Cwprs Monthly Information Bulletin ______

Cwprs Monthly Information Bulletin ______

Government of India Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station Khadakwasla, Pune – 411 024 Issue No.: 04 July 2016 ____________________________________________________________________ CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________ 1. ESTIMATES 1.1 Submitted 03 1.2 Awarded 06 2. REPORTS SUBMITTED 07 3. RESEARCH PAPERS 3.1 Submitted 07 3.2 Published 08 4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 10 5. LECTURES DELIVERED 10 6. PARTICIPATION IN MEETINGS 6.1 Technical Committees 11 6.2 Other Committees 11 7. TRAINING OF PERSONNELS 11 8. IMPORTANT VISITORS 12 9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 12 10. TRAINING PROGRAMMES ORGANIZED 13 11. OTHER INFORMATION 14 Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: Http://cwprs.gov.in Summary Information For 2008-2016 Years Jobs Awarded Reports Papers Participation Lectures Technical Training of Training Submitted Published in Seminars/ Delivered Committee Personnel Programmes/ _____________________ Symposia/ Meetings Conferences Nos. | Amount (Rs.) Conferences Organized 2008-09 130 15,74,38,098 89 41 24 36 20 38 01 2009-10 118 14,46,68,747 94 57 39 36 30 59 04 2010-11 159 17,06,34,397 95 94 38 52 23 61 11 2011-12 139 18,56,13,568 116 63 26 45 42 88 08 2012-13 150 22,53,10,859 120 67 44 57 24 55 08 2013-14 152 18,24,51,087 112 63 37 68 21 54 11 2014-15 153 25,69,14,032 113 62 58 47 12 62 09 2015-16 85 13,95,89,971 106 65 51 74 17 120 10 FOR CURRENT YEAR 2016-2017 Till June-16 22 3,28,71,787 16 09 09 20 03 57 01 During July-16 14 1,59,15,400 06 21 30 12 01 29 02 Total 36 4,87,87,187 22 30 39 32 04 86 03 2 CWPRS Information Bulletin July, 2016 1. ESTIMATES 1.1 Submitted: (34 Nos. totaling to Rs. 6,36,98,530/-) Sl. Name of Work Sponsoring Agency Division Amount (Rs.) No. Running and Maintenance of Chief Engineer, Chennai Port Trust, PH-II 20,95,740 1. Chennai port regular wave physical Rajaji Safai, Chennai - 600 001 model during 2016-17 Surge analysis and suggesting Superintending Engineer, Upper HMC 4,82,370 2. surge protection device for Wardha Project Circle, Upper Gurukunj Lift Irrigation Scheme, Wardha Colony, Shivaji Nagar Tal. Tiwala, Dist - Amaravati, Camp, Amaravati - 444 603, Maharashtra Maharashtra On site calibration of Magnetic flow Manager, 805, Hallmark Business HMC 1,14,560 3. transmitters for M/s ONGC Plaza, Guru Nanak Hospital Road, Mangalore Petrochemicals through Bandra (East), Mumbai - 400051 Libra Techon Ltd., Mumbai 4. Running and Maintenace of New Chief Engineer (Civil), New PH-II 28,59,320 Mangalore Port random wave Mangaore Port Trust, Panambur, Physical model during 2016-17 New Mangalore - 575010, Karnataka 5. Maintenance of 3-D random wave Chairman-cum-Managing Director, PH-II 16,02,840 physical mode lof Kamarajar Port, Kamarajar Port Limited, P.T. Lee, Ennore under Research and C.N. Maaligai, No. 23, 1st Floor, Development Scheme of Kamarajar Rajaji Salai, Chennai - 600 001, Port during the year 2016-17 TamilNadu 6. Surge analysis and suggesting Executive Engineer, Vishnupuri HMC 4,98,160 surge protection device for raising Project Division, No. 2, Nanded 431 main of Kolmbi Lift irrigation 605, Maharashtra scheme, Tal Naigaon, Dist. Nanded 7. Desk & Wave flume