Subject: Highway Works Programme 2011/12

Subject: Highway Works Programme 2011/12

To: Tonbridge and Malling Joint Transportation Board By: KCC Highways, Transportation & Waste Date: Subject: Highway Forward Works Programme – 2019/20 onwards Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2019/20. Kent County Council has agreed a substantial increase in the budget for planned highway works over the next three years, and as a result we are still in the process of identifying and designing schemes for inclusion in our full Year One to Two (2019/20 and 2020/21) and Year Three to Five (2021/22 to 2023/24) programmes. Because of this, we have decided to publish an interim programme, and to publish the full programmes later this year. For some assets this interim programme covers approximately the first six months of 2019/20, whilst for others it includes most of the works planned for the whole year. This programme is subject to regular review and may change for a number of reasons including budget allocation, contract rate changes, and to reflect KCC’s changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase. Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Externally funded schemes Local Growth Fund Developer Funded Works – see Appendix E Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members’ information. Contact Officers: The following contact officers can be contacted on 03000 418181 Kirstie Williams Highway Manager Mid Kent Mark Simmons Tonbridge and Malling District Manager Alan Casson Strategic Asset Manager Earl Bourner Drainage & Structures Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Jamie Hare Development Agreements Manager Jamie Watson Schemes Programme Manager Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes. Surface Treatments - Contact Officer Jonathan Dean Micro Surfacing Road Name Parish Extent of Works Current Status Aldon Lane Addingon Whole Road Completed Programmed to From A227 Hadlow Road A26 Cannon Lane Tonbridge commence on 14th East to B2017 Tudeley Lane June 2019 Programmed to A26 Vale Rise / From A227 Hadlow Road Tonbridge commence on 14th Woodgate Way East to B2017 Tudeley Lane June 2019 Programmed to From Blackmans Lane to A26 Tonbridge Road Hadlow commence on 10th Hadlow June 2019 Programmed to A26 Maidstone Harrow Lane to 2019 Hadlow commence on 10th Road Surface Dressing June 2019 From A228 Seven Mile Lane Programmed to A26 Maidstone Mereworth roundabout to 2017 commence on 17th Road resurfacing June 2019 Programmed to A26 Hadlow Road From Three Elms to Cuckoo Tonbridge commence on 10th East Lane June 2019 Programmed to Borough Green From Kemsing Road to A227 Wrotham commence on 26th Road Wrotham bypass June 2019 Programmed to From Telephone Exchange Bull Lane Eccles commence on to Rowe Place Farm 1st July 2019 Programmed to Bull Lane / High From White Hill Roundabout Wrotham commence on 27th Street to High Street June 2019 Programmed to Castle Street Tonbridge Whole road commence on 26th June 2019 Programmed to Fernbank Close Walderslade Whole road commence on 4th July 2019 From A227 Shipbourne Forest Grove Tonbridge To be programmed Road to end Slip road to and from Service Hadlow Road East Hadlow To be programmed Station on A26 Programmed to Heron Road Larkfield Whole road commence on 30th June 2019 Programmed to Judd Road Tonbridge Whole road commence on 25th June 2019 Programmed to Legge Lane Birling Whole road to end commence on 2nd July 2019 Programmed to From Leybourne Way to Lunsford Lane East Malling commence on 29th Great Lunsford Farm June 2019 Programmed to From Branbridges Lane to Old Road East Peckham commence on 20th Snoll Hatch Lane June 2019 Programmed to From High Street / Bull Lane Pilgrims Way Wrotham commence on 28th to end June 2019 Programmed to From Hollow Lane to Legge Snodland Road Snodland commence on Lane 2nd July 2019 Programmed to From Hatches Lane to Old Snoll Hatch Road East Peckham commence on 24th Road June 2019 Programmed to Whole road from M20 Station Road Ditton commence on 27th overbridge to A20 June 2019 Programmed to From Swanton Valley to The Hurst Plaxtol commence on 19th Adams Well Farm June 2019 Programmed to White Hill Wrotham Whole road to end commence on 27th June 2019 Surface Dressing Road Name Parish Extent of Works Current Status A26 Maidstone From A228 roundabout to Hadlow Est completion Road Hadlow