Chapter 10 DEVELOPMENT of POWER SECTOR in NORTH

Chapter 10 DEVELOPMENT of POWER SECTOR in NORTH

Development of Power Sector in North-Eastern Region Working Group on Power for 12th Plan Chapter 10 DEVELOPMENT OF POWER SECTOR IN NORTH-EASTERN REGION 10.0 INTRODUCTION As per the demarcation of Regional Power Grids of India , the North Eastern Regional Grid of the country comprises of 7 States; namely Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura ; while State of Sikkim is the part of the Eastern Regional Power Grid . It is a land- locked Region with ninety eight percent of its border being international. The land -locked area which constitutes 8 percent of the total area of the country is connected with the main land through chicken-neck across West Bengal. In view of the slow growth of the region, special focus has been laid on economic development of North-Eastern Region and Sikkim. Accordingly strategies have been formulated for removal of infrastructure bottlenecks and creating a conducive environment for overall progress of the region including private investment etc 10.1 GENERATION PLANNING FOR NORTH-EASTERN REGION 10.1.1 Review of Capacity Addition Programme during 11th Plan As per the Mid Term Appraisal, Planning Commission had set a generation capacity addition target of 663 MW in NER and 1209 MW in the state of Sikkim during the Eleventh Plan. Out of this target 21 MW has been achieved in NER and 510 MW in Sikkim upto 30.9.2011. Capacity addition of 126 MW is likely to be achieved in NER during balance period of 2011-12. The State-wise details of capacity addition target and achievement (as on 30.09.2011) during Eleventh Plan are given in Table 10.1 below: Table 10.1 Capacity Addition during 11th Plan Target v/s Achievement in North-Eastern Region and Sikkim (All figures in MW) S.N State Target Achievement as on 30.09.2011 i Assam 537 0 ii Arunachal 0 0 Pradesh iii Meghalaya 126 0 iv Tripura 0 21 (Baramura GT-not included in Target) v Manipur 0 0 vi Nagaland 0 0 vii Mizoram 0 0 ix Total(NER) 663 21 x Sikkim 1209 510 407 | C h a p t e r 1 0 Development of Power Sector in North-Eastern Region Working Group on Power for 12th Plan 10.1.2 Installed Capacity as on 30.09.2011 The total Installed Capacity of NE Region (excluding Sikkim) as on 30.09.2011 was 2329MW comprising 1116 MW hydro and 990 MW thermal (including gas and diesel) and 223 MW from Renewable Energy Sources. The total Installed capacity of Sikkim as on 30.09.2011 was 201 MW comprising 75MW hydro and 79MW thermal (including gas and diesel) and 47 MW from Renewable Energy Sources. The State-wise details of Installed Capacity (including shares from Central Sector Projects) as on 30.09.2011 are given in Table 10.2 below: Table 10.2 (All figures in MW) Thermal Renewable Total State Hydro Coal Gas Diesel Total Energy Sources Assam 430 60 441 21 522 27 979 Ar. Pradesh 98 0 21 16 37 79 214 Meghalaya 231 0 26 2 28 31 290 Tripura 62 0 182 5 187 16 265 Manipur 81 0 26 45 71 5 157 Nagaland 53 0 19 2 21 29 103 Mizoram 34 0 16 52 68 36 138 Central 127 - 56 - 56 - 183 Unallocated Total(NER) 1116 60 787 143 990 223 2329 Sikkim 75 74 0 5 79 47 201 NER+ Sikkim 1191 134 787 148 1069 270 2530 10.1.2.2 Actual Power Supply Position during April- September, 2011 The State-wise actual power supply position during April-Sept, 2011 is given in table 10.3 below: Table 10.3 Power Supply Position during April-Sept, 2011 State Peak (MW) Peak Energy (MU) Energy Shortage / Shortage / Surplus Surplus Demand Met (MW) ( %) Require Availa (MU) (%) ment bility Assam 1112 1014 -98 -8.8 3195 3022 -173 -5.4 Ar. Pradesh 113 108 -5 -4.4 289 263 -26 -9.0 Meghalaya 319 262 -57 -17.9 978 745 -233 -23.8 Tripura 194 191 -7 -6.3 485 457 -28 -5.8 Manipur 111 104 -3 -2.9 275 248 -27 -9.8 Nagaland 106 103 -3 -2.8 305 275 -30 -9.8 Mizoram 77 67 -10 -13.0 193 171 -22 -11.4 Total(NER) 1920 1698 -222 -11.6 5720 5181 - 539 -9.4 Sikkim 100 95 -5.0 -5.0 171 170 -1 0.6 408 | C h a p t e r 1 0 Development of Power Sector in North-Eastern Region Working Group on Power for 12th Plan The State-wise actual power supply position during 2010-11 is given in table 10.4 below: Table 10.4 Power Supply Position during 2010 - 2011 State Peak (MW) Peak Energy (MU) Energy Shortage(-) Shortage(-) / / Surplus (+) Surplus(+) Demand Met (MW) ( %) Require Availa (MU) (%) ment bility Assam 971 937 -34 -3.5 5403 5063 -340 -6.3 Ar. Pradesh 101 85 -16 -15.8 511 436 -75 -14.7 Meghalaya 294 284 -10 -3.4 1545 1352 -193 -12.5 Tripura 220 197 -23 -10.5 882 801 -81 -9.2 Manipur 118 115 -3 -2.5 568 505 -63 -11.1 Nagaland 118 110 -8 -6.8 583 520 -63 -10.8 Mizoram 76 70 -6 -7.9 369 315 -54 -14.6 Total(NER) 1913 1560 -353 -18.5 9861 8992 -869 -8.8 Sikkim 106 104 -2 -1.9 402 402 0 0 10.1.3 Generating capacity addition programme in North Eastern Region/ Sikkim during 12th Plan The capacity addition requirement during 12th Plan on All-India basis is 75,785 MW comprising of 9,204 MW hydro, 63,781 MW thermal (62,695 MW coal based and 1,086 MW gas based) and 2,800 MW nuclear. The likely hydro capacity addition of 9,204 MW during 12th Plan includes 4,177 MW in North-Eastern Region and Sikkim (2,810 MW capacity addition in NER and 1,367 MW in Sikkim). Likely gas based capacity addition of 1,086 MW during 12th Plan on All-India basis includes 926 MW capacity additions in NER. Further, the coal based projects likely to be commissioned during 12th Plan, includes 250 MW coal based capacity addition in the State of Assam thus likely thermal capacity addition in North-Eastern Region is 1,176 MW. Total likely Capacity addition in North-Eastern Region and Sikkim during 12th Plan is 5,353 MW. Details of State-wise capacity addition during 12th Plan are given in Table 10.5 below: Table 10.5 State-wise Likely Capacity Addition during 12th Plan State Hydro Thermal (MW) Total (MW) (MW) Coal Gas Total Nuclear All India 9204 62695 1086 63781 2800 75785 Total(NER) 2810 250 926 1176 3986 Assam 250 100 350 350 Ar. Pradesh 2710 2710 Meghalaya 40 40 Tripura 826 826 826 Mizoram 60 60 Sikkim 1367 1367 409 | C h a p t e r 1 0 Development of Power Sector in North-Eastern Region Working Group on Power for 12th Plan List of Projects likely to be commissioned in North-Eastern Region and Sikkim during 12th Plan are given in Table 10.6 below: Table 10.6 S. No. Project Name State Sector Capacity (MW) 1 Bongaigaon TPP Assam C 250 2 Monarchak Tripura C 100 3 Tripura Gas Tripura C 726 4 Namrup CCGT Assam S 100 Total Thermal 1176 4 Pare Ar. Pradesh C 110 5 Kameng Ar. Pradesh C 600 6 Subansiri Lower Ar. Pradesh C 2000 7 Tuirial Mizoram C 60 8 New Umtru Meghalaya S 40 9 Bhasmey Sikkim P 51 10 Jorethang Loop Sikkim P 96 11 Rangit-IV Sikkim P 120 12 Teesta-VI Sikkim P 500 13 Teesta-III Sikkim P 600 Total Hydro 4177 Total NER+Sikkim 5353 10.2 TRANSMISSION PLANNING FOR NORTH-EAST 10.2.1. Comprehensive Scheme for Strengthening of Transmission and Distribution System in NER and Sikkim Based on the recommendation of CEA and in consultation with each state of NER and Sikkim, Powergrid has prepared detailed project reports for comprehensive schemes for strengthening of transmission, sub transmission and distribution system in each state of NER and Sikkim and also for inter-state transmission system in NER in June 2010. The estimated cost of the above schemes is about Rs. 11,348.5 crores. The schemes were to be implemented in two phases by 2015-16. The state wise break-up for cost of Transmission, Sub-transmission and Distribution schemes is given in Table 10.7 below. Table 10.7 (Rs Crores) Sl. States Transmission & Sub Distribu- Sub-Total Consultancy Total No. Trans (132 kV & above) tion Phase-I Phase-II 1 Inter-State 44.49 250.23 00 294.72 39.01 333.73 2 Ar Pradesh 959.23 466.77 217.14 1643.14 217.49 1860.63 3 Assam 711.74 940.55 741.72 2394.00 316.87 2710.87 4 Manipur 196.88 185.52 260.21 642.61 85.06 727.67 5 Meghalaya 920.50 0.00 283.85 1204.35 159.41 1363.76 6 Mizoram 263.37 222.17 145.01 630.55 83.46 714.01 7 Nagaland 915.77 00 152.08 1067.85 141.34 1209.19 8 Tripura 612.72 229.19 284.55 1126.46 149.10 1275.56 9 Sikkim 730.70 00 287.59 1018.29 134.78 1153.07 Total 5355.40 2294.43 2372.15 10021.97 1326.51 11348.48 410 | C h a p t e r 1 0 Development of Power Sector in North-Eastern Region Working Group on Power for 12th Plan The funding for the schemes is under consideration by Government of India.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us