Changed with the DEMO VERSION of CAD-KAS PDF-Editor (

Changed with the DEMO VERSION of CAD-KAS PDF-Editor (

Page 1 Annexure - I LIST OF COMPLETED PROJECTS AGAINST WHICH COMPLETION CERTIFICATES SUBMITTED TO MINISTRY OF DoNER. (Rs. in crore) Sl. SECTOR/NAME OF PROJECT ESTIMATED Year of Funds Remarks No. SANCTIONED COST Sanction Released. 1 2 3 4 5 6 PH & WS: 1 Water Supply scheme at Itanagar 10.590 1998-99 10.590 Completion Certificate submitted. 2 Special Restoration of Water Supply 2.000 1999-2000 2.000 Completion Certificate submitted. facilities at Tezu. 3 Water Supply scheme at Along. 3.370 1999-2000 3.021 Completion Certificate submitted. 4 Water Supply scheme at Pasighat 5.050 1999-2000 4.850 Completion Certificate submitted. 5 Water Supply scheme at Roing 4.050 1999-2000 3.829 Completion Certificate submitted. 6 Naharlagun- Nirjuli Water Supply scheme. 11.730 2002-03 11.040 Completion Certificate submitted. 7 Improvement and extension of water 4.883 2006-07 4.266 Completion Certificate submitted to supply at Lumla township. DoNER on 03.10.2012. 8 Bomdila Water Supply Scheme. (West 17.090 2002-03 15.435 Completion submitted to DoNER on Kameng District) 22.01.2013. 9 Water Supply Project for Daporijo 3.970 2002-03 3.666 town, (Upper Subansiri District). IFCD: 10 Flood Control work at Sisiri and Dibang to 7.470 1999-2000 7.470 Completion Certificate submitted. protect Bizari 11 Anti Erosion work at Noa-Dehing to protect 6.876 1999-2000 6.876 Completion Certificate submitted. Namsai and Lekang Circle 12 Anti Erosion work of Tirap river from 4.450 1999-2000 4.450 Completion Certificate submitted. Phangtip to Kutchep-I Changed with13 Flood the DEMO Protection VERSION work on right of bank CAD-KAS of PDF-Editor7.486 1999-2000 (http://www.cadkas.com). 7.486 Completion Certificate submitted. Siang river to protect Pasighat township. 14 Flood Protection work on Sipu and Siyom 7.190 1999-2000 7.190 Completion Certificate submitted. river to protect Along Township. 15 Flood Protection work at Siyom river to 5.470 1999-2000 5.470 Completion Certificate submitted. protect Roing Gaki Cultivation area at Jumlo. 16 Anti Erosion work on Siyom river to protect 4.147 1999-2000 4.147 Completion Certificate submitted. Donyi Polo Govt. College, Kamki. 17 Flood Protection work to protect Dirang 3.234 1999-2000 3.234 Completion Certificate submitted. township. 18 Anti Erosion works on Kley River (L 0.709 1999-2000 0.709 Completion Certificate submitted. Subansiri District) 19 Flood Control work at Dibru river at 2.150 1999-2000 2.150 Completion Certificate submitted. Seijosa. 20 Anti Erosion works to protect Sagalee 2.600 1999-2000 2.600 Completion Certificate submitted. Changed withtownship the DEMO VERSION of CAD-KAS PDF-Editor (http://www.cadkas.com). 21 Anti Erosion works to protect Yingkiong 2.100 1999-2000 2.100 Completion Certificate submitted. township 22 Anti Erosion works at Deopani river to 2.300 1999-2000 2.300 Completion Certificate submitted. protect Roing township. 23 Flood Control Works on right bank of 1.437 1999-2000 1.437 Completion Certificate submitted. Dikrong river to protect NH-52A near Nirjuli. 24 Treatment of Aba river basin at Old Abali 2.980 1999-2000 2.980 Completion Certificate submitted. village Changed with the DEMO VERSION of CAD-KAS PDF-Editor (http://www.cadkas.com). Page 2 Sl. SECTOR/NAME OF PROJECT ESTIMATED Year of Funds Remarks No. SANCTIONED COST Sanction Released. 1 2 3 4 5 6 25 Anti Erosion works on Kley River (L 7.310 2001-02 6.930 Completion Certificate submitted. Subansiri District) PWD: 26 Maintenance of Foot Track & Suspension 1.000 1999-2000 1.000 Completion Certificate submitted. Bridges. 27 Construction of Porter Track from 2.590 2003-04 2.550 Completion Certificate submitted. Nuranang to Mago. 28 Improvement and realignment of porter 2.550 2002-03 2.550 Completion Certificate submitted. track from Jang to Sulungthi. 29 C/o Permanent Suspension bridge over 7.640 2005-06 6.678 Completion Certificate and re-imbursement river Siyom at Paksing (122 mtr) (West claim for Rs. 19.42 lakh forwarded to Siang District) DoNER on 15.02.2012. 30 C/o Tamen Tali Road via Yarkum (60 KM) 8.981 2008-09 7.925 Completion Certificate submitted to (Ph-I) 0.00-49.00 KM. DoNER on 19.03.2012. 31 C/o road from Sangram to Phassang- 8.817 2008-09 7.779 Completion certificate forwarded to DoNER Pallang via Nyapin (SDO HQ) Ph-I. on 13.04.2012. Contingency claim for Rs. 15.56 lakh submitted to DoNER on 27.09.2012. 