30,000 Priority a Greece € 12.2 Million € 5.3 Million 5 54 2 54

30,000 Priority a Greece € 12.2 Million € 5.3 Million 5 54 2 54

ANTI-FLOOD Funded PIPELINE by the RELEVANCE PROJECT SECTOR LOCATION FLOOD PREVENTION GREECE Municipalities of Nikaia-Agios PROCUREMENT Ioannis Rentis and Moschato- Tavros, Attica Region Construction of a flood protection pipeline network in areas of the municipalities of Nikaia-Agios Ioannis Rentis and Moschato-Tavros EXPECTED # OF BENEFICIARIES 30,000 TIMELINE 01/01/2016 Start of IP project KEY STATS 5 OUT OF 54 20/04/2018 major flooding incidents in the Attica Region in the last 100 years Signature of IP by CA 05/09/2018 Tender closure have occurred in the Municipality of Moschato-Tavros OUT OF 31/12/2018 2 54 Original end of project major flooding incidents in the Attica Region in the last 100 years have occurred in the Municipality of Nikaia-Agios Ioannis Rentis 28/03/2019 Contract signature and accession The flood protection project monitored is included among of contractor to the IP 09/2019 First monitoring PRIORITY A report publication projects to be funded by the 2014-2020 Regional Operational 17/03/2020 Start of works Program of Attica 2022 (2ND SEMESTER) MAIN RECOMMENDATIONS New end of project The Contracting Authority (CA) should descriptively specify the qualitative selection criteria it chooses to set (economic and financial standing and / or technical and professional capacity), COSTS thereby making the essential information clear and readily available for all possible bidders ― both domestic and foreign. TENDER The recommendation could contribute to increased competition BUDGET: € 12.2 Million (potential wider participation of bidders). Taken on board. CONTRACT The CA should include a detailed description of the publicity VALUE: activities to promote the flood protection work. This is essential to € 5.3 Million evaluate and justify the costs incurred. Not taken on board. European Regional Development Fund: 80% Public Investments Program (national resources): 20% IRREGULARITIES MONITORING REPORTS During the drafting of tender documents by the CA, eligibility for participation in the contract award procedure was foreseen DOWNLOAD only for companies registered in specific classes of the Register of the periodic monitoring reports at: Contractors' Enterprises and not for all enterprises operating in http://integritypact.gr/en/ekdoseis/ the specific category under which the project falls (ex. Hydraulics projects). This limitation could lead to restriction of competition, by excluding bidders who would otherwise be suitable. In the final version of the call, the CA omitted the precondition, as WHAT'S NEXT? recommended. The Funding Decision included a special term regarding the Publication of second monitoring report completed expropriation of private properties before the signature Publication of second newsletter of the contract. The term was not fulfilled as foreseen and is still Presentations to affected communities/municipalities pending, thus creating delays in the execution of works. Meetings with students CSO MONITOR: TI GREECE.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us