Line Rd. Reconstruction Kamm Rd. to Aaron Dr

Line Rd. Reconstruction Kamm Rd. to Aaron Dr

CONTRACT DOCUMENTS FOR: CITY OF LYNDEN, WASHINGTON LINE RD. RECONSTRUCTION KAMM RD. TO AARON DR. CITY OF LYNDEN PROJECT NO. 2011-10 Consisting of: Bid Documents Contract Forms Specifications & Conditions Drawings Provided for: Engineer: City of Lynden Reichhardt & Ebe Engineering, Inc. Steve Banham, P.E. Public Works Director 423 Front St. 300 4th Street Lynden, WA 98264 Lynden, WA 98264 Phone: (360) 354-3687 Phone: (360) 354-3446 TABLE OF CONTENTS INVITATION FOR BID .............................................................................................................. 4 BID PROPOSAL PACKAGE ...................................................................................................... 6 BID PROPOSAL ........................................................................................................................ 7 BIDDER IDENTIFICATION ................................................................................................... 13 NON-COLLUSION DECLARATION ..................................................................................... 14 BID PROPOSAL SIGNATURE AND ADDENDUM ACKNOWLEDGMENT ..................... 15 BID BOND ............................................................................................................................... 16 SPECIFICATIONS AND CONDITIONS ................................................................................ 17 AMENDMENTS TO THE STANDARD SPECIFICATIONS ................................................ 18 INTRODUCTION TO THE SPECIAL PROVISIONS .......................................................... 130 DIVISION 1: GENERAL REQUIREMENTS ................................................................................ 131 1-01 DEFINITIONS AND TERMS ...................................................................................................... 131 1-02 BID PROCEDURES AND CONDITIONS .................................................................................. 133 1-03 AWARD AND EXECUTION OF CONTRACT .......................................................................... 140 1-04 SCOPE OF THE WORK .............................................................................................................. 142 1-05 CONTROL OF WORK ................................................................................................................ 143 1-06 CONTROL OF MATERIALS ...................................................................................................... 148 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ....................................... 148 1-08 PROSECUTION AND PROGRESS ............................................................................................ 161 1-09 MEASUREMENT AND PAYMENT .......................................................................................... 167 1-10 TEMPORARY TRAFFIC CONTROL ......................................................................................... 170 DIVISION 2: EARTHWORK ......................................................................................................... 173 2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP ......................................................... 173 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS .......................................................... 174 2-03 ROADWAY EXCAVATION AND EMBANKMENT ................................................................ 175 2-04 HAUL ........................................................................................................................................... 176 2-07 WATERING ................................................................................................................................. 176 2-09 STRUCTURE EXCAVATION .................................................................................................... 177 DIVISION 4: BASES ...................................................................................................................... 178 4-02 GRAVEL BASE ........................................................................................................................... 178 DIVISION 5: SURFACE TREATMENTS AND PAVEMENTS ................................................... 179 5-04 HOT MIX ASPHALT ................................................................................................................... 179 DIVISION 7: DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER MAINS, AND CONDUITS ............................................................................................................. 183 7-01 DRAINS ........................................................................................................................................ 183 7-04 STORM SEWERS ........................................................................................................................ 184 7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS ................................................. 185 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS ............................................................. 186 7-09 WATER MAINS .......................................................................................................................... 186 7-15 SERVICE CONNECTIONS ......................................................................................................... 191 7-17 SANITARY SEWERS .................................................................................................................. 193 7-18 SIDE SEWERS ............................................................................................................................. 194 7-19 SEWER CLEANOUTS ................................................................................................................ 195 DIVISION 8: MISCELLANEOUS CONSTRUCTION .................................................................. 196 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL .............................................. 196 8-02 ROADSIDE RESTORATION ...................................................................................................... 196 8-04 CURBS, GUTTERS AND SPILLWAYS ..................................................................................... 198 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES ................................................................. 199 2 8-09 RAISED PAVEMENT MARKERS ............................................................................................. 200 8-14 CEMENT CONCRETE SIDEWALKS ........................................................................................ 200 8-18 MAILBOX SUPPORT ................................................................................................................. 202 8-21 PERMANENT SIGNING ............................................................................................................. 202 8-22 PAVEMENT MARKING ............................................................................................................. 203 8-30 POTHOLE EXISTING UNDERGROUND UTILITY ................................................................. 203 8-31 REPAIR EXISTING PUBLIC AND PRIVATE FACILITIES .................................................... 204 DIVISION 9: MATERIALS ............................................................................................................ 206 9-03 AGGREGATES ............................................................................................................................ 206 9-14 EROSION CONTROL AND ROADSIDE PLANTING .............................................................. 207 9-28 SIGNING MATERIALS AND FABRICATION ......................................................................... 208 APPENDICES ............................................................................................................................................. 209 STANDARD PLANS ................................................................................................................................. 209 CONTRACT FORMS .............................................................................................................. 219 CONTRACT ........................................................................................................................... 220 PERFORMANCE AND PAYMENT BOND ......................................................................... 223 RETAINAGE INVESTMENT OPTION ................................................................................ 225 ESCROW AGREEMENT FOR INTEREST BEARING ACCOUNT ............................................. 227 ESCROW AGREEMENT FOR BONDS AND SECURITIES RETAINAGE OPTION ................. 229 BOND IN LIEU OF RETAINAGE .................................................................................................. 232 APPENDICES ........................................................................................................................... 234 – STATE PREVAILING WAGE RATES .................................................................... A-1 3 INVITATION FOR BID CITY OF LYNDEN LINE RD. RECONSTRUCTION – KAMM RD. TO AARON DR. City of Lynden Project Number 2011-10 Bid Date: June 1, 2017 Engineer’s Estimate: $865,000 Sealed bid proposals will be received by the City of Lynden at Lynden City Hall, 300 4th Street, Lynden, Washington, 98264, (360) 354-3446, until 1:00 p.m., on Thursday, June 1, 2017, and will then and there be opened and publicly read. This contract provides for the structural overlay and widening

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    260 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us