Force Main No. 8 Replacement PROJECT NUMB

Force Main No. 8 Replacement PROJECT NUMB

CONTRACT DOCUMENTS TECHNICAL SPECIFICATIONS FOR CITY OF ST. PETE BEACH PROJECT NAME: Force Main No. 8 Replacement PROJECT NUMBER: 148404060 DATE ISSUED: April 2021 PROJECT OWNER: City of St. Pete Beach c/o Public Works Department 7581 Boca Ciega Dr St. Pete Beach, Florida 33706 727-363-9254 PREPARED BY: Kimley-Horn and Associates SHELBY N. HUGHES, P.E. 100 Second Avenue South, Suite 105N License No. 86419 St. Petersburg, Florida 33701 727-498-2585 Shelby.Hughes@Kimley -Horn.com CA#00000696 100 Second Avenue South, Suite 105N St. Petersburg, Florida 33701 727-498-2585 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP TABLE OF CONTENTS SECTION 1 – GENERAL 1.01 LOCATION OF THE WORK SITE AND ACCESS 1.02 SCOPE OF WORK 1.03 PROJECT SUMMARY 1.04 CONTRACT DRAWINGS AND SPECIFICATIONS 1.05 FIELD ENGINEERING 1.06 SAFEGUARDING SURVEY MARKS 1.07 INSPECTION AUTHORITY 1.08 PROJECT SCHEDULE 1.09 MATERIALS AND EQUIPMENT 1.10 MANUFACTURER 1.11 SAMPLES 1.12 EQUIVALENT QUALITY 1.13 MATERIAL AND EQUIPMENT DELIVERY AND STORAGE 1.14 SERVICE OF MANUFACTURER'S REPRESENTATIVE 1.15 CONTAMINANTS CONTAINMENT/DISPOSITION 1.16 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 1.17 MAINTENANCE OF STORM DRAINAGE SYSTEM 1.18 SPILL OR DISCHARGE OF WASTEWATER OR RECLAIMED WATER 1.19 SEQUENCE OF OPERATION 1.20 WORK IN STREETS AND HIGHWAYS 1.21 WORK IN PRIVATE PROPERTY TS-1 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 1.22 PERMITS 1.23 FIELD OFFICE AND APPURTENANT STRUCTURES 1.24 CONTRACTOR'S SIGN 1.25 MOBILIZATION 1.26 WATER PURCHASE 1.27 TRAFFIC CONTROL 1.28 TREE PROTECTION 1.29 TREE REMOVAL AND REPLACEMENT 1.30 UTILITIES 1.31 NEIGHBORHOOD NOTIFICATION 1.32 SHOP, FIELD, AND LABORATORY TESTING 1.33 SALVAGED MATERIALS SECTION 2 – PAY ITEM DESCRIPTIONS 2.01 SCOPE 2.02 ESTIMATED QUANTITIES 2.03 WORK OUTSIDE AUTHORIZED LIMITS 2.04 MEASUREMENT STANDARDS 2.05 AREA MEASUREMENTS 2.06 LUMP SUM ITEMS 2.07 PAY ITEM DESCRIPTIONS SECTION 3 – SUBMITTALS 3.01 GENERAL 3.02 CONTRACTOR RESPONSIBILITIES TS-2 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 3.03 SUBMITTAL NUMBERING 3.04 SUBMITTAL REVIEW SECTION 4 – AS BUILTS 4.01 MINIMUM AS-BUILT DRAWING STANDARDS FOR ALL AS-BUILT DRAWINGS 4.02 AS-BUILT DRAWINGS PREPARATION 4.03 AS-BUILT DRAWINGS SUBMITTAL SECTION 5 – CONCRETE, MASONRY, AND REINFORCING STEEL 5.01 GENERAL 5.02 PORTLAND CEMENT CONCRETE 5.03 REINFORCING STEEL 5.04 FIBROUS CONCRETE REINFORCEMENT 5.05 PLACEMENT OF REINFORCEMENT 5.06 PLACEMENT OF CONCRETE 5.07 CURING OF CONCRETE 5.08 FINISHING OF CONCRETE 5.09 CONCRETE BRICK 5.10 CLAY BRICK 5.11 MASONRY BLOCK 5.12 MORTAR 5.13 GROUT SECTION 6 – EXCAVATION AND BACKFILL 6.01 GENERAL 6.02 TRENCH SAFETY TS-3 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 6.03 WORK IN WETLANDS, MANGROVES, AND PRESERVATION AREAS 6.04 CLEARING AND GRUBBING 6.05 ROADWAY EXCAVATION 6.06 TRENCH EXCAVATION 6.07 STRUCTURE EXCAVATION 6.08 EXCAVATION OF UNSUITABLE MATERIAL 6.09 SHEETING, SHIELDING, AND SLOPING 6.10 DEWATERING 6.11 BORROW MATERIAL 6.12 BEDDING MATERIAL 6.13 STRUCTURAL SLAB BEDDING 6.14 BACKFILL MATERIAL 6.15 BACKFILL