Roads and Buildings Department Government of Gujarat

Roads and Buildings Department Government of Gujarat

ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Public Disclosure Authorized GUJARAT STATE HIGHWAY PROJECT-II Public Disclosure Authorized Part -1: Environmental Management Framework (EMF) - Upgradation ( Widening and Strengthening) Corridors and Public Disclosure Authorized Part -2: Environment and Social Management Framework (ESMF) - Maintenance/ Rehabilitation Corridors Public Disclosure Authorized P May 2013 Part 1: Environmental Management Framework (EMF) -Upgradation (Widening and Strengthening) Corridors This Environmental Management Framework (EMF) is prepared to help and facilitate consistent preparedness on Environmental aspects of yet to be initiated up-gradation (Widening and Strengthening) road corridors of GSHP-II only. Part 2: Enviornment and Social Management Framework (ESMF) -Maintenance and Rehabilitation Corridors This ESMF is prepared to help and facilitate consistent preparedness on Environment and Social aspects of yet to be initiated Maintenance (Rehabilitation) road corridors of GSHP-II only. Part -1: Environmental Management Framework (EMF) - Upgradation ( Widening and Strengthening) Corridors Table of Contents Chapter 1: Introduction ................................................................................................ 1 1.1 Overview .............................................................................................................................. 1 1.2 Rationale and Background .................................................................................................... 1 1.3 GSHP-II Proposed Improvements ......................................................................................... 5 1.3.1 Design Intervention for Upgradation Corridors...................................................................... 5 1.4 Need for the EMF ................................................................................................................. 6 1.5 Purpose and use of EMF ....................................................................................................... 6 Chapter 2: Legal Frame work ...................................................................................... 8 2.1 Environmental Rules and Regulations ................................................................................... 8 2.2 World Bank safeguard policies .............................................................................................. 9 2.3 Other legislations applicable to GSHP-II ............................................................................. 10 2.4 Clearance Requirements ...................................................................................................... 11 2.4.1 Environmental clearance (EC) ............................................................................................. 11 2.4.2 Consent from Gujarat Pollution Control Board .................................................................... 12 2.4.3 Forest Clearances ................................................................................................................ 12 2.5 Summary of Clearance Requirements .................................................................................. 13 Chapter 3: Procedure for Conducting Environmental Assessment ....................... 16 3.1 Introduction ........................................................................................................................ 16 3.2 Step 1: Screening ................................................................................................................ 17 3.3 Step 2: Environmental Assessment ...................................................................................... 19 3.3.1 Scoping............................................................................................................................... 19 3.3.2 Environmental Impact Assessment ...................................................................................... 20 3.3.3 Existing Environmental Conditions ..................................................................................... 21 3.3.4 Assessment of Policy and Regulations ................................................................................ 21 3.3.5 Impact Prediction ................................................................................................................ 21 3.3.6 Analysis of Alternatives ...................................................................................................... 21 3.3.7 Stakeholder Consultation at all stages of project .................................................................. 22 3.3.8 Environmental impacts identification .................................................................................. 23 3.3.9 Determining degree of impact ............................................................................................. 26 3.3.10 Mitigation and Monitoring Plan .......................................................................................... 26 Chapter 4: Environmental Management Plan ........................................................... 28 4.1 EMP in Bid Documents ...................................................................................................... 43 4.2 Environmental Monitoring Plan .......................................................................................... 43 4.2.1 Monitoring Parameters and Standards ................................................................................. 43 4.2.2 Monitoring Plans for Environment Condition ...................................................................... 44 4.2.3 Environmental Monitoring Locations .................................................................................. 47 4.3 Monitoring and Post Auditing ............................................................................................. 47 4.4 Implementation of EMP ...................................................................................................... 48 Chapter 5: Good Environmental Construction Guidelines ..................................... 50 i List of Tables Table 1-1: Project Corridors .............................................................................................................. 1 Table 1-2: Project Corridors .............................................................................................................. 2 Table 2-1: Environmental Legislations / Regulations applicable to GSHP – II .................................... 8 Table 2-2: Applicability of WB Safeguard policies .......................................................................... 10 Table 2-3: Clearance requirements ................................................................................................... 14 Table 3-1: List of Sensitive Environmental Components .................................................................. 18 Table 3-2: Possible Impacts on Physical Environment .................................................................... 24 Table 3-3: Possible Impact on Social and Cultural Environment ..................................................... 25 Table 3-4: Consequence categories and rankings ............................................................................ 26 Table 3-5: Likelihood categories and rankings ................................................................................ 26 Table 4-1: Environmental Management Plan ................................................................................... 29 Table 4-2: Ambient Air Quality Standards (National) ..................................................................... 45 Table 4-3: Ambient Noise Quality Standards (National).................................................................. 45 Table 4-4: National Standard of Water ............................................................................................ 46 Table 4-5: Water Quality Criteria ................................................................................................... 46 Table 4-6: Institutional Responsibilities ........................................................................................... 48 Table 5-1: Guideline for Good Environmental Practices.................................................................. 50 List of Figures Figure 1-1: Eight GSHP-II Corridors (DPR’s Completed) .................................................................. 3 Figure 1-2: Five GSHP-II Corridors (DPR’s proposed ) ..................................................................... 4 Figure 1-3: Typical Rural Cross Section for 2 Lanes with Hard Shoulder (2L+HS) Option................. 5 Figure 1-4: Typical Urban Cross Section for 4 Lanes with Hard Shoulder (4L+HS) with Foot Path and Closed Drain Option .......................................................................................................................... 5 Figure 1-5: Typical Cross Section for 2 Lanes with Paved and Hard Shoulder (2L+PS+HS) Option ... 6 Figure 1-6: Typical Urban Cross Section for 4 Lanes with Hard Shoulder (4L+HS) with Drain Option ............................................................................................................................................. 6 Figure 2-1: Forest Clearance Procedures .......................................................................................... 13 Figure 3-1: The EIA processes in sequences of application ............................................................. 16 Figure 3-2: The Project Screening Process

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    192 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us