Orncettt@ Forwarded By, CERIFICATE

Orncettt@ Forwarded By, CERIFICATE

CERIFICATE Subject: Diversion of 2.32016Ha. of Forest land in favour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. Certified that R.K. I(alra, Dy. Chief Engineer/Construction-1, Northern Railway Chandigarh will agree to bear the cost incurred for cost of compensatory afforestation and NPV (Net Present Value) of diverted forest land and penalty (if imposed) as claimed by the Puniab Forest l)epartment/MoEF, G.O.I, according to their scheme liom time to time. We undertake to provide the non forest land for compensatory afforestation or its cost equivalent to the forest area being diverted as fixed by the government/Forest Deparlment, after receipt the Principal Approval from MoEF(GOI) or as and when asked by the Forest Depar-tment/Government o f Indi a. In Case the rates of Compensatory Afforestation, Net Present Value (NPV) and Penal Compensatory Afforestation (imposed) are revised upwards, the additional/differential amount shall be paid by R.K. Kalra, SV. Chief Engineer/Construction-1, Northern Railway Chandigarh. Place:- Chandigarh Signature of the User Date:- orncettt@ Forwarded by, CERIFICATE Subject: Diversion of 2.32016 Ha. of Forest land in favour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. It is cerlified that the proposed area of construction of Railway line of from Dalutpur Chowk-Kartoli station between length of block section is 16 KM at vill. Bhatouli, Bhavnaur, Sikri & Kartoli, Tehsil-Mukerian, Khasra nos. (List & jamabandi attached herewith) under Forest Division Dasuya & Distt. Hoisharpur, Punjab is not closed under section 4 &. 5 of Punjab Land Preservation A[ct 1900. Place:- Chandigarh Signatur Date:- Agency Office Seryl abi'r FgI:'19,:* Forwarded by' Subject: Diversion of 2.32016 Ha. of Forest land in far,.our of Nor-thern Railwav for the construction of Railway rine from Daiutpur"a;;;d;i station between length of block slction is 16 KM. under Forest Division Dasuya & Distt. Hoisl-rarpur, punjab. 1' certified that no more forest area other than as shown in the proposal (i.e. 2.3201G) will be diverted for non_forestry pulpose. 2' certified that legal status of the land involved in the pro.ject will not be changed without approval as granted under Forest Conservation Act 19g0. 3. cerlified that the funds would be made avairabre Chief by Sh. R.K. Karra, Dy,. Engineer/construction-r, Northern Rairway. compensatory chandigarh for afforestation, plantation and its maintenar.. imposed) .t.. and penalty (if as claimed by the punjab Forest Departmentr\roEF. according to their G.o.I, scheme from iir. to time. In case the rates compensatory Afforestation, present of Net value (Npv) and penal compensatory Afforestation (imposed) are revised additional/differentiar upu,,ards. the amount sharl te paid by the R.K. Karra, Engineer/construction-1, Dy.. Chief Northern Rairway chandigarh. 4. Certified that the forest area diverted for the non-forestry purpose in case is minimum possible and unavoidable. 5' we shall ensure that our Department will be provided the non forest land for eoulvalent to the forest area being ::;;ffiTi:"fljT.T,]:^ldiverted as fixed :l l" ;3st by the government/Forest d.part-.nt, after .qp.ipi;;.3:[i Approval from MoEF (GOI) or asi and when asked by the For$t Department/ Government of India. Place:- Chandigarh Signature of.t Date:- Office ShFh Northe Forwarded by: AFFIDAVIT I, R.K. Kalra, Dy. Chief Engineer/Construction-1, Northern Railway Chandigarh do hereby solemnly affirm and declare as under :- 1. That I am the Dy. Chief Engineer/Construction-1, Northern Railway Chandigarh. 2. That our Department has applied for the diversion of 2.32016 hac. of forest land infavour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between Iength of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. 