Drilling and Workover Efficiency Save USD 26 Million for PDVSA Case Study: Project Management Techniques Boost Output by 6,000 Bbl/D in Venezuela

Drilling and Workover Efficiency Save USD 26 Million for PDVSA Case Study: Project Management Techniques Boost Output by 6,000 Bbl/D in Venezuela

Drilling and Workover Efficiency Save USD 26 Million for PDVSA Case study: Project management techniques boost output by 6,000 bbl/d in Venezuela Challenge More economical ways to drill and work over wells Petróleos de Venezuela (PDVSA) As part of a late 1990s plan to increase production in Venezuela, PDVSA sought sought more economical ways to more economical ways to drill and work over wells in Lake Maracaibo. Schlumberger drill and work over wells in Lake helped solve this challenge by applying an integrated approach to project management Maracaibo. and introducing a range of new technologies. Solution Project management alliance The Schlumberger Integrated The companies formed a 10-year alliance, PRISA, in which Schlumberger operates Project Management (IPM) team an oil field on behalf of PDVSA to improve productivity and achieve shared goals. and PDVSA formed a 10-year The project management scope covers all phases of operations, from planning to job alliance in which Schlumberger execution and analysis. operates an oil field on behalf of By January 2000, the PRISA project was fully mobilized with 6 multipurpose drilling PDVSA to improve productivity and workover vessels and 645 Schlumberger personnel in place. The PRISA project and achieve shared goals. The team creatively manages drilling and workover rigs and services, barges, tugs, and project management scope cov- crew boats. ers all phases of operations, from planning to job execution and analysis. Results New practices and services have resulted in a production increase of 6,000 bbl/d above expectations, an 11% decrease in the cost per barrel produced, savings of USD 26 million for PDVSA, and improved geological field models. The PRISA team drilled and worked over more than 200 wells ahead of schedule. Integrated Project Management Case study: Project management techniques boost output by 6,000 bbl/d in Venezuela Production increase and cost savings Schlumberger has introduced many new practices and services to the Lake Maracaibo project, resulting in I a production increase of 6,000 bbl/d above expectations I an 11% decrease in the cost per barrel produced I savings of USD 26 million for PDVSA I improved geological field models. E-mail [email protected] or contact your local Schlumberger representative to learn more. www.slb.com/ipm 06-IP-018 December 2006 *Mark of Schlumberger Copyright © 2006 Schlumberger. All rights reserved. Produced by Schlumberger Marketing Communications.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us