Community Engagement Plan Grand Calumet River and Indiana Harbor Canal February 24, 2015

Community Engagement Plan Grand Calumet River and Indiana Harbor Canal February 24, 2015

Community Engagement Plan Grand Calumet River and Indiana Harbor Canal February 24, 2015 East Chicago Waterway Management District East Chicago, Indiana In Partnership with the U.S. Environmental Protection Agency Great Lakes National Program Oce Chicago, Illinois CONTENTS 1 INTRODUCTION ....................................................................................................................................1 2 COMMUNITY INVOLVEMENT GOALS AND OBJECTIVES .....................................................3 2.1 Specific Community Involvement Activities ................................................................................6 2.2 Additional Outreach Activities .......................................................................................................9 3 THE PARTNERS ....................................................................................................................................11 3.1 East Chicago Waterway Management District ...........................................................................11 3.2 US EPA Great Lakes National Program Office ...........................................................................11 4 THE COMMUNITY ...............................................................................................................................13 4.1 East Chicago Community Profile .................................................................................................13 4.2 East Chicago Demographics ..........................................................................................................14 4.3 The Neighborhoods ........................................................................................................................17 5 THE PROJECT ........................................................................................................................................19 Table 1 Summary of Outreach Activities During Remediation Design, Construction and Future Use Actions ......................................................................................................................................8 Table 2 East Chicago Neighborhood Demographics ............................................................................17 Figure 1 East Chicago Neighborhoods and Profile .................................................................................18 Figure 2 The three areas that are part of the cleanup project: Lake George Canal, Indiana Harbor Canal and the Grand Calumet River Junction .............................................21 Appendix A Contacts and Resources Appendix B Templates i Community Engagement Plan 1 INTRODUCTION This Community Engagement Plan (CEP) of community engagement strategies that will was prepared to engage and support the be conducted during cleanup activities for the communities affected by the Grand Calumet project. The CEP also includes a timetable to River and Indiana Harbor Canal projects conduct these activities, a description of the in East Chicago, Indiana. The community Waterways and project, demographics and a engagement program is a coordinated community profile on the city of East Chicago. effort between the East Chicago Waterway A resource list of contacts, organizations and Management District (ECWMD) and the agencies is included in Appendix A. Templates U.S. Environmental Protection Agency’s that can be used to prepare public notices or Great Lakes National Program Office (US documents mailed to the public are included in EPA GLNPO) referred to as the Partnership Appendix B. in this document. The CEP will meet the informational needs of the community and The Partnership is committed to providing fulfill the community involvement activities meaningful opportunities for the community to outlined in the Project Agreement under the participate in the cleanup process and will use Great Lakes Legacy Act, which is to develop a community involvement activities outlined in mechanism/format to obtain public input on the Comprehensive Environmental Response, cleanup and restoration efforts. Liability and Compensation Act, or CERLCA and the National Contingency Plan as a guide. Tetra Tech prepared this CEP to guide the Partnership in their efforts to provide The Partnership will use the activities in this meaningful community engagement between document to involve and communicate with this partnership and the local community residents, businesses and local governments in interested in the cleanup and restoration the East Chicago area. of the Grand Calumet River and Indiana Harbor Canal. This CEP provides an outline Community Engagement Objectives Objectives of the community engagement program include: • Gathering input from the community on cleanup alternatives and future use of the Waterways. • Establishing effective methods of communication between the community and the Partnership. • Informing the community of the progress of project activities. • Providing adequate opportunities for the community to comment on the proposed cleanup alternatives and design documents. 1 Community Engagement Plan Grand Calumet River and Indiana Harbor Canal Community Engagement Plan 2 2 COMMUNITY INVOLVEMENT GOALS AND ACTIVITIES When establishing the objectives for a project- • Change planned activities, where specific community involvement program, warranted, based on community input. several factors including an assessment of the nature and extent of known or perceived • Update websites regularly and provide contaminants and known community concerns useful information on it for the community. and requests are considered. • Update East Chicago and local government To be effective, the community engagement officials on a periodic basis even if no program must be designed to meet the activities are occurring at the waterways. community’s need to know, give information in a timely manner and accommodate the • Hold community meetings, when community’s interests and its willingness to necessary, within the community to give all participate in decision-making processes. This residents an opportunity to attend. information must also be shared in a language the public can understand. This document as The Partnership will conduct the required well as fact sheets and other communication community engagement activities during this may need to be prepared in Spanish. project. The first outreach effort will be to schedule a public comment period and prepare To meet the needs of the community and a fact sheet explaining the cleanup alternatives to respond to information obtained during at the completion of the Feasibility Study when discussions with community members and at the proposed alternatives are available, which meetings, the following objectives have been is anticipated to be in the spring 2015. The established for community involvement efforts: second outreach effort involves reaching out to the community to get feedback on future • Enlist the support, coordination and use ideas for the Waterways and property involvement of local East Chicago officials surrounding the Waterways. This effort and community leaders. should coincide with the first outreach and be a continual effort throughout the project • Monitor citizen interest in the sites/projects work. We will develop a questionnaire and/ and respond accordingly. or survey to help gather comments and ideas from the community. We will also schedule • Keep the community well informed of community meetings or interviews during the ongoing and planned site activities. design phase to present the information to the community and give them an opportunity to • Explain technical site activities and findings ask questions. in an understandable format for residents. The activities described below will guide the • Get community input on key decisions. Partnership to (1) meaningfully and actively engage the community in decisions regarding the cleanup of the Grand Calumet River and 3 Community Engagement Plan the Indiana Harbor Canal, and (2) meet the interested parties request an extension community outreach goals identified in the to the public comment period, the Project Agreement. Partnership can review the request and determine if an extension is appropriate. Stakeholder Meetings If an extension is granted, a newspaper ad announcing the extension must be Meetings will be held with different published in the local newspapers. stakeholder groups as needed throughout » the project (see Table 1 on page 8 for planned A fact sheet outlining the proposed meetings). cleanup alternatives will be distributed to the community. This fact sheet should Public Comment Period be distributed via mail at least one week before the public comment period • The public will have an opportunity to begins. The fact sheet will include a self- comment on the cleanup alternatives addressed Public Comment Form that proposed in the Feasibility Study. residents may complete and mail back. » A newspaper ad announcing the public • A public notice will be issued at least one comment period will be published in the week before the community meeting to take local newspapers (see resource list) at comments on the Feasibility Study. least one week before the beginning of the public comment period. • The public notice and any other written material such as fact sheets will be written » The public comment period will be at in English and Spanish. least 30 days long. If residents or other East Chicago Mayor Anthony Copeland address the community during the public meeting where Ball State University

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us