
Attachment L RALEIGH PARK HVAC AND ELECTRICAL UPGRADES BEAVERTON SCHOOL DISTRICT PROJECT MANUAL SPECIFICATIONS DIVISIONS 01-33 BID-PERMIT SET MARCH 4, 2020 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT BID-PERMIT SET SECTION 00 01 00 - SPECIFICATIONS TABLE OF CONTENTS PROJECT MANUAL - VOLUME 1 OF 2 DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 00 Specifications Table of Contents -- Remainder provided by Owner’s Project Representative -- Introductory Information Procurement Requirements Contracting Requirements DIVISION 01 - GENERAL REQUIREMENTS 01 10 00 Summary 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 56 39 Temporary Tree and Plant Protection 01 60 00 Product Requirements 01 61 16 Delegated Design Requirements 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training 01 91 13 General Commissioning Requirements DIVISION 02 -- EXISTING CONDITIONS 02 41 16 Structure Demolition 02 82 13.28 Asbestos Abatement DIVISION 03 -- CONCRETE 03 30 00 Cast-In-Place Concrete 03 51 13 Cementitious Wood Fiber Decks DIVISION 04 -- MASONRY – NOT USED – SPECIFICATIONS TABLE OF CONTENTS SECTION 00 01 00 - 1 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT BID-PERMIT SET DIVISION 05 -- METAL 05 50 00 Metal Fabrications DIVISION 06 -- WOOD AND PLASTIC 06 10 00 Rough Carpentry 06 41 00 Architectural Woodwork DIVISION 07 -- THERMAL AND MOISTURE PROTECTION 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories 07 84 13 Penetration Firestopping 07 92 00 Joint Sealants DIVISION 08 -- OPENINGS 08 11 13 Hollow Metal Doors and Frames DIVISION 09 -- FINISHES 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 65 00 Resilient Flooring and Accessories 09 91 13 Exterior Painting 09 91 23 Interior Painting DIVISION 10 -- SPECIALTIES – NOT USED – DIVISION 11 -- EQUIPMENT – NOT USED – DIVISION 12 -- FURNISHINGS – NOT USED – DIVISION 13 -- SPECIAL CONSTRUCTION – NOT USED – DIVISION 14 -- CONVEYING EQUIPMENT – NOT USED – PROJECT MANUAL - VOLUME 2 OF 2 DIVISION 01 - GENERAL REQUIREMENTS 00 01 00 Specifications Table of Contents DIVISION 21 – FIRE SUPPRESSION – NOT USED – SPECIFICATIONS TABLE OF CONTENTS SECTION 00 01 00 - 2 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT BID-PERMIT SET DIVISION 22 – PLUMBING 22 30 00 Plumbing Equipment DIVISION 23 – HEATING, VENTILATING AND COOLING 23 01 30.51 HVAC Air Distribution System Cleaning 23 05 13 Common Motor Requirements for HVAC Equipment 23 05 17 Sleeves and Sleeve Seals for HVAC Piping 23 05 19 Meters and Gauges for HVAC Piping 23 05 23 General-Duty Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 48 Vibration and Seismic Controls for HVAC 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 HVAC System Commissioning Requirements 23 09 13 Instrumentation and Control Devices for HVAC 23 09 23 Direct Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 14 Hydronic Specialties 23 23 00 Refrigerant Piping 23 25 00 HVAC Water Treatment 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 39 Destratification Fans 23 37 00 Air Outlets and Inlets 23 62 13 Packaged Air-Cooled Refrigerant Compressor and Condenser Units 23 73 13 Modular Indoor Central-Station Air-Handling Units 23 81 26.13 Small-Capacity Split-System Air Conditioners 23 81 29 Variable Refrigerant Flow HVAC Systems 23 82 23 Unit Ventilators DIVISION 26 – ELECTRICAL 26 05 05 Selective Demolition for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33.13 Conduit for Electrical Systems SPECIFICATIONS TABLE OF CONTENTS SECTION 00 01 00 - 3 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT BID-PERMIT SET 26 05 33.16 Boxes for Electrical Systems 26 05 33.23 Surface Raceways 26 05 53 Identification for Electrical Systems 26 05 73 Power System Studies 26 21 00 Low-Voltage Electrical Service Entrance 26 24 13 Switchboards 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16.16 Enclosed Switches 26 29 23 Variable Frequency Motor Controllers 26 43 00 Surge Protective Devices DIVISION 27 – COMMUNICATIONS – NOT USED – DIVISION 28 – ELECTRICAL SAFETY AND SECURITY 28 46 00 Fire Detection and Alarm DIVISION 31 – EARTHWORK – NOT USED – DIVISION 32 - EXTERIOR IMPROVEMENTS 32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 31 13 Chain Link Fences and Gates DIVISION 33 – UTILITIES – NOT USED – END OF TABLE OF CONTENTS SPECIFICATIONS TABLE OF CONTENTS SECTION 00 01 00 - 4 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT BID-PERMIT SET SECTION 01 10 00 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Project information. 