7.8 Outline Business Case TR010021

7.8 Outline Business Case TR010021

Volume 7 Volume 7.8 Outline Business Case TR010021 APFP Regulation 5(2)(q) Revision 0 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 April 2016 Page 1 of 161 Silvertown Tunnel Outline Business Case Document Reference: 7.8 THIS PAGE HAS INTENTIONALLY BEEN LEFT BLANK Page 2 of 161 Silvertown Tunnel Outline Business Case Document Reference: 7.8 Silvertown Tunnel Outline Business Case 7.8 Planning Act 2008 Infrastructure Planning The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Document Reference: 7.8 Internal Code: ST150030-PLN-ZZZ-ZZ-DSD-ZZ-0084 Regulation Number: 5(2)(q) Author: Transport for London Rev. Date Approved By Signature Description 0 29/04/2016 David Rowe (TfL For DCO Lead Sponsor) Application Page 3 of 161 Silvertown Tunnel Outline Business Case Document Reference: 7.8 Contents List of Abbreviations .............................................................................................. 12 Glossary of Terms .................................................................................................. 16 SUMMARY ............................................................................................................... 21 1. INTRODUCTION ......................................................................................... 49 1.1 Description ................................................................................................... 49 1.2 The approach to the business case ............................................................. 49 1.3 Investment decision making process ........................................................... 50 1.4 The role of the Mayor of London and TfL .................................................... 52 1.5 River Crossings Programme ........................................................................ 52 1.6 Consultation to date on the Scheme ............................................................ 54 1.7 Structure of this report ................................................................................. 55 2. THE STRATEGIC CASE ............................................................................. 57 2.1 Introduction .................................................................................................. 57 2.2 Strategic policy context ................................................................................ 59 2.3 The transport and socio-economic overview and issues ............................. 63 2.4 Transport problem 1 – congestion ............................................................... 78 2.5 Transport problem 2 – closures and incidents ............................................. 83 2.6 Transport problem 3 – lack of network resilience ........................................ 85 2.7 Effects on the economy ............................................................................... 89 2.8 Effects on public transport ........................................................................... 96 2.9 Effects on the freight industry ...................................................................... 99 2.10 Environmental effects ................................................................................ 100 2.11 The problems now and in the future .......................................................... 100 2.12 Summary of the case for change ............................................................... 105 2.13 Scheme objectives .................................................................................... 107 2.14 Option development and assessment ....................................................... 108 2.15 Preferred Option – the Silvertown Tunnel concept .................................... 111 2.16 The role of road user charging ................................................................... 113 2.17 Stakeholders .............................................................................................. 115 Page 4 of 161 Silvertown Tunnel Outline Business Case Document Reference: 7.8 3. THE ECONOMIC CASE ............................................................................ 117 3.1 Introduction ................................................................................................ 117 3.2 Headline scheme benefits ......................................................................... 120 3.3 User charging and the economic case ...................................................... 123 3.4 Transport economic efficiency (TEE) ......................................................... 124 3.5 Public accounts (PA) ................................................................................. 127 3.6 AMCB results ............................................................................................. 129 3.7 Sensitivity tests .......................................................................................... 130 3.8 Distributional analysis ................................................................................ 136 3.9 Social Analysis .......................................................................................... 138 3.10 Wider Impacts ............................................................................................ 139 3.11 Regeneration ............................................................................................. 140 3.12 Appraisal Summary Table ......................................................................... 143 3.13 Value for money statement ........................................................................ 144 4. THE FINANCIAL CASE ............................................................................ 145 4.1 Introduction ................................................................................................ 145 4.2 Project costs .............................................................................................. 145 4.3 Financing ................................................................................................... 145 5. THE COMMERCIAL CASE ....................................................................... 147 5.1 Introduction ................................................................................................ 147 5.2 Proposed commercial structure ................................................................. 147 5.3 Risk transfer, pricing framework and payment and charging mechanisms 147 5.4 Procurement route ..................................................................................... 148 6. THE MANAGEMENT CASE ..................................................................... 149 6.1 Introduction ................................................................................................ 149 6.2 Evidence of similar projects ....................................................................... 149 6.3 Programme linkages .................................................................................. 149 6.4 Key project assumptions ........................................................................... 150 6.5 Governance, organisational structure and roles ........................................ 150 6.6 Independent peer review group ................................................................. 152 Page 5 of 161 Silvertown Tunnel Outline Business Case Document Reference: 7.8 6.7 Tunnel safety design and consultation group ............................................ 152 6.8 Programme/project plan ............................................................................ 152 6.9 Project team organisation and work streams ............................................. 153 6.10 Project management and administration ................................................... 154 6.11 Assurance and approvals plan .................................................................. 155 6.12 External stakeholders ................................................................................ 157 6.13 Consents ................................................................................................... 157 6.14 Project controls and reporting .................................................................... 157 6.15 Document management ............................................................................ 158 7. CONCLUSION .......................................................................................... 159 APPENDIX A APPRAISAL SUMMARY TABLE ................................................... 161 Page 6 of 161 Silvertown Tunnel Outline Business Case Document Reference: 7.8 List of Tables Summary Table 1: Summary economic results (£m, PV) ......................................... 31 Summary Table 2: Summary economic results (initial) by users (£m, PV) ............... 32 Summary Table 3: Summary economic results (adjusted for reliability benefits) by users (£m PV) .......................................................................................................... 33 Summary Table 4: Summary net user benefits (initial) by users (£m PV, London VoT) ......................................................................................................................... 33 Summary Table 5: Summary net user benefits (adjusted for reliability) by users (£m PV, London VoT) ...................................................................................................... 33 Summary Table 6: Scenario % change in population and employment forecasts from 2012 base case .......................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    162 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us