Press Information Bureau Government of India *** India Signs an Agreement with World Bank for Credit of Us$ 360 Million for Utta

Press Information Bureau Government of India *** India Signs an Agreement with World Bank for Credit of Us$ 360 Million for Utta

PRESS INFORMATION BUREAU GOVERNMENT OF INDIA *** INDIA SIGNS AN AGREEMENT WITH WORLD BANK FOR CREDIT OF US$ 360 MILLION FOR UTTAR PRADESH WATER SECTOR RESTRUCTURING PROJECT PHASE-II New Delhi, October 25, 2013 Kartika 03, 1935 An agreement for credit of US$ 360 million (equivalent) from World Bank for the Uttar Pradesh Water Sector Restructuring Project Phase-II was signed here yesterday by Shri Nilaya Mitash, Joint Secretary, Department of Economic Affairs, Ministry of Finance on behalf of the Government of India and Mr.Onno Ruhl, Country Director, World Bank on behalf of the World Bank. Similarly the Project Agreement was signed by Shri Deepak Singhal, Principal Secretary, Department of Irrigation on behalf of the Government of Uttar Pradesh. The Objective of the project is to support the State Government on capacity building of Water Users Association (WUA), rehabilitation and modernization of Irrigation and Drainage systems, rehabilitation of dams, development of Basin River planning strategies, groundwater studies, knowledge base and flood management systems. The Project’s Development objective is to (a) strengthen the institutional and policy framework for integrated water resources management for the entire State; and (b) increase agricultural productivity and water productivity by supporting farmers in targeted irrigation areas. The project has six main components: Strengthening of State Level Water Institutions and Inter Sector Coordination Modernization and Rehabilitation of Irrigation and Drainage Systems Consolidation and Enhancement of Irrigation Institution Reforms Enhancing Agriculture Productivity and On-Farm Water Management Feasibility studies and Preparation Activities for the Next Phase Project Coordination and Monitoring. The closing date for the project is 31 October, 2020. ***** .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us