
APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S Item Details No 1. Name of the project/s Building Stone Quarry of Mr. Abdu Rahman 2. S. No. in the schedule 1(a) As per O. M. No. L-11011/47/2011-IA.II (M) dated 18.05.2012. 3. Proposed capacity/area/length/tonnage to be Production capacity: 40000 tonnes(max) handled/ command area/lease Lease area : 1.4054 Ha area/number of wells to be drilled 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. It is an existing quarry 6. Category of Project i.e.„ A‟ or „B‟ “B” 7. Does it attract the general No condition? If yes, please specify. 8. Does it attract the specific No condition? If yes, please specify. 9. Location The building stone quarry project is situated at Sy. No: 1006 of Painkulam Village, Thalappilly Taluk, Thrissur District, Kerala over an area of 1.4054 Ha. The project site falls in Survey of India Topo sheet No-58B/6 (Old Topo sheet No). The geographical location of the mine with respect to the pillar boundary of the lease area is given below:- Latitude 10⁰ 44‟17.18 ” N to 10⁰ 44‟ 22.81” N Longitude 76⁰17‟ 23.83” E to 76⁰ 17‟ 28.55” E 10. Plot/Survey/Khasra No. Sy.No. 1006 Village Painkulam Tehsil Thalappilly District Thrissur 11 State Kerala 11. Nearest railway station/airport Name Distance from along with distance in kms. lease Boundary (Road Distance) Railway Cochin 3 Km station Airport Cochin 64.7m International Airport 12. Nearest Town, city, District Name Distance from Headquarters along with distance lease Boundary in kms. (Road Distance) Nearest Cheruthuruthy 2 Km town District Thrissur 24Km HQ. Nearest Cheruthuruthy 2 Km City 13. Village Panchayats, Zilla Village Office: Parishad., Municipal Corporation, Painkulam Village Office, Thalapilly Taluk, Local body (complete postal Thrissur District. addresses with telephone nos. to Pin-679 531 be given Phone:- 0488 24274674 Panchayat Office: Panjal Grama Panchayat Office, Thrissur District Pin-679 531 Phone-0488-4272957 14. Name of the applicant Mr. Abdu Rahman 15. Registered address Painkulam Village, Thalappilly Taluk, Thrissur Ph.No. 9645915522 16. Address for correspondence: Name Mr. Abdu Rahman Designation(Owner/Partner/CEO) Proprietor Address Nachu Veetil House Kanjhiramukku(PO), Malappuram (dist) 12 Pin -679 584 Ph.No. 9645915522 Pin Code 679 584 E-mail [email protected] Telephone No. 9645915522 Fax No. --- 17. Details of Alternative Sites Not applicable as mining is site specific examined, if any. Location of these activity. sites should be shown on a topo sheet. 18. Interlinked Projects No 19. Whether separate application of interlinked project has been No. submitted? 20. If yes, date of submission Not Applicable. 21. If no, reason Not Applicable. 22. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given (a)The Forest (Conservation) Not Applicable Act,1980? (b) The Wildlife (Protection) Act,1972? (c) The C.R.Z.Notification,1991? 23. Whether there is any Government The following Govt. Orders / Policies are to Order/Policy relevant/relating to the be followed: site? Kerala Minor Mineral Concession Rules, 2015. Mines Act, 1952. Explosive Rules, 2008. Kerala Panchayat Raj Act, 1994. Central Ground Water Authority. Water Pollution (Prevention & Control) Act, 1974. Air Pollution (Prevention & Control) 13 Act, 1981. Environment Protection Act, 1986. EIA Notification, 2006 I 2009. The Kerala Promotion of Tree Growth in Non-Forest Areas (Amendment) Act, 2007. 24. Forest land involved (hectares) No 25. Whether there is any litigation No litigation is pending against the project pending against the project and / or and / or land in which the project is proposed. land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklis Yes/ Details thereof (with approximate quantities No t confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or Yes Land use: - The land use classification as per temporary change in revenue records is private land. The mining land use, land cover or activity will have localized impact and create topography including physical change in the existing environment increase in intensity due to the change in the land use. At the end of of land use (with life of mine, the excavated pit will be respect to local land 1.0322Ha, in which 0.8917 Ha will be use plan) reclaimed with stacked dumping and overburden and rehabilitated by plantation and the remaining part 0.1405 Ha will be used as a water pond. Topography: - The topography of the lease area is hilly. The highest elevation of the lease area is 115 m MSL and lowest is 70m MSL. 1.2 Clearance of