M/S. Twilight Stone (P) Ltd 84, Eldam Road, Teynampet, Chennai Tamil Nadu

M/S. Twilight Stone (P) Ltd 84, Eldam Road, Teynampet, Chennai Tamil Nadu

FOR MULTI COLOUR GRANITE (KASHMIR GOLD\WHITE) QUARRY IN S.F. NO. 404/1(P), 2(P),5(P),6(P) & 405/1(P), VADACHINNERIPALAYAM VILLAGE, KANGEYAM TALUK, ERODE DISTRICT, TAMIL NADU. (Period of Scheme of Mining: 2016-2017 to 2020-2021) G.O 3(D) No. 47 Industries (MMB-2) Dept. dated 28.02.2006 (Prepared under Rule 18(2) (1) of GCDR, 1999 for Existing Mining Lease) Extent : 1.53.0 Hectares S.F.No. : 404/1(P), 2(P),5(P),6(P) & 405/1(P), Village : VADACHINNERIPALAYAM Taluk : KANGEYAM District : TIRUPUR State : TAMIL NADU Applicant M/s. Twilight Stone (P) Ltd 84, Eldam Road, Teynampet, Chennai Tamil Nadu. Pincode-600 018, Contact Number: +919843894688 Prepared by S.SURIYAKUMAR, M.Phil.(Geology),F.C.C.(Mining), PGDBA, PGDIPC (Industrial Pollution Control) RQP & NABET/QCI Accredited EIA Consultant, Reg. No. RQP\MAS\013\87\A Aadhi Boomi Mining and Enviro Tech (P) Ltd., 3/216, K.S.V.Nagar, Narasothipatti, SALEM-636 004. Phone (0427) 2440446, Cell : 09842729655 [email protected], [email protected] FOR MULTI COLOUR GRANITE (KASHMIR GOLD\WHITE) QUARRY IN S.F. NO. 404/1(P), 2(P),5(P),6(P) & 405/1(P), VADACHINNERIPALAYAM VILLAGE, KANGEYAM TALUK, TIRUPUR DISTRICT, TAMIL NADU. (Period of Scheme of Mining: 2016-2017 to 2020-2021) G.O 3(D) No. 47 Industries (MMB-2) Dept. dated 28.02.2006 (Prepared under Rule 18(2) (1) of GCDR, 1999 for Existing Mining Lease) INTRODUCTION: The mining Scheme is suppose to be prepared under the Rule 18 (2) (1)of GCDR, 1999 for the existing mining lease once in five years for systematic and scientific development of quarries. The first scheme of mining is due for the period 2011-2012 to 2015-2016 is submitted during the plan period and therefore the scheme of mining is prepared for the next five years period from 2016-17 to 2020-21 for effective implementation. The applicant, M/s. Twilight Stone (P) Ltd, registered at No.84, Eldam Road, Teynampet, Chennai having vast experience and skill on quarrying of granite blocks in Tamil Nadu for the last 10 years. They have been granted mining Lease from the State Government over an extent of 1.53.0Hectares in S.F.No. 404/1(P), 2(P),5(P),6(P) & 405/1(P), Vadachinneripalayam Village of Kangeyam Taluk, Tirupur district to quarry multi colour granite blocks under G.O 3(D) No. 47 Industries (MMB-2) Dept. dated 28.02.2006 and lease was executed on 27.03.2006 for a period of 20years till 26.03.2026. Lease particulars details are given as under, TABLE-I Extent Date of Date of Period Date of G.0.No (Hec.) Grant Execution of lease expiry G.0.3(D) No. 47 1.53.0 28.02.2006 27.03.2006 20 years 26.03.2026 Industries\.Dept The multicolor Granite deposits in Vadachinneripalayam area of Kangeyam Taluk, Tirupur District and Tamil Nadu is commercially called as KASHMIR GOLD\WHITE. It mainly composed of mineral constituents like quartz and feldspar with accessory minerals like garnet, Biotite and muscovite mica. The feldspar is mostly white in nature due to presence of Albite and Oligoclase series of plagioclase group. Disintegration and decomposition of ferromagnesian minerals provide golden shade up on polished for the top layer of 3-6m thick sheets. Dimensional cutting and polishing of these types of hard and compact sheet exhibits an attractive pale yellow to light white shades of background. The multi colour obtained after polishing is almost white\Gold and find a suitable market in flooring Tiles and slabs. Granites finds its application in such industries owing to the fact of its high compressive and tensile strength, high hardness ranging from 6.5 – 7.5 (Moh’s scale) specific gravity 2.70 and attain high polishing which create an excellent aesthetic value. Production particulars for the last five years are given as under, Years Production (cu.m) 2011-12----------- 264 2012-13----------- 182 2013-14----------- 1598 2014-15----------- 1585 2015-16----------- Nil ------------ 3629 ------------ The mining plan was approved by the Dept. of Geology and Mining Guindy, Chennai vide Letter No.12965/MM5/2005 dated 23.02.2006 and lease was executed on 27.03.2006. The first Scheme of mining is expired 31.03.2016. Now the next five years Scheme of mining period from 2016-2021 is prepared and submitted for approval. The applicant had worked the quarry scientifically and systematically to extract the rough blocks for exports. It is advised to the applicant that all dumps must be made within the lease boundary as per GCDR, 1999 or obtain surface rights and get approval from State Govt. for dumping outside the lease, if required. Geological and working plans and sections are prepared in a suitable scale in 1:1000 and 1:500 respectively, to illustrate the final pit configuration of the mine and method of working the deposit systematically. 