LUFKIN DISTRICT DISTRICT PROFILE The Lufkin District plans, designs, builds, operates and maintains the state transportation system in its nine counties. The district primarily conducts asset preservation and hazard elimination projects to ensure the safety of the traveling public. FAST FACTS (FY 2021): Population 318,205 Area (Sq. Miles) 7,113 Lane Miles 6,620 District Engineer: Daily Vehicle Miles 8,701,947 Kelly O. Morris, P.E. Registered Vehicles 319,715 TxDOT Employees 266 Construction/Maintenance Expenditures $153,550,396 Physical/Mailing Address: Percentage of Highway Projects 1805 N. Timberland Drive 87% Completed On Time (with change orders) Lufkin, TX 75901 Percentage of Highway Projects PH: (936) 634-4433 Completed Under Budget (with change 96% orders) Fax: (936) 633-4378 KEY PROJECTS UNDERWAY: PLANNED KEY PROJECTS: • US 59/Loop 224 South (Nacogdoches • US 59 Redland Upgrade (Angelina Co.): Construct Counties: Co.): Construct US 59 direct connectors, frontage roads from north SL 287 to FM 2021 - $52.5M Angelina, Houston, Nacogdoches, Polk, Sabine, overpass at Spradley Street and frontage • US 59 Shepherd to Cleveland Upgrade (San Jacinto San Augustine, San Jacinto, roads along SL 224 from SH 7 to BU 59 - Co. and Liberty Co.): Construct frontage roads from Shelby and Trinity $86.2M FM 2914 to 0.65 mi south of SL 573 - $116 million • US 69 Trunk System (Angelina Co.): • US 59 Corrigan Relief Route (Polk Co.): Construct Widen to a 4-lane divided highway (FM new location freeway - $171.5 million State Senator: 1270 to Jasper County line) - $37.4M • US 59/US 259 North (Nacogdoches Co.): Construct Sen. Robert Nichols • US 69 Trunk System (Angelina Co.): interchange and frontage roads from FM 343 to just Widen to a 4-lane divided highway (FM north of US 59/US 259 intersection - $108M State Representatives: 844 to FM 1270) - $71.6M • US 59 Shepherd to Trinity River (San Jacinto Co.): Rep. Trent Ashby • US 59 Diboll Relief Route (Angelina Construct frontage roads from FM 223 to Trinity River - Rep. Travis Clardy Co.): Construct new location freeway - $213M Rep. Ernest Bailes $140.9M • US 259 Center Turn Lane (Nacogdoches Co.): Rep. Chris Paddie Rep. James White • US 59 Moffett to SH 103 (Angelina Widen roadway to provide two-way center turn lane Co.): Construct frontage roads and from SH 204 to Rusk County Line - $32.3M widen mainlane bridge from Moffett Road • US 96 Super 2 (Sabine Co.): Widen road to add U.S. Senators: to SH 103 - $19.3M passing lanes from FM 83 to Spur 414- $6.9M Sen. John Cornyn • US 190 Center Turn Lane (Polk Co.): Widen road to Sen. Ted Cruz provide two-way center turn lane from Livingston to 4 mi west of FM 1276- $29M U.S. Representatives: MAINTENANCE: The Lufkin District spends approximately $9.5 million annually on seal coat Rep. Kevin Brady projects. It will spend several million in FY 2021 rehabilitating roadways throughout the district. Rep. Louie Gohmert CONSTRUCTION: In FY 2021, the district will let more than $112 million on construction projects Rep. Brian Babin including: bridge replacements, overlays, sidewalks, road rehabilitating and widening, etc. CORRIDORS: The Lufkin District’s priority corridor effort is the development of I-69 along US 59 and US 84 and Super 2 improvements along US 96 and US 190. Revised 01/2021 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-