Transport TASK 3 - MAJOR PROJECT CASE STUDIES

Transport TASK 3 - MAJOR PROJECT CASE STUDIES

Transport TASK 3 - MAJOR PROJECT CASE STUDIES WORK PACKAGE 5 Ex post evaluation of Cohesion Policy programmes 2007-2013, focusing on the European Regional Development Fund (ERDF) and the Cohesion Fund (CF) March 2016 Authors: May 2016 Authors: John Finnegan, Richard Redfern, Jacopo Signorile EUROPEAN COMMISSION Directorate-General for Regional and Urban Policy Directorate B - Policy Unit B.2 Evaluation and European Semester] Contact: Jan-Marek ZIOLKOWSKI E-mail: [email protected] European Commission B-1049 Brussels EUROPEAN COMMISSION Transport TASK 3 – MAJOR PROJECT CASE STUDIES WORK PACKAGE 5 Ex post evaluation of Cohesion Policy programmes 2007-2013, focusing on the European Regional Development Fund (ERDF) and the Cohesion Fund (CF) CCI: 2014CE16BAT042 Directorate-General for Regional and Urban Policy 2016 EN Europe Direct is a service to help you find answers to your questions about the European Union. Freephone number (*): 00 800 6 7 8 9 10 11 (*) The information given is free, as are most calls (though some operators, phone boxes or hotels may charge you). LEGAL NOTICE This document has been prepared for the European Commission however it reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein. More information on the European Union is available on the Internet (http://www.europa.eu). Luxembourg: Publications Office of the European Union, 2016 ISBN 978-92-79-58526-5 doi: 10.2776/277756 © European Union, 2016 Reproduction is authorised provided the source is acknowledged. Ex Post evaluation: Transport Table of Contents 1 Poland: Modernisation of railway line E30/C-E 30, Kraków – Rzeszów section, Phase III .................... 3 1.1 Case study summary ......................................................................................................................... 3 1.2 Introduction ...................................................................................................................................... 4 1.3 Project context and implementation ................................................................................................. 7 1.4 Demand analysis ............................................................................................................................. 11 1.5 Financial analysis ............................................................................................................................ 13 2 Poland: A1 Toruń - Stryków ............................................................................................................. 17 2.1 Case Study Summary ....................................................................................................................... 17 2.2 Introduction .................................................................................................................................... 18 2.3 Project context and implementation ............................................................................................... 22 2.4 Demand Analysis ............................................................................................................................. 26 2.5 Financial analysis ............................................................................................................................ 28 2.6 Lessons Learnt ................................................................................................................................. 32 3 Romania: Motorway Construction on TEN-T 7, Cernavodă - Constanța Section ................................ 34 3.1 Case study summary ....................................................................................................................... 34 3.2 Introduction .................................................................................................................................... 35 3.3 Project context and implementation ............................................................................................... 37 3.4 Demand analysis ............................................................................................................................. 40 3.5 Financial analysis ............................................................................................................................ 44 4 Romania: Rehabilitation of national road DN6 Alexandria – Craiova ................................................ 48 4.1 Case study summary ....................................................................................................................... 48 4.2 Introduction .................................................................................................................................... 49 4.3 Project context and implementation ............................................................................................... 52 4.4 Demand analysis ............................................................................................................................. 55 4.5 Financial analysis ............................................................................................................................ 59 5 Bulgaria: Trakia Motorway Bulgaria (Lots 2, 3 and 4) ........................................................................ 62 5.1 Case study summary ...................................................................................................................... 62 5.2 Introduction .................................................................................................................................... 63 5.3 Project context and implementation .............................................................................................. 65 5.4 Demand analysis ............................................................................................................................ 69 5.5 Financial analysis ........................................................................................................................... 72 1 Ex Post evaluation: Transport 6 Czech Republic: Track modernisation Votice to Benešov u Prahy ..................................................... 76 6.1 Case study summary ....................................................................................................................... 76 6.2 Introduction .................................................................................................................................... 77 6.3 Project context and implementation ............................................................................................... 80 6.4 Demand analysis ............................................................................................................................. 83 6.5 Financial analysis ............................................................................................................................ 84 7 Germany: Leipzig City Rail Tunnel (Modules 5 and 6) ....................................................................... 87 7.1 Case study summary ...................................................................................................................... 87 7.2 Introduction .................................................................................................................................... 87 7.3 Project context and implementation .............................................................................................. 92 7.4 Demand analysis ............................................................................................................................ 95 7.5 Financial analysis ........................................................................................................................... 97 8 Estonia: Reconstruction of Ülemiste Junction in Tallinn ....................................................................... 101 8.1 Case study summary ..................................................................................................................... 101 8.2 Introduction .................................................................................................................................. 102 8.3 Project context and implementation ............................................................................................. 105 8.4 Demand analysis ........................................................................................................................... 107 8.5 Financial analysis .......................................................................................................................... 111 9 Spain: Madrid-Valencia-Murcia High Speed Rail .................................................................................. 114 9.1 Case study summary ..................................................................................................................... 114 9.2 Introduction .................................................................................................................................. 115 9.3 Project context and implementation ............................................................................................. 117 9.4 Demand analysis ........................................................................................................................... 120 9.5 Financial analysis .......................................................................................................................... 125

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    154 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us