Second Downtown Dallas Light Rail Alignment – “D2”

Second Downtown Dallas Light Rail Alignment – “D2”

Creating Transit Options Empowers Discovery Gary Thomas President / Executive Director Dallas Area Rapid Transit October 21, 2016 Multimodal DART System • 120+ bus routes • 93 miles light rail • 35 miles commuter rail • Paratransit and vanpool • 107 million passenger trips annually 3 Current and Future Rail Services 4 Blue Line Extension UNT Dallas Station • Opening October 2016 photo o 3-mile extension o Ends at the University of North Texas at Dallas • Adds two new stations o UNT Dallas Station o Camp Wisdom Station • Renovated Ledbetter Station o Extended platforms o Improved lighting and Ledbetter Station visibility 5 Dallas Streetcar • Partnership between the city of Dallas and DART • 2.3-mile route • 6 Streetcar stops • Union Station to Bishop Arts District o Phase 1 opened April 2015 o Phase 2 opened August 2016 • Planned extensions include connection to the M-Line Trolley system 5 Cotton Belt 7 Second Downtown Dallas Light Rail Alignment – “D2” • Easing train crowding downtown will add capacity and on-time performance system wide • Much remains to be determined about the precise routing and other details 8 Platform Extensions • DART Stations constructed since 2004 accommodate 3-car trains • CBD stations modified in 2008-2009 • 28 Red & Blue line stations can accommodate only 2-car trains 5 Platform Extensions • Allow 3-car trains at each station • Increase passenger5 capacity by 33% • Add operational flexibility • Minimize passenger disruption 10 Comprehensive Operations Analysis • Evaluate overall transit service efficiency and effectiveness o Route structure o Bus service type and size • Results in comprehensive review of all transit service as a system • Culminates in the 10-year bus service plan, which is foundation for 2040 Transit System Plan 7 First Mile/Last Mile Partnerships • Partnerships will make DART more convenient • Apps are accessible through GoPass • Passengers can use DART in conjunction with these services 8 20-Year Financial Plan • Long-term projection of: o Operating revenues o Non-operating revenues and grants o Operating expenses o Capital expenditures • Evaluates the affordability of: o System expansion o State of good repair o Operations o Debt repayment 5 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us