COMPACTION 6.16 BACKFILLING OF TRENCH 6.17 BACKFILLING STRUCTURES 6.18 BACKFILLING UNDER ROADWAYS 6.19 DISPOSING OF LEFTOVER MATERIAL 6.20 ADJACENT FACILITIES 6.21 TEMPORARY SUPPORTS 6.22 FLOWABLE FILL SECTION 7 – SURFACE RESTORATION 7.01 GENERAL 7.02 ROADWAY RESTORATION TS-4 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 7.03 TEMPORARY PAVEMENT 7.04 SHELL BASE 7.05 LIMEROCK BASE 7.06 CRUSHED (RECLAIMED) CONCRETE BASE 7.07 ASPHALTIC CONCRETE PAVEMENT 7.08 BRICK PAVEMENT 7.09 CURB AND GUTTER 7.10 CONCRETE SIDEWALK 7.11 HEXAGON BLOCK SIDEWALK 7.12 DRIVEWAY AND PARKING LOT 7.13 DRIVEWAY - ASPHALT 7.14 DRIVEWAY - CONCRETE 7.15 DRIVEWAY - PEAGRAVEL 7.16 DRIVEWAY - SHELL 7.17 GRASS 7.18 EXPANSION JOINT MATERIAL SECTION 8 – PAINTING 8.01 GENERAL 8.02 PAINTING SCHEDULES AND SYSTEMS SECTION 9 – PIPING MATERIALS: DUCTILE IRON PIPE AND FITTINGS 9.01 GENERAL 9.02 PIPE 9.03 FITTINGS TS-5 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 9.04 JOINTS – BURIED PIPE AND FITTINGS 9.05 JOINTS – EXPOSED PIPE AND FITTINGS 9.06 DETECTION 9.07 ZINC/EPOXY/FLUOROPOLYMER PROTECTIVE COATING SECTION 10 – PIPING MATERIALS: PVC PRESSURE PIPE 10.01 GENERAL 10.02 PIPE 10.03 FITTINGS 10.04 JOINTS 10.05 DETECTION 10.06 MARKINGS AND COLOR CODING 10.07 HARNESSING 10.08 INSPECTION AND TESTING SECTION 11 – PIPING MATERIALS: HDPE PRESSURE PIPE 11.01 SCOPE OF WORK 11.02 QUALIFICATIONS 11.03 POLYETHYLENE PRESSURE PIPE 11.04 JOINTS 11.05 DETECTION 11.06 IDENTIFICATION 11.07 INSTALLING POLYTHYLENE PRESSURE PIPE AND FITTINGS 11.08 INSPECTION AND TESTING SECTION 12 – PRESSURE PIPE CONSTRUCTION TS-6 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 12.01 GENERAL 12.02 DATA TO BE SUBMITTED 12.03 MATERIALS 12.04 CONNECTIONS TO EXISTING MAINS 12.05 CONSTRUCTION OPERATIONS 12.06 LAYING AND JOINTING PRESSURE PIPELINES 12.07 PIPELINE CLEANING 12.08 TESTING AND DISINFECTION OF PRESSURE PIPELINES 12.09 SURFACE RESTORATION AND MISCELLANEOUS SECTION 13 – DIRECTIONAL BORING OF PIPE 13.01 GENERAL 13.02 TESTING 13.03 QUALIFICATIONS 13.04 SUBMITTALS 13.05 MATERIALS 13.06 SITE CONDITIONS 13.07 DAMAGE RESTORATION & REMEDIATION 13.08 QUALIFICATIONS FOR REJECTION OF DIRECTIONAL BORE 13.09 PRODUCT LOCATING AND TRACKING 13.10 PRODUCT BORE HOLE DIAMETER 13.11 EQUIPMENT REQUIREMENTS 13.12 THRUST / PULLBACK REQUIREMENTS 13.13 INSTALLATION PROCESS 13.14 PIPELINE TESTING TS-7 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP SECTION 14 – JACKING AND BORING – NOT APPLICABLE TO PROJECT SECTION 15 – FLUSHING, TESTING AND DISINFECTION 15.01 WORK INCLUDED 15.02 REFERENCES 15.03 SUBMITTALS 15.04 QUALITY ASSURANCE 15.05 REGULATORY REQUIREMENTS 15.06 DISINFECTION CHEMICALS 15.07 FLUSHING AND PRESSURE TESTING – PIPING 15.08 DISINFECTION FOR WATER MAIN INSTALLATION 15.09 BACTERIOLOGICAL SAMPLING FOR WATER MAIN INSTALLATION 15.10 QUALITY CONTROL 15.11 CONNECTIONS TO EXISTING MAINS SECTION 16 – SANITARY SEWER BYPASS PUMPING 16.01 SCOPE OF WORK 16.02 PUBLIC IMPACTS 16.03 SUBMITTALS 16.04 EQUIPMENT 16.05 SITE CONDITIONS 16.06 ON-SITE MONITORING 16.07 OPERATIONS 16.08 DAMAGE RESTORATION & REMEDIATION TS-8 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP SECTION 17 – VALVES AND