UNDP South Sudan Protected Areas Network Final Evaluation Report.Pdf

UNDP South Sudan Protected Areas Network Final Evaluation Report.Pdf

Terminal Evaluation Report UNDP GEF Protected Area Network Management & Building Capacity in Post-Conflict South Sudan Terminal Evaluation Report February 2018 Protected Area Network Management & Building Capacity Protected Area Network Management & Building Capacity in Post-Conflict South Sudan GEFin ProjectPost-Conflict ID: 3748; UNDP South PIMS Sudan ID: 4000 Country: South Sudan Region: Africa Focal Area: Biodiversity (GEF-4) Implementing Agency: United Nations Development Programme Executive: Ministry of Wildlife Conservation & Tourism of the Government of South Sudan Implementing Partner: Wildlife Conservation Society Project Timeframe: June 2011 - Dec 2016 Prepared by: Richard Sobey, International Consultant / Team Leader Philip Deng, National Consultant Protected Area Network TE (UNDP PIMS #4000 / GEF #3748) Terminal Evaluation Report UNDP GEF Protected Area Network Management & Building Capacity in Post-Conflict South Sudan Terminal Evaluation Opening Page Project Name: Protected Area Network Management & Building Capacity in Post- Conflict South Sudan GEF Project ID: 3748 UNDP PIMS ID: 4000 Country: South Sudan Region: Africa Focal Area: Biodiversity FA Strategic Framework: BD SO1 – SP3 FA Framework Objectives: SP3 - Strengthening Terrestrial Protected Areas GEF CEO Endorsement Date: November 2009 Project document Signature by March 2011 MWCT: Project document Signature by March 2011 UNDP: Planned Timeframe: Start: Sept 2010 Closure: Dec 2014 Actual Timeframe: June 2011 Dec 2016 Implementing Partner / Wildlife Conservation Society (WCS) Executing Agency: Implementation Modality: Implementation Partner (IP) Execution Other Responsible Parties: Project Cost: US$ 8,320,000 GEF PPG Grant: US$ 100,000 GEF Project Grant: US$ 3,820,000 Co-Financing: US$ 4,400,000 WCS US$1,300,000 Bilateral Aid (grant to US$2,100,000 WCS) Government US$1,000,000 TE Review Timeframe: Oct – Nov 2017 Evaluation Team: Philip Deng, National Consultant Richard Sobey, International Consultant / Team Leader TE Reporting Language: English Protected Area Network TE (UNDP PIMS #4000 / GEF #3748) Terminal Evaluation Report UNDP GEF Protected Area Network Management & Building Capacity in Post-Conflict South Sudan Table of Contents Executive Summary ........................................................................................................................... 1 Abbreviations and Acronyms ........................................................................................................... 10 1. Introduction ............................................................................................................................. 11 1.1. The project ..................................................................................................................... 11 1.2. Purpose of the review and report structure ................................................................ 11 1.3. Scope and Methodology ............................................................................................... 11 1.4. Ethics .............................................................................................................................. 12 1.5. Rating Scales .................................................................................................................. 12 2. Project Description ................................................................................................................... 12 2.1. Development Context ................................................................................................... 12 2.2. Problems that the Project Sought to Address .............................................................. 13 2.3. Project Description and Strategy .................................................................................. 14 2.4. Implementation Arrangements .................................................................................... 15 2.5 Key Partners & Stakeholders ........................................................................................ 15 2.6 Political and Civil Context ............................................................................................. 15 3. Findings ................................................................................................................................... 17 3.1. Project Strategy ............................................................................................................. 17 3.1.1 Project Design ................................................................................................................ 17 3.1.2 Design Assumptions & Risks ......................................................................................... 17 3.1.3 Results Framework Indicators & Targets ..................................................................... 18 3.1.4 Gender Analysis ............................................................................................................. 19 3.2. Project Implementation ................................................................................................ 19 3.2.1 IA and EA Coordination & Operational Management ................................................. 20 3.2.2 Partnership Arrangements & Stakeholder Engagement ............................................. 22 3.2.3 Finance & Co-finance ..................................................................................................... 23 3.2.4 M&E Systems – Design & Implementation .................................................................. 23 3.2.5 Adaptive Management (Work planning, Reporting & Communications) ................... 24 3.3. Project Results ............................................................................................................... 26 3.3.1 Overall Result – Achievement of Objective .................................................................. 26 3.3.2 Effectiveness – Achievement of Outcomes 1-3 ............................................................ 27 3.3.3 Achievement of Outputs ............................................................................................... 32 3.3.4 Efficiency ........................................................................................................................ 38 3.3.5 Relevance ....................................................................................................................... 39 3.3.6 Country Ownership & Mainstreaming ......................................................................... 39 4. Sustainability ........................................................................................................................... 39 4.1. Financial Risks to Sustainability .................................................................................... 40 4.2 Socio-economic Risks to Sustainability ........................................................................ 40 4.3. Institutional Framework & Governance Risks to Sustainability .................................. 40 4.3. Environmental Risks to Sustainability .......................................................................... 41 5. Impact & Catalytic Effect .......................................................................................................... 41 5.1. Impact ............................................................................................................................ 42 5.2. Catalytic Effect ............................................................................................................... 43 6. Conclusions and Recommendations .......................................................................................... 44 6.1 Conclusions .................................................................................................................... 44 6.2. Recommendations ........................................................................................................ 45 7. Annexes ................................................................................................................................... 47 Annex 1: Delivery of Project Objective and Outcomes against Performance Indicators ...... 47 Protected Area Network TE (UNDP PIMS #4000 / GEF #3748) Terminal Evaluation Report UNDP GEF Protected Area Network Management & Building Capacity in Post-Conflict South Sudan Annex 2: Delivery of Outputs ................................................................................................... 57 Annex 3: Co-financing Table .................................................................................................... 62 Annex 4: Planned Budget and Expenditures at End-term ...................................................... 63 Annex 5: Brief review of Technical reports, Training materials & delivery of courses ......... 64 Annex 6: List of Persons Interviewed ...................................................................................... 68 Annex 7: List of Documents Reviewed .................................................................................... 69 Annex 8: Risk Tables ................................................................................................................. 70 Annex 9: Stakeholder List......................................................................................................... 73 Annex 10: Rating Scales ........................................................................................................... 75 Annex 11: Mission Itinerary ....................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    101 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us