existing Yes Part of the proposed land is already under 14 land, vegetation and mining and the remaining land is sparsely buildings? vegetated having top soil with average thickness of 1m-1.5 m. 1.3 Creation of new land Yes The new land use pattern will be as follows at uses? different stages during the life of mine. Area in Ha. As on Plan Concp. Description date period Period Area under Quarry 0.000 1.0101 1.0322 pit Area for 0.000 0.000 0.000 infrastructure / plant Road 0.000 0.0221 0.000 Green belt / 0.000 0.3732 0.3732 Plantation Area for future use / 1.4054 0.000 0.0000 undisturbed Total 1.4054 1.4054 1.4054 1.4 Pre-construction No Not Applicable. investigations e.g. bore houses, soil testing? 1.5 Construction works? No Required infrastructure already exists. 1.6 Demolition works? No Not Applicable. 1.7 Temporary sites used No Not Applicable. for construction works or housing of construction workers? 1.8 Above ground Yes At the end of life of mine, the excavated pit buildings, structures or will be 1.0322Ha, in which 0.8917 Ha will be earthworks including reclaimed with stacked dumping and linear structures, cut overburden and rehabilitated by plantation and and fill or excavations the remaining part 0.1405 Ha will be used as a water pond. It is estimated that around 10540.5 tonnes of topsoil will be generated, which will be properly stacked and will be utilized for 15 plantation. 1.9 Underground works No Not Applicable. including mining or tunneling? 1.10 Reclamation works? Yes At the end of life of mine, the excavated pit will be 1.0322Ha, in which 0.8917 Ha will be reclaimed with stacked dumping and overburden and rehabilitated by plantation and the remaining part 0.1405 Ha will be used as a water pond. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and Yes Maximum production proposed is 40,000 tons. manufacturing The mining will be done by open cast method. processes? The bench height and width proposed will be 5.0m (2.50mX 2 sub benches) &5m.To minimize the impacts of drilling and blasting, latest technology will be implemented. Excavated material shall be transported to the crushing unit for further processing. The ultimate depth of working mine estimated to be 60m above MSL. 1.14 Facilities for storage Yes The finished material and overburden will be of goods or materials? stored outside the lease area. 1.15 Facilities for treatment Yes Solid waste: A total quantity of 10540.5 tons or disposal of solid of topsoil and 21072 tons of mine waste will waste or liquid be removed during the mining operations. effluents? Topsoil excavated from the quarry will be stacked at predetermined place and subsequently will be utilized for plantation. Mine waste material will be backfilled. Liquid Effluent The sewage to the tune of 0.34 KLD generated from the mine office will be treated through septic tank & soak pit. 16 1.16 Facilities for long term Yes Facilities for long term housing of operational housing of operational workers are provided in the quarry. workers? 1.17 New road, rail or sea Yes Existing facilities will suffice for the purpose traffic during of mining activity. construction or operation? 1.18 New road, rail, air Yes Existing facilities will suffice for the purpose waterborne or other of mining activity. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion No Not applicable of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not applicable. transmission lines or pipelines? 1.21 Impoundment, No Not applicable damming, culverting, realignment or other changes to the hydrology of water courses or aquifers? 1.22 Stream crossings? No Nil 1.23 Abstraction or Yes The water to the tune of 0.40 KLD will be transfers of water form drawn from open well and bore well for ground or surface domestic purpose. waters? 1.24 Changes in water No The change in the land surface due to bodies or the land quarrying will not affect the surface drainage surface affecting in the surrounding area. 17 drainage or run-off? 1.25 Transport of personnel Yes Transport of materials is being made through or materials for tippers & trucks. Personnel to the work area construction, operation are being transported by the public / personal or decommissioning? conveyance or conveyance will be provided by the Company. 1.26 Long-term Yes At the end of the life of mine, excavated pit dismantling or will be reclaimed and rehabilitated with native decommissioning or species and partly will be used as a water restoration works? pond.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages20 Page
-
File Size-