32 C/O road from Lhou Nallah to Mukto CO 18.030 2005-06 15.754 Completion certificate forwarded to DoNER Hq. via Gomkeling and Serjong (15 KM) on 16.05.2012. PH-I 0-5 KM, Tawang 33 Improvement of Porter Track from Tungri 3.106 2003-04 2.714 Completion Certificate submitted to to Mago (West Kameng District) DoNER on 01.06.2012. 34 C/o road from Nafra to Nakhu- Nachiban 7.540 2005-06 6.786 Completion Certificate submitted to village (11 KM). DoNER on 01.06.2012. 35 Improvement of Palizi to Thrizino Road (17 7.440 2005-06 6.695 Completion Certificate submitted to Changed withKM.) the West DEMO Kameng. VERSION of CAD-KAS PDF-Editor (http://www.cadkas.com).DoNER on 01.06.2012. 36 Road from NH-52A Nirjuli to Sagalee (SH: 21.869 2005-06 19.146 Completion certificate forwarded to DoNER Doimukh to Toru (45 KM). (Papum Pare vide letter No. PD(NLP)05/2005 dated District) 28.06.2012. 37 Improvement / C/o road from Sagalee to 42.887 2005-06 37.552 Completion certificate forwarded to DoNER Sakiang (50 KM.) (Papum Pare) on 28.06.2012. 38 Restoration and Upgradation of 32 KM 13.999 2008-09 12.353 Completion certificate submitted to DoNER internal road at Ziro township. on 10.01.2013. 39 C/o Wak Liromoba Road (78 KM) Phase-I 6.600 2008-09 5.824 Completion certificate submitted to DoNER (15 KM) on 07.03.2013. 40 Construction of Namsang - Khela road 4.947 2009-10 3.527 Completion certificate submitted to DoNER (45.30 KM) vide letter No. PD(NLP)04/2008 dated 09.03.2013. 41 Improvement / upgradation of Menga - 3.570 2005-06 3.211 Completion certificate forwarded to DoNER Giba Road ( 8 KM ) (Upper Subansiri) on 17.06.2013. However, the Deptt. Is to submit UC for balance fund of Rs.0.803 Changed with the DEMO VERSION of CAD-KAS PDF-Editor (http://www.cadkas.com).lakh. EDUCATION: 42 Furniture for 1557 Primary and Middle 1.630 2001-02 1.630 Completion Certificate submitted. Schools and Hostels. 43 R.K. Mission School, Narrottom Nagar in 12.200 2001-02 12.200 Completion Certificate submitted. Tirap District. 44 Ramakrishna Sarada Mission Girls School 3.000 2001-02 3.000 Completion Certificate submitted. at Khonsa, Tirap district. 45 Infrastructure Dev for VK V, Koloriang. 0.800 2001-02 0.800 Completion Certificate submitted. 46 C/o Academic Block of Arunachal Pali 0.590 2002-03 0.590 Completion Certificate submitted. Vidyapeeth-Phase-I. Changed with the DEMO VERSION of CAD-KAS PDF-Editor (http://www.cadkas.com). Page 3 Sl. SECTOR/NAME OF PROJECT ESTIMATED Year of Funds Remarks No. SANCTIONED COST Sanction Released. 1 2 3 4 5 6 47 Infrastructure development of NERIST. 40.000 2002-03 24.000 The project has been directly monitored by the Ministry of HRD. 48 C/o Academic Block of Arunachal Pali 0.810 2004-05 0.810 Completion Certificate submitted. Vidyapeeth (Phase-II) 49 Financial Assistance for completion of 532 14.480 1999-2000 5.540 Ministry of DONER vide F.No. incomplete school Buildings, Teachers DNER/NLP/AP/ 20/2002 dated 05.12.2006 Quarter and Hostel. has closed the project. 50 Infrastructure development of 275 5.820 2001-02 5.510 Completion certificate submitted Community schools running pre-primary classes in villages. 51 Sarva Shiksha Abhiyan (2005-06) 8.200 2005-06 8.200 Completion certificate submitted 52 Sarva Shiksa Abhiyan (2006-07) 14.288 2006-07 14.287 Completion certificate submitted 53 Construction of 150 boarders hostel at 0.950 2005-06 0.830 Completion Certificate submitted to Koloriang HS school. DoNER on 21.03.2012. 54 Hostel Buildings for 110 Primary and 22.000 2002-03 22.000 Completion Certificate submitted to Middle Schools (All Districts) DoNER on 21.03.2012. 55 RK Mission School at Along 2.560 1998-99 2.182 Completion Certificate submitted. 56 Opening of Ramakrishna Sarada Mission 5.881 2007-08 5.188 Completion Certificate submitted to School for Girls at Khaso (Dirang) DoNER on 30.04.2012. 57 Vivekananda Kendra Vidyalaya, Kitpi in 5.210 2005-06 4.552 Completion Certificate submitted to Tawang District. DoNER on 30.04.2012. POWER: 58 2X5 MVA S/S at Naharlagun 1.690 2000-01 1.690 Completion Certificate submitted. 59 2X3.15 MVA S/S at Nirjuli 1.430 2000-01 1.430 Completion Certificate submitted. 60 Rural Electrification of 60 Nos. Tribal 8.960 2000-01 8.960 Completion Certificate submitted. villages. Changed with61 the DEMO VERSION of CAD-KAS PDF-Editor (http://www.cadkas.com). 62 Sub-Transmission & Distribution -33 KV 0.680 2002-03 0.300 Physically completed. Financial liabilities Express Line from Tago-Old Ziro.(Lower to be cleared. The Ministry has been Subansiri District) requested to release the balance fund of Rs.38.00 lakh vide letter No. PD(PMC)22/ 2003 dated 04.08.2008. Reminder sent on 13.2.2009.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us