NW-29 Final FSR Damodar River

NW-29 Final FSR Damodar River

Consultancy Services for preparation of Two Stage Detailed Project Report (DPR) of National Waterway 92, Cluster - I: Damodar River FINAL FEASIBILTY REPORT Inland Waterway Authority of India Cluster – I : Damodar River Final Feasibility Report Revision 0 November 2016 Consultancy Services for preparation of Two Stage Detailed Project Report (DPR) of National Waterway 29, Cluster - I: Damodar River FINAL FEASIBILITY REPORT Project IWAI Cluster-I, Damodar River Owner IWAI, Ministry of Shipping Consultant Egis India Consulting Engineers Authors Project No: PT/EIPTIWB003 Project Team : Team Leader + 7-Experts Report No: Technical Manager: PT/EIPTIWB003/2016/FR/002 Ashish Khullar Approved by: Project Manager: Akshat Singhal Dr. Jitendra K. Panigrahi 0 Feasibility Report Nov 2016 DM AK JKP Revision Description Date Prepared By Checked By Approved By Version : Classification: Restricted Final Report Distribution Digital Number of copies IWAI 3 Consultancy Services for preparation of Two Stage Detailed Project Report (DPR) of National Waterway 29, Cluster-1: Damodar River TABLE OF CONTENTS ACKNOWLEDGEMENT ................................................................................................................. 1 SALIENT FEATURES .................................................................................................................... 2 1.0 CONTEXT .................................................................................................................. 5 2.0 OBJECTIVE ............................................................................................................... 8 3.0 REPORT STRUCTURE.............................................................................................. 10 4.0 INTRODUCTORY CONSIDERATIONS ..................................................................... 12 4.1 Details Of National Waterway 29 (Damodar River) ........................................................... 12 4.2 Characteristics of damoder River ..................................................................................... 12 4.3 Methodology Adopted to Undertake Study ....................................................................... 15 4.3.1 Classification of Waterways .......................................................................... 15 4.3.2 Measures to Improve the Depth ................................................................... 17 4.3.3 IWT Terminal Planning ................................................................................ 20 4.3.4 Identification of IWT Terminals .................................................................... 21 4.3.5 Rapid EIA ................................................................................................... 23 4.3.6 Concept Design and Cost Estimates .............................................................. 23 4.3.7 Financial and Economic Analysis ................................................................... 23 4.3.8 Implementation & Monitoring Mechanism ..................................................... 24 5.0 COLLECTION AND REVIEW OF DATA ..................................................................... 25 5.1 Primary Data.................................................................................................................. 25 5.2 Review of Secondary data .............................................................................................. 26 6.0 ANALYSIS OF PRESENT STATE OF AFFAIRS .......................................................... 31 6.1 Existing Dams, barrage & Locks ...................................................................................... 31 6.2 Existing Bridges along the Waterway ............................................................................... 31 6.3 Existing High Tension Lines ............................................................................................ 32 6.4 Hindrances/ Encroachment along the Waterway .............................................................. 32 6.5 Forest Area / Protected Area / Defence Area .................................................................... 33 6.6 Road and Rail Infrastructure ........................................................................................... 34 Final Feasibility Report Page II of V Rev. 0 - Nov 2016 Consultancy Services for preparation of Two Stage Detailed Project Report (DPR) of National Waterway 29, Cluster-1: Damodar River 7.0 RECONNAISSANCE SURVEY ................................................................................... 35 7.1 Detail Methodology for Survey ........................................................................................ 35 7.1.1 Resource for Survey Work ........................................................................... 36 7.1.2 Geodetic Parameters ................................................................................... 37 7.1.3 Survey Data Processing ............................................................................... 38 7.2 Description of Bench Marks/ Reference Levels ................................................................. 39 7.3 Levelling of Temporary Tide Poles ................................................................................... 39 7.4 Hydrograpic Survey ........................................................................................................ 40 7.5 Water Depth .................................................................................................................. 40 7.6 Soil Characteristics ......................................................................................................... 41 7.7 Tidal Waterway Section .................................................................................................. 42 8.0 MARKET ANALYSIS ................................................................................................ 43 8.1 Land Use Pattern ........................................................................................................... 43 8.2 Crops /Agriculture products ............................................................................................ 43 8.3 Availability of Passenger Ferry Services ........................................................................... 44 8.4 Existing Jetties and Terminals ......................................................................................... 45 8.5 Prominent places along the Waterway ............................................................................. 45 8.6 Historical and tourist place along the waterways .............................................................. 45 8.7 Availability of Construction Material ................................................................................. 46 8.8 Industries along the waterway ........................................................................................ 46 8.9 Existing water sport and recreational activities and future probability ................................ 47 8.10 Estimated Cargo movement ............................................................................................ 47 9.0 OBSERVATION AND INFERENCE ............................................................................ 50 9.1 Waterway ...................................................................................................................... 50 9.2 Least Available Depth (LAD) ........................................................................................... 50 9.3 Cross - structures ........................................................................................................... 51 9.4 SWOT Analysis ............................................................................................................... 51 9.5 Summary ....................................................................................................................... 53 4.4 Critical areas requiring detailed investigations .................................................................. 53 4.5 Survey and Investigations required for stage – II studies ................................................. 54 9.6 Way Forward: Waterway Development ............................................................................ 55 Final Feasibility Report Page III of V Rev. 0 - Nov 2016 Consultancy Services for preparation of Two Stage Detailed Project Report (DPR) of National Waterway 29, Cluster-1: Damodar River LIST OF TABLES Table 1: National Waterways of Cluster - 1 .................................................................................................... 6 Table 2: Description of Rivers/ Canals ......................................................................................................... 12 Table 3: Details of existing Major Road and Rail Bridges over Damodar River ................................................ 31 Table 4: Details of Existing High Tension Lines ............................................................................................ 32 Table 5: Details of Hindrances / Encroachment along the Waterway ............................................................. 33 Table 6: Railway station within 5.0 Km radius of Damodar River ................................................................... 34 Table 7: Major Road crossing or within 5.0 Km radius of Damodar Waterway ................................................ 34 Table 8: List of Equipment Mobilised for Survey ..........................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    114 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us