3" That I will agree to bear the additional amount of N.P.V (Net Present Value), of diverted forest land if so determined as per the final decision of the Hon'ble Supreme Court of India. Place: Dated: '3i"1ih,.'t' VERIFICATION:- R.,.?:f illffi It is verified that the contents of my above statement are true and correct to the best of my knowledge and nothing has been concealed therein. Place : .................. Dated "Tl*1'r:1?ffi|3ifrx**' ?,';d;; Rair$ar' Subject: Diversion of 232016 FIa" of Forest land in favour of Norlhern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block sectiort is 16 KM" under Forest Division Dasuya & Distt" Hoisharpur, Punjab. ANEXTIRE-I BRBAK UP OF THE TOTAL AREA REQUIRED FOR THE PROJECT Sr. Name of the Forest Area Non Forest Area Total Remarks No" Strip (Proiect Area Detail) Forest From To Length width Area Length width Area Area (Mtr) (Mtr) (Ha) (Mtr) (Mtr) (ha) involved (Ha.) 1 Dalutpur 2.32016 Detail Shown in 3.93402 2.32016 Chowk- Detail Shown in ha. map Ha. ha. Kartoli station map between length of block section i is 16 KM I Place:- Chandigarh Signature o{ Date:- oq5x$#i$ileo"autg* Forwarded by: STATEMENT SHOWINc offiREST AREA Subject: Diversion of 2.32016 Ha. of Forest land in favour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, punjab. Sr. District Division Range/Teh Khasra/Survey or Non- Present Remar sil/ Village Compartment Forest )' Land Use ks Number or Km. Area Stone involved in the proposal (Ha.) l. ) 3. 4. 5 6. 7. 8. 1 Hoisharp Dasuya Talwaral vill. Bhatouli, 3.93402 Agricultur ur Mukerian/ Bhavnaur, Sikri & Hac. e land Bhatouli, Kartoli, Tehsil- Bhavnaur, Mukerian, Khasra siki & nos. (List & Kartoli, jamabandi attached herewith) Signature of Place:- Charrdigarh Office S$_t,ffi,ffi"vry Date: Forwarded by, qHEC4 LIST q4ruAl/ r\y.VMPER:11 CBRTTFICATE FOR MTNTMUM USE OF FOREST LAND Subject: Diversion of 2.32016Ha. of Forest land in favour of Nonhern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. This is to certify that the fbrest area involved in the proposal is unavoidable and barest minimum forest area i.e 2.32016 ha. area is proposed for diversion. Place:- Chandigarh Signature of ffe User Date:- o rri c e t. ffi-?*' il,?i"ry;@Sfd" Forwarded by, CHECK LrST SE-RrAL NUMPER.-12 UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORE$TATTON Subject: Diversion of 2.32016 Ha. of Forest land in favour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is l6 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. It is certify that I, R.K. Kalra, Dy. Chief Engineer/Construction-1, Northern Railway Chandigarh hereby, undertake to pay the entire amount of compensatory afforestation in lieu of the forest land for diverted for construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division l)asuya & Distt. Hoisharpur, Pqnjab as per prevailing wage rate at the time of plantation. Place:- Chandigarh Signature of tfr Date:- Office ShFhT.' Forwarded by, CHECK LIST SERIAL NUMBER-l3 UNDERTAKING FOR THE PAYMEI{T OF NET PRESENT VALUE OF FOREST AREA Subject: Diversion of 2.32016Ha. ofForest land in favour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab It is certiflz that I, R.K. Kalra, Dy. Chief Engineer/Construction-1, Northern Railway Chandigarh have applied for 2.32016 hac. of forest land for the purpose of infavour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. I, hereby, undertake to pay the Net Present Value (N.P.V) of the above forest land. of the Place:-Chandigarh Signature Y.t".:tgsnqy Date:- oin.. s.dr. glY 3l,illffii''*h North-em Forwarded by: CHECK LIST SERIAL NUMBER-l4 UNDERTAKINq FOR SUBMISSION OF NOC IN RESPECT OF COMPLETE SETTLEMENT OF RIGHTS IN TERMS OF SCHP,DULE TRIBES AND OTHER TRADITIONAL DWELLERS (RECONGNITION OF FOREST RIGHTS) ACT,2006 FROM DISTRICT COLLECTOR Subject: Diversion of 2.32015 Ha. of Forest land in favour of Northern Railway for the construction of Railway line from Dalutpur Chowk-Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. It is certifu that I, R.K. Kalra, Dy. Chief Engineer/Construction-1.0 Northern Railway Chandigarh have applied for 2.32016 hac. of forest land infavour of Northern Railway for the construction of Railway line from Dalutpur Chowk- Kartoli station between length of block section is 16 KM, under Forest Division Dasuya & Distt. Hoisharpur, Punjab. I, hereby, undertake that NOC of Complete Settlement of Right, in terms of Schedule Tribes and other Dwellers (Recognition of Forest Righ| Act2006 on the forest land. I shall furnish the same to your office as soon as I receive NOC from District Collector before leceiving in principle app Place: Chandigarh Signature of t ffiX*no Date:- Office Setlidi- Rai\uaY' Forwarded by: 9H4C4 LrSr. SENAL NUMqER_1 s UNDERTAKIN.G FgR TREPS.STA.IYqING IN F'ORE$TAREA BEING prvERTEp UNpEB FCA.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us