studies for Superintending Engineer, Gul of CHS-II 61,45,370 design cross sections for the Khambhat Development Project, protection structure to the main Project Implementaiton Unit - 1, dam of Kalpasar Project in Gujarat Panchashil Society, Plot No. 1764, Sardarnagar, Bhavnagar - 3640001 8. Mathematical model Studies for Executive Engineer, Port Division, MMCE 16,38,570 wave tranquility and Shoreline Baithkol, Karwar, Karnataka - 581 changes for development of fish 302 landing centre at Murdeshwar, Karnataka 9. Desk and wave flume studies for Executive Engineer, Port Division, CHS-II 8,80,980 the design of breakwaters for the Baithkol, Karwar, Karnataka - 581 development of fish landing centre 302 of Murudeshwar, Khatkal Tal. In Uttar Kannada, Dist. Karnataka 10. Hydraulic Model studies for The Managing Director, 2nd Floor, SED 99,69,720 spillways of Kiru HE Project, JKPCC Building, Rail Head Kishtwar, J&K, 1:75 Scale 3D Complex, Panama Chowk, Jammu - comprehensive model 180 006 11. Hydraulic model studies for The Managing Director, 2nd Floor, SED 55,10,730 spillway of Kiru HE Project, JKPCC Building, Rail Head Kishtwar, J&K 1:50 Scale 2D Complex, Panama Chowk, Jammu - Sectional model 180 006 12. Micro-earthquake study for Chief Engineer Geologist, Jammu ES 34,91,730 Sawalkote HEP, Ramban, J&K and Kashmir Power Development Corporation, Geological Wing, CID 3 CWPRS Information Bulletin July, 2016 Block, PDD Complex, Bemina, Srinagar, 190018, Camp Office, 480- F, Nitco Lane, Talab Tillo, Jammu 13. Performance Testing of Submersible Superintending Engineer, Central HMC 1,12,130 Pumps for UPSD for Equipment & Stores - Procurement Superintending Engineer Central Cell, Irrigation & Water Resources Equipment & Stores Procurement Department UP, Ganga Sinchai Cell Irrigation & Water resources Bhawan, Telibagh, Lucknow - department U.P. Ganga Sinchai 226025 Bhawan, Telibagh Lucknow - 226 025 14. Flow rate testing of Transit Time Managing Director, Mechanics HAPT-I 3,25,200 Flow meters in Open Channel at System Private Limited Pune, S. No. CWPRS 107, Warje, Pune - 411 058 15. Evaluation of rock mass property The Director, Parwari Builders Pvt. GE 1,61,980 for rock in excavated Tunnel for Ltd., 211/212 City Point, 17 Boad Ramganj Mandi-Bhopal New BG Club Road, Pune - 411 001, Rail Line Project, Rajasthat Maharashtra 16. Mathematical Model Studies for The DGM (P), Surface Managers MMCE-II 23,53,280 Tidal Hydrodynamics siltation and Office, B&S Asset, ONGC, B-5, 7th dredging material disposal for the Floor, NBP Green Heights, BKC, deployment of rig at North Tapi in Bandra(E), Mumbai - 400051 Gulf of Khambhat, Gujarat 17. Desk studies for the hydraulic DGM, M/s Adlabs Entertainment SED 13,58,600 design of spillway and energy Pvt. Ltd., Khopoli, Maharashtra - dissipator for the earthfill dam near 410 203 Khopoli, Maharashtra for M/s Adlabs Entertainment Pvt. Ltd. 18. Determination of properties of Executive Engineer, Lower Tapi GE 2,95,860 casing and hearting material for Dam, Sub Division -2, Chopda, Dist proposed earthen dam for Lower - Jalgaon, Maharashtra - 425 001 Tapi Project, Jalgaon, Maharashtra 19. Ship Mooring analysis for Deputy Chief Engineer, WAPCOS MMCE-I 14,33,380 development of outer harbour of Ltd. Swastik, Gulmohar Path, Paradip Port, Odisha for M/s Behind SNDT, Erandawane, Pune - WAPCOS 411 004 20. Ship mooring studies at Mus Bay in Deputy Chief Engineer, WAPCOS MMCE-I 7,41,140 Car Nicobar for M/s WAPCOS Ltd. Swastik, Gulmohar Path, Behind SNDT, Erandawane, Pune - 411 004 21. Mathematical Model Studies of Chief Engineer (Civil), Paradip Port MMCE-I 12,00,910 Shoreline evolution for the Trust, Paradip Port - 754142, Dist. development of outer harbour of Jagat Singhpur, Odisha Paradip Port, Odisha 22. Mathematical Model Studies for Chief Engineer (Civil), Paradip Port MMCE-II 17,73,890 Tidal hydrodynamics and siltation Trust, Paradip Port - 754142, Dist. for the development of proposed Jagat Singhpur, Odisha outer harbour at Paradip Port, Odisha 23. Physical model studies for wave Chief Engineer (Civil), Paradip Port CHS 20,97,090 tranquility of proposed Trust, Paradip Port - 754142, Dist. development of outer harbour of Jagat Singhpur, Odisha Paradip Port, Odisha 24. Mathematical model studies for Chief Engineer (Civil), Paradip Port MMCE-I 15,05,310 wave tranquility for development Trust, Paradip Port - 754142, Dist. of outer harbour of Paradip Port, Jagat Singhpur, Odisha Odisha 4 CWPRS Information Bulletin July, 2016 25. Desk and wave flume studies for Chief Engineer (Civil), Paradip Port CHS-II 25,00,470 the design of breakwater for the Trust, Paradip Port - 754142, Dist. development of Proposed outer Jagat Singhpur, Odisha harbour at Paradip Port, Odisha 26. Hydraulic model studies for Chief Engineer (Design), CVPP Ltd., HAPT-I 70,02,860 Reservoir sedimentation of Kiru HE 2nd Floor, JKPCC Building, Panama Project, Kishtwar, J&K Chowk, Jammu - 180006 27. 2-Day training course on Chief Engineer (Planning & SWH 2,10,780 Simulation studies for Engineers/ Hydrology), National Hydrology Officers of WRD, GoM, Nasik to be Project, Water Resources held at Nashik, Maharashtra Department, Jalvidyan Bhawan, Mesi Campus, Dindari Road, Nashik, Maharashtra-422004 28. 2-Day training course on Modern Chief Engineer (Planning & SWH 2,10,780 Techniques of Yield for Hydrology), National Hydrology Calculations for Engineers/ Project, Water Resources Officers of WRD, GoM, Nasik to be Department, Jalvidyan Bhawan, held at Nasik, Maharashtra Mesi Campus, Dindari Road, Nashik, Maharashtra-422004 29. Desk studies for designing flood Deputy General Manager, M/s HMET 7,82,590 estimation and reservoir routing for Adlab Entertainment Pvt. Ltd, the earthfill dam near Khopoli for Khopoli - Pali Road, SH-92, Tal. M/s Adlabs Entertainment Pvt. Khalapur, Khopoli, Dist. Raigad, Ltd. Maharashtra 30. Strain measurement in exposed Chief Engineer (Electrical Designs), SMA 15,89,150 portion of penstocks 3 & 4 during Karnataka Power Corporation in-situ hydro test under static and Limited, Sudarshan Complex, 3rd running conditions for Nagjhari Floor, 22/23, Sheshadri Road, Power House Kdlinadi HE Project, Bengaluru, Karnataka - 560 009 Karnataka 31. Studies for evaluating the mortar Dy. Executive Engineer, Lower Tapi CT 4,13,540 making properties of two samples Dam, Sub Division-2, Chopda, Dist of fine aggregate for Lower Tapi - Jalgaon, Maharashtra - 425001 project, Jalgaon, Maharashtra 32. Analysis and interpretation of Assistant Engineer, Gr. I, Kanhar ES 5,83,240 strong Motion Data, Tarali Dam Canal Sub Division No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us