August 2019 A26 Tonbridge Road Mereworth From Danns Lane to A228 Est completion August 2019 From B2017 Tudeley Lane A26 Woodgate Way Tonbridge Est completion heading north 400 metres August 2019 From B2017 Tudeley Lane Est completion A26 Woodgate Way Tonbridge to A2014 Pembury Road August 2019 From Teston Road to Seven Est completion Comp Lane Offham Mile Lane August 2019 From Comp Lane to The Est completion Long Mill Lane Platt Hurst August 2019 Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status A229 Bluebell Hill Aylesford Various sections Completed Between Brook Street To be programmed A26 Quarry Hill Road Tonbridge Roundabout to A2014 late 2019 Pembury Road Roundabout From Robin Hood Lane to To be programmed Tunbury Road Aylesford KCC Border late 2019 A228 Ham Hill Roundabout circulation area Snodland Completed Roundabout and approaches A228 East Peckham From Hale Street Roundabout To be programmed East Peckham By Pass to Hop Farm Roundabout late 2019 Pedestrian crossing near to the junction of Town Acres To be programmed The Ridgeway Tonbridge and junction with A26 Hadlow late 2019 Road Footway Improvements – Contact Officer Mr Neil Tree Entire Length Completed The Close Ightham (Footway Protection) Entire Length Programmed for Henham Gardens East Peckham (Footway Protection) week commencing 24th June 2019 Entire Length Programmed for Whitebine Gardens East Peckham (Footway Protection) week commencing 24th June 2019 Entire Length Programmed for Stacey Road Tonbridge (Footway Protection) week commencing 10th June 2019 Appendix B – Drainage Repairs & Improvements Drainage Repairs & Improvements - Contact Officer Earl Bourner Road Name Parish Description of Works Current Status On hold in discussion with New system being installed in Queens Estates as London road Aylesford two phases on hold awaiting final Private Land consent from the Queens Estate required to complete this job. Broadwater Pond Clearance and drainage Job pack submitted, West Malling Road improvements waiting on start date Appendix C – Street Lighting Structural testing of KCC owned streetlights has identified the following as requiring. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement. Street Lighting Column Replacement – Contact Officer Sue Kinsella Road Name Parish Description of Works Status Sheraton Court STRUCTURAL REPLACEMENT Completion by end Walderslade JSEN001 of July 2019 New Road Completion by end Ditton STRUCTURAL REPLACEMENT JNAJ003 of July 2019 New column STRUCTURAL REPLACEMENT Station Road installed, additional Ditton JSDI005 electrical works required. Completion by end Waveney Road Replacement of 1no streetlight Tonbridge August 2019 JWAR014 complete with LED lantern Completion by end Nepicar De-illumination of 1no sign post August 2019 Roundabout Nepicar/Wrotham complete with LED Downflood JUAQ518 following RTC Complete Higham Lane Replacement of 2no streetlights Tonbridge JHBZ010 complete with LED lantern Covey Hall Road Snodland Structural replacement Complete JCEF301/302 Completion by end Papyrus Way Ditton Structural replacement of July 2019 JPDR504 Walderslade Completion by end Woods Walderslade Structural replacement of July 2019 Roundabout JWDX501/502/503 Complete High Street STRUCTURAL PROGRAMME Borough Green JHBO009 2018/19 Complete Three Elm Lane STRUCTURAL PROGRAMME Golden Green JTCN001 2018/19 STRUCTURAL PROGRAMME St Marys Road Tonbridge Complete 2018/19 JSCO513 Completion end Vale Road STRUCTURAL PROGRAMME Tonbridge July 2019 JVAC033 2018/19 Awaiting delivery STRUCTURAL PROGRAMME for special order Dry Hill Park Road Tonbridge 2018/19 ornate brackets Awaiting delivery Pippin Way, for special order Gibson Drive, ornate brackets Garden Way, Russet Way, STRUCTURAL PROGRAMME Lambourne Drive, Kings Hill 2018/19 Worcester Avenue, Townsend Square, Crabtree Close Appendix D – Transportation and Safety Schemes Casualty Reduction Measures The Schemes Planning & Delivery team is implementing schemes within Tonbridge and Malling, in order to meet Kent County Council’s (KCC) strategic targets (for example, addressing traffic congestion or improving road safety). Casualty reduction measures have been identified to address a known history of personal injury crashes. Current status correct as of 21/05/2019. CASUALTY REDUCTION MEASURES - identified

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us