................................................................................. 8 2.1.4 Physical constraints ............................................................................................... 8 2.1.5 Environmental constraints ..................................................................................... 9 2.1.6 Non-car modes..................................................................................................... 10 2.2 Current Vehicle Demands ................................................................................................. 11 2.3 Existing Transport Problems ............................................................................................. 13 2.3.1 Wider connectivity challenges in Keynsham ....................................................... 14 3 Understanding the Future Transport Situation ...................................................................... 16 3.1 Future Land Uses and Policies .......................................................................................... 16 3.1.1 Committed developments ................................................................................... 16 3.1.2 JSP proposals........................................................................................................ 17 3.2 Future Changes to the Transport System ......................................................................... 19 3.2.1 Keynsham Transport Strategy.............................................................................. 19 3.2.2 West of England Joint Transport Study ............................................................... 21 3.3 Future Traffic Demand ...................................................................................................... 22 3.4 Future Transport Related Problems ................................................................................. 24 3.4.1 Base-line Modelling (2029) .................................................................................. 24 3.4.2 Connectivity from the North Keynsham SDL ....................................................... 24 3.4.3 Requirement for improved connectivity from Broadmead to A4 ....................... 25 4 Need for Intervention, Objectives and Geographical Scope ................................................... 26 4.1 Summary of Current and Future Problems, Impacts and Outcomes ............................... 26 4.2 Scheme Objectives and Outcomes ................................................................................... 26 4.3 Measures for Success ........................................................................................................ 26 5 Generating and Initial Sifting of Options ............................................................................... 28 5.1 Approach to Option Generation ....................................................................................... 28 SECTION PAGE 5.2 Results of Option Generation ........................................................................................... 28 5.3 Approach to Initial Option Sifting ..................................................................................... 30 5.4 Results of Initial Sifting ..................................................................................................... 31 6 Option Development and Assessment .................................................................................. 35 6.2 Option Development ........................................................................................................ 36 6.2.1 Option 2A - ‘Pixash to Avon Mill Lane’ ................................................................ 36 6.2.2 Option 2C - ‘Pixash to new junction on A4175’ ................................................... 38 6.2.3 Option 3A - ‘A4 new junction to Avon Mill Lane’ ................................................ 40 6.2.4 Option 3C - ‘A4 new junction to new junction on A4175’ ................................... 41 6.3 Construction Access .......................................................................................................... 42 6.4 Traffic Modelling ............................................................................................................... 43 6.5 Cost Estimating and Economic Assessment ...................................................................... 46 6.5.1 Cost Estimating .................................................................................................... 46 6.5.2 Economic Assessment .......................................................................................... 47 7 TAG Appraisal Stage 1- Early Assessment and Sifting Tool Tables ........................................... 48 7.1 Introduction ...................................................................................................................... 48 8 Early Assessment and Sifting Tool - Supporting Information .................................................. 53 8.1 Strategic Case .................................................................................................................... 53 8.1.1 Scale of Impact ..................................................................................................... 53 8.1.2 Fit with wider transport and government objectives .......................................... 54 8.1.3 Fit with scheme objectives .................................................................................. 55 8.1.4 Key uncertainties ................................................................................................. 56 8.1.5 Degree of consensus over outcomes ................................................................... 57 8.1.6 Summary of strategic case ................................................................................... 57 8.2 Economic Case .................................................................................................................. 57 8.2.1 Economic growth ................................................................................................. 57 8.2.2 Carbon emissions ................................................................................................. 60 8.2.3 Local environment ............................................................................................... 60 8.2.4 Socio-distributional and regionals impacts .......................................................... 63 8.2.5 Well being ............................................................................................................ 64 8.2.6 Value for Money .................................................................................................. 64 8.2.7 Summary of economic case ................................................................................. 65 8.3 Managerial Case ................................................................................................................ 65 8.3.1 Implementation Timetable .................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    91 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us