2 1.0 REVIEW OF SCHEME OF MINING 1.1 Name and Address of M/s Twilight Stones (P) Ltd, the Applicant 84, Eldam road, Teynampet, Chennai Pin – 600 018 Tamil Nadu +919843894688 1.2 Status Individual 1.3 Mineral for which lessee Colour Granite – Kashmir intends to mine Gold/white 1.4 Name and address of S.SURIYAKUMAR the RQP who prepared M.Sc., M.Phil (Geology). F.C.C. the companied mining (Mining), Scheme PGDBA, DIPC (Industrial Pollution Control). Aadhi Boomi Mining and Enviro Tech (P) Ltd., 3/216, K.S.V. Nagar, Narasothipatti, Alagapuram -Post, Salem – 636 004. Tamil Nadu. 1.5 Web site /E-mail www.abmenvirotech.com [email protected] [email protected] 1.6 RQP registration No.& RQP & NABET/QCI Accredited EIA Validity Consultant, Reg. No. RQP\MAS\013\87\A 1.7 Name and Address of M/s Twilight Stones (P) Ltd, the prospecting Agency Chennai 1.8 Area and date of expiry of 1.53.0Hec, 26.03.2026 Quarry lease Area 3 PART – I 2.0 LOCATION AND ACCESSIBILITY: a) Location The Location of the area is given in Plate I. It is represented by Survey of India Topo sheet No. 57 F/9 with center of reading 10º57’04.9”N and 77º31’18.3”E with elevation 284m above MSL. The location map is given in plate No. 1. The pillar co-ordinates and details of the lease area are given below. The details of the area are as tabulated below: State & Extent Ownership Taluk Village S.F.No. District (Hec) Occupancy 404/1(P) 0.23.0 404/2(P) 0.26.0 Tamil Nadu, Kangeyan Vadachinneripalayam 404/5(P) 0.19.0 Patta Land Tirupur 404/6(P) 0.31.0 405/1(P) 0.54.0 Total = 1.53.0 Hectares b) Route The quarry lease area is accessible from Trichy-Coimbatore main road. From Kangeyam travel towards Dharapuram to a distance of 6 Km to a place called Thundikadu. From there, the site is accessible by village road to a distance of 4kms near Koduvuron the west. The location of the area is indicated in key map shown in (Plate – I). Site Dharapuram 6 Kms Thundikadu 4 Kms Koduvur 1 km Table – I Pillar reading and geo Co - ordinates Pillar No Latitude Longitude 1 100 57’ 03.36’’N 770 31’19.51’’E 2 100 57’ 03.43’’N 770 31’18.03’’E 3 100 57’ 03.53’’N 770 31’15.66’’E 4 100 57’ 06.41’’N 770 31’15.35’’E 5 100 57’ 06.56’’N 770 31’20.34’’E 6 100 57’ 06.38’’N 770 31’21.57’’E 7 100 57’ 04.00’’N 770 31’20.92’’E 8 100 57’ 02.98’’N 770 31’20.39’’E 4 Fig.No:1 Showing Location and route map of lease area 5 2.1 Details of Infrastructure is given as under, Table - II Distance S.No. Description Place (Kms) 1 Railway Tirupur 57 South 2 Post office Kungarupalayam 1 North 4 Airport Coimbatore 77 North 5 Police station Udhiyur 8 South 6 Fire service Udhiyur 8 South Primary West 7 Kullampalayam 5 Health centre 8 Union Kullampalayam 5 West 9 School Kungarupalayam 2 West 10 DSP Office kangeyam 12 South 11 Villages i) Sammadampalayam 2.5 North ii) Kangarupalayam 2 South iii) kurukkalipalayam 4 East iv) Amarathupalayam 3 West 6 Fig.No.2 : Google image shows location of quarry with surface features around 500m 7 Fig.No.3 : Google image shows Lease boundary of the existing Quarry 8 Fig.No: 4 General View of quarry 2.2 REVIEW OF COMPLIANCE POSITION OF SALIENT FEATURES OF MINING PLAN/ SCHEME OF MINING Special conditions imposed by State Government while approving the mining plan are, i) No working shall be made within a safety distance of 7.5metres from the boundary of permitted area, ii) General conditions are given in Annexure-I (As per G.O. Copy) No other special condition was imposed during the last five years by the Dept. of Geology and Mining by the district office at Tirupur and commission ate in Chennai. Now, the mining scheme is prepared for the lease area over an extent of 1.53.0 Hec. as per the above G.O. 3(D) No. 47 \Industries(MMB2) Dept \dated 28.2.2006 for the period 2016-21. As the five years period of mining Plan is expired on 31.3.2016, now the scheme of mining is prepared for the period from 2016-17 to 2020-21,now the scheme of mining is prepared for the period from 2017-2021 for approval from the Dept of Geology and Mining, Chennai for systematic operation.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    63 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us