APPURTENANCES 17.01 GENERAL 17.02 TOOLS 17.03 GATE VALVES 17.04 PRESSURE SUSTAINING AND CHECK VALVE 17.05 BALL VALVES FOR PVC PIPE 17.06 BUTTERFLY VALVES 17.07 PLUG VALVES 17.08 VALVE ACTUATORS 17.09 AIR RELEASE VALVES 17.10 VALVE BOXES 17.11 CORPORATION COCKS 17.12 FLANGE ADAPTER COUPLINGS 17.13 FLEXIBLE COUPLINGS 17.14 HOSE BIBS 17.15 SLOW CLOSING AIR AND VACUUM VALVES 17.16 SURGE ANTICIPATOR VALVES 17.17 CHECK VALVES 17.18 HYDRANTS 17.19 RESTRAINING CLAMPS 17.20 TAPPING SLEEVES AND GATE VALVES 17.21 SINGLE ACTING ALTITUDE VALVES 17.22 INSTALLATION TS-9 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP 17.23 HYDRANT INSTALLATION 17.24 SHOP PAINTING 17.25 FIELD PAINTING 17.26 INSPECTION AND TESTING SECTION 18 – SANITARY SEWER CONSTRUCTION 18.01 GENERAL 18.02 DATA TO BE SUBMITTED 18.03 MATERIALS 18.04 CONNECTIONS TO EXISTING SANITARY SEWERS 18.05 CONSTRUCTION OPERATIONS 18.06 LAYING AND JOINTING PIPELINES 18.07 TESTING OF SEWER PIPELINES SECTION 19 – CEMENTITIOUS REHABILITATION 19.01 GENERAL NOTES 19.02 STRUCTURE PREPARATION 19.03 INFLOW AND INFILTRATION REMEDIATION 19.04 FINAL PREPARATION 19.05 CEMENTITIOUS LINER APPLICATION 19.06 MATERIAL ASSURANCE 19.07 QUALITY TESTING 19.08 WARRANTY TS-10 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP SECTION 20 – CCTV INSPECTION AND PIPE CLEANING – NOT APPLICABLE TO PROJECT SECTION 21 – CURED-IN-PLACE PIPE LINER (CIPP) – NOT APPLICABLE TO PROJECT SECTION 22 – PRECAST POLYMER CONCRETE STRUCTURES – NOT APPLICABLE TO PROJECT SECTION 23 – FIBERGLASS WET WELL OR MANHOLE LINER – NOT APPLICABLE TO PROJECT SECTION 24 – SUBMERSIBLE SEWAGE PUMPS – NOT APPLICABLE TO PROJECT SECTION 25 – PUMP STATION CONTROLS – NOT APPLICABLE TO PROJECT SECTION 26 – ELECTRICAL – NOT APPLICABLE TO PROJECT SECTION 27 – VARIABLE FREQUENCY DRIVES – NOT APPLICABLE TO PROJECT SECTION 28 – ODOR CONTROL SYSTEMS – NOT APPLICABLE TO PROJECT SECTION 29 – PRECAST CONCRETE BUILDING – NOT APPLICABLE TO PROJECT SECTION 30 – DIESEL DRIVEN GENERATOR WITH WEATHERPROOF ENCLOSURE - NOT APPLICABLE TO PROJECT SECTION 31 – MISCELLANEOUS EQUIPMENT - NOT APPLICABLE TO PROJECT SECTION 32 – STATE REVOLVING FUND (SRF) REQUIREMENTS - TS-11 Technical Specifications Table of Contents FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP NOT APPLICABLE TO PROJECT SECTION 33 – FRAC-OUT PLAN FOR SUBAQUEOUS CROSSINGS - NOT APPLICABLE TO PROJECT END OF SECTION TS-12 Technical Specifications Section 1 – General FORCE MAIN NO. 8 REPLACEMENT 2020-2021 CIP SECTION 1 - GENERAL 1.01 LOCATION OF THE WORK SITE AND ACCESS Force Main 8 currently runs from Lift Station No. 8 for approximately 1350 LF along 39th Ave and Poinsettia Dr and discharges to the existing gravity sewer at MH-297 at the intersection of 40th Ave and Poinsettia Dr. Access to the work sites shall be over streets, and walkways. Any damage to existing pavement surface and base or other surface improvements outside the Contract Pay Limits, attributable to the Contractor's activities, shall be restored to like-new condition by the Contractor at the Contractor's expense.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    142 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us