2. Work covered by Contract Documents. 3. Phased construction. 4. Work by Owner. 5. Work under separate contracts. 6. Future work. 7. Purchase contracts. 8. Owner-furnished products. 9. Contractor-furnished, Owner-installed products. 10. Access to site. 11. Coordination with occupants. 12. Work restrictions. 13. Specification and Drawing conventions. 14. Miscellaneous provisions. B. Related Requirements: 1. Section 01 50 00 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities. 1.3 PROJECT INFORMATION A. Project Identification: 1. Raleigh Park HVAC and Electrical Upgrades. 2. Project Location: 3670 SW 78th Ave., Portland, OR 97225. B. Owner: Beaverton School District. Owner's Representative: Megan Finch. 16550 SW Merlo Road Beaverton, OR 97003 (503) 356-4318 C. Architect: Yost Grube Hall Architecture. SUMMARY SECTION 01 10 00 - 1 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT BID-PERMIT SET D. Web-Based Project Software: Project software administered by Owner will be used for purposes of managing communication and documents during the construction stage. 1. See Beaverton School District standards for requirements for using web-based Project software. 1.4 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Architectural, structural, and electrical renovations required to update the HVAC system throughout the building. B. Type of Contract: 1. Project will be constructed under a single prime contract (per AIA documents A101-2017 and AIA 2017). C. Project Considerations: 1. The school will be vacated by the end of June 2020 and the new Mechanical and Electrical upgrades must be operational at the beginning of the 2020 school year. 2. Hazardous material abatement will be done by the District (BSD) under separate contract. General Contractor shall coordinate scheduling, demolition, and building locations with abatement subcontractor, District Representative, and District Consultant. New construction shall not commence until completion of hazardous material abatement. D. Services to Provide: 1. Once through the solicitation process, the awarded Contractor is responsible for providing a complete project per the Construction Documents including materials, labor, equipment and coordination with the District and the design team. E. Specific Construction Services Description: 1. Coordinate weekly construction meetings with the District and the design team. 2. Prepare site and building logistics plans to encompass all proposed activities and impacts to the site, adjacent properties, and neighboring streets. 3. Fully coordinate the work of subcontractors and suppliers. Provide regular and on-going quality inspection and assistance to the design team in ensuring that the Work meets the Specifications and applicable codes. 4. Coordinate inspections with the authority have jurisdiction (AHJ) and third-party special inspections (provided by the District). 5. Review and expedite Change Order requests and maintain logs. 6. Coordinate with BSD FF&E efforts. 7. Monitor compliance with payment of prevailing wages on all contracts and subcontracts, per ORS 279C. 8. Maintain in a current condition Project Records including, but not necessarily limited to permits, Construction Documents, as-built records, meeting records, submittals, inspection reports, invoices, delivery receipts, daily activity logs, Requests for Information (RFI); RFI logs; Submittals; Submittal Logs; Inspection Reports; Change Order Proposals (COP); COP logs; Change Orders (CO); CO logs; Construction Change Directives (CCD); CCD logs; Architect’s Supplemental Instructions (ASI); ASI logs; Permits; Project Allowance(s) Reconciliation; Project Contingency status reports; and Project Schedule updates. 9. Transmit copies of MWESB Contact Logs, Career Learning Reports and Apprenticeship Program Logs monthly via eBuilder (as required). SUMMARY SECTION 01 10 00 - 2 RALEIGH PARK HVAC AND ELECTRICAL UPGRADES MARCH 4, 2020 BEAVERTON SCHOOL DISTRICT
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages553 